| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC FALAKATA ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 735204 | ₹25.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.3 L+₹6,081.65 (0.24%)Rejected-AOC | ₹25.3 L+₹6,081.65 (0.24%) | L2 | Rejected-AOC L2 |
| 3 | L3₹25.3 L+₹6,588.46 (0.26%)Rejected-Finance VILLAGE BENJTABANI P O BAIDYANATHPUR DISTRICT BANKURA | BANKURA | WEST BENGAL | 722101 | ₹25.3 L+₹6,588.46 (0.26%) | L3 | Rejected-Finance L3 |
| 4 | L4₹25.3 L+₹7,855.46 (0.31%)Rejected-Finance 24 EAST AVENUE BIDHAN NAGAR MIDNAPORE PASCHIM MEDINIPUR WEST BENGAL 721101 | MIDNAPORE | PASCHIM MEDINIPUR | WEST BENGAL | 721101 | ₹25.3 L+₹7,855.46 (0.31%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹50,680
Closing Date
11 Mar 2026, 2:00 pmClosed
District Planning Officer, Alipurduar
Dooars Kanya, Alipurduar
Construction of building and machine for operation theatre OPD of Nripen Mitra and Sovana Mitra Seva Samiti, Muktipara, Falakata, Alipurduar.
2026_DMA_1014975_1
06/VI-PLAN/2026
Open Tender
CIVIL WORKS
Percentage
Alipurduar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹50,680
Yes
13 Jul 2026
26 Feb 2026
13 Mar 2026
26 Feb 2026
11 Mar 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts soil including removing spreading , or stacking the spoil within a lead of 75 m as directed including trimming the sides of trenches , levelling , dressing and ramming the bottom , bailing out water as required etc | 152.58 | cum | 119.27 | ₹18,198.22 |
| 2 | Filling in foundation or plinth with good earth in layers not exceeding 150mm including watering and ramming etc layer by layer complete ( payment to be made on basis of measurement of finished quantity of work.
a)With earth obtained from excavation of foundation
1/5th of total E/W in excavation | 30.52 | cum | 77.54 | ₹2,366.21 |
| 3 | Filling in foundation or plinth by silver sand in layers not exceeding 150mm as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand (payment will be made on measurement of finished quantity) Under Floor
B)D-by sand | 50.59 | cum | 521.07 | ₹26,360.41 |
| 4 | Single brick soling with picked jhamma bricks including preparation of bed as necessary with brick joints properly filled in the packed with powdered earth and including necessary caushion of similar material below the soling (and in between layers when more than one layer is used) complete as per direction | 130.38 | sqm | 324 | ₹42,243.12 |
| 5 | (I)Cement concrete with graded stone ballast (40mm size excluding shuttering in ground Floor.
B) NB Variety
(a) 1:3:6 proportion | 14.35 | cum | 3,573.34 | ₹51,277.43 |
| 6 | 25mm thick damp proof course with cement concrete with stone chips (1:1:5:3) (with graded stone aggregates 10mm nominal size) and admixture of water proofing compound as per manufacturers specification followed by two coat of polymer based paint (1st coat after 4 to 5 days of concrete laying and 2nd coat just before brick masonary work ) as directed ( cost of water proofing compound and polymer based paint to be paid separately) . The quering not required over concrete or painted surface | 28.87 | sqm | 196 | ₹5,658.52 |
| 7 | Brick work with 1st class bricked in cement mortar (1:6) in ground floor. | 11.5 | cum | 4,896 | ₹56,304 |
| 8 | 125mm brick work with 1st class bricks in cement mortar | 415.98 | sqm | 674 | ₹2,80,370.52 |
| 9 | Ordinary Cement Concrete ( mix 1:1.5:3) with graded river bazree (20mm nominal size) excluding shuttering and reinforcement.
Rver Bazree | 78.87 | cum | 4,510.2 | ₹3,55,719.47 |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars . stirrups, binder etc. including supply of rods , initial straightening and removal of loose rust ( in necessary) , cutting to requisite length , hooking and bending to correct shape ,placing in proper position and binding with 16 gauge black annealed wire at every intersection , complete as per drawing and direction | 6.19 | MT | 66,042.63 | ₹4,08,869.92 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.53 MB
BOQ_2493021.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .