Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹141.3 CrAdmitted-Finance 249 NEW MODEL TOWN LUDHIANA | LUDHIANA | PUNJAB | 141001 | L1 | Admitted-Finance | |
| 2 | L2₹142.7 Cr+₹1.4 Cr (0.96%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹144.2 Cr+₹2.9 Cr (2.02%)Admitted-Finance BHASKAR NAGAR BYE LANE NO 2 GUWAHATI 21 | SOUTH SALMARA MANCACHAR | ASSAM | 783127 | L3 | Admitted-Finance | |
| 4 | L4₹144.4 Cr+₹3.0 Cr (2.13%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹148.4 Cr+₹7.1 Cr (5.02%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VISHWA SAMUDRA ENGINEERING PRIVATE LIMITED L9 | MANISHA PROJECTS PRIVATE LIMITED L4 | S S BUILDERS L1 | Dev Yash Projects and Infrastructure Pvt Ltd L12 | ANUPAM NIRMAN PVT LTD L3 | M/s Buru Enterprises L2 | M/S RISHIRAJ CONSTRUCTION L8 | Niraj Cement Structurals Ltd L6 | E5 Infrastructure Private Limited L5 | Vijeta Projects and Infrastructures Limited and BKSONS Infrastructure Pvt. Ltd.-JV L10 | KRC Infraprojects Private Limited L7 | M K Engineering L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 81+000 to km 95+400 (Design Chainage 80+930 to 96+400) of Loring Thepi – Ganapath Gaur Gaon Section - (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode | 1 | Lump Sum | 1,61,10,00,000 ₹1,61,10,00,000 | 1,44,36,00,000 ₹1,44,36,00,000 | 1,41,35,00,000 ₹1,41,35,00,000 Lowest | 1,93,00,00,000 ₹1,93,00,00,000 | 1,44,20,00,000 ₹1,44,20,00,000 | 1,42,70,70,000 ₹1,42,70,70,000 | 1,60,85,91,600 ₹1,60,85,91,600 | 1,52,99,00,000 ₹1,52,99,00,000 | 1,48,45,00,000 ₹1,48,45,00,000 | 1,61,84,70,000 ₹1,61,84,70,000 | 1,53,64,44,000 ₹1,53,64,44,000 | 1,88,74,80,000 ₹1,88,74,80,000 |
Tender Value
₹176.4 Cr
Closing Date
7 Oct 2020, 11:00 amClosed
K C Bhatt
K.C.Bhatt DGM (Technical) National Highway and Infrastructure Development Corporation Ltd. PTI Building, 3rd Floor, 4 Parliament Street, New Delhi-110001
Widening/Improvement to 4 Lane with Paved Shoulder from km 81.000 to km 95.400 (Design Chainage 80.930 to 96.400) of Loring Thepi Ganapath Gaur Gaon Section (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode
2020_NHIDC_558087_1
NHIDCL/Assam/NH-29/Dab-Man/ Pkg-4/2020
Open Tender
Civil Works
EPC Contract
548 days
Assam
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ
20 Jan 2021
6 May 2020
8 Oct 2020
6 May 2020
7 Oct 2020
22 Jun 2020
6 May 2020 - 15 Jun 2020
15 Jun 2020
Amount
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 81+000 to km 95+400 (Design Chainage 80+930 to 96+400) of Loring Thepi – Ganapath Gaur Gaon Section - (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode
M/s Buru Enterprises
ANUPAM NIRMAN PVT LTD
MANISHA PROJECTS PRIVATE LIMITED
E5 Infrastructure Private Limited
Niraj Cement Structurals Ltd
KRC Infraprojects Private Limited
M/S RISHIRAJ CONSTRUCTION
VISHWA SAMUDRA ENGINEERING PRIVATE LIMITED
Vijeta Projects and Infrastructures Limited and BKSONS Infrastructure Pvt. Ltd.-JV
M K Engineering
Dev Yash Projects and Infrastructure Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .