Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹9.4 Laccepted-finance | ₹9.4 L | accepted-finance |
Tender Value
₹11.8 L
EMD Value
₹18,750
Closing Date
24 Feb 2026, 11:00 pmClosed
Koppal Urban Development Authority
P-1Development of Garden and construction of Compound wall and at Amruteshwar Temple Premises Behind Gavimath At Koppal. (CAT-I)
KUDA/2025-26/OW/WORK_INDENT14
KUDA/2025-26/OW/WORK_INDENT14
Reserved
Other Works
KUDA Commissioner Office Koppal
₹500
₹18,750
24 Feb 2026
11 Feb 2026
26 Feb 2026
12 Feb 2026
P-1Development of Garden and construction of Compound wall and at Amruteshwar Temple Premises Behind Gavimath At Koppal. (CAT-I)
code01 Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, inc... 2.43 Cum
code02 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes... 0.16 Cum
code03 Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Vol-II, P No.09, I No5.4 Rate:6389/-) 18.23 Cum
code04 Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel et... 800.80 Kg
code05 Providing and laying flooring with burnt stone slabs 10 cms thick rough chistle dressed on cement mortar bed 1:6, 25 mm thick, and pointed with cement mortar 1:3, , including cost of materials, mortar... 341.00 Sqm
code06 SCRAPPING AND REMOVING TOP SOIL :-Scrapping the area by removing 0.15m soil and removing of unwanted plants,grass along with roots.25km initial transport, including lead, lift loading and unloading ch... 168.00 Sqm
code07 1ST DIGGING:-Digging of the area for developing lawn including removing weeds, debris if any and breaking of clumps, watering etc. (1x1x0.45mt) (Vol-Forest SR 2022-23, P NO. 61, I No 12.10(B), Rate:75... 168.00 Sqm
code08 Supply of inputs such as sand, FYM, Red earth in 1:3:6 ratio.mixing and spreadingthe mixture to 7.50cm thickness wherever required (Vol-Forest SR 2022-23, P NO. 61, I No 12.10(E), Rate:93.06/red soil ... 168.00 Sqm
code09 Procurement of quality lawn grass (Vol-Forest SR 2022-23, P NO. 61, I No 12.10(G), Rate:100/Sqm) 168.00 Sqm
code10 Labour Charges-Mixing Inputs as per prescribed proportion and quantity and spreading, applying fertilizers,digging, levelling , and dibbling with lawn grass at a spacing of 5cm x5cm & as per the direc... 168.00 Sqm
code11 Preparation of Duranta / Glyricidia cuttings of 3 length, conveyance on headload up to motorable roadside, loading into truck, unloading from the truck, conveyance by head-load up to planting site and... 6.00 Nos
code12 Transportation of Duranta / Glyricidia cuttings of 3 length (ceiling rate)(Vol-Forest SR 2022-23, P NO. 41, I No 7.9(C), Rate:308.29/1000cuttings) 6.00 Nos
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
1kw-1-14CAT-I.doc
Tender Document • 4.77 MB
Download all tender documents and submit your bid