Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
2 Sept 2026, 6:00 pm
EXECUTIVE ENGINEER W.D.S.C PS TIJARA
EXECUTIVE ENGINEER W.D.S.C PS TIJARA
Construction of anicut, Percolation Tank, MPT, Johad renovation, PCD, Peripheral Bund and ECD in MJSA-2.0 Phase II Block Tijara (Package No. 01)
2026_WDSC_586477_1
NIT No 01/2026-27 Block Tijara (Package No 01)
Open Tender
Civil Works
Percentage
270 days
Tijara
Scanned copy of e-grass challan of TD Cost, Bid security declaration, and tender processing fees (e-procurement process fees), With TD along with Annexures
2 documents required · 2 mandatory
₹2,000
SE and PM WCDC Khairthal-Tijara DDO-42825
₹4.4 L
Yes
EXECUTIVE ENGINEER W.D.S.C PS TIJARA
13 Aug 2026
13 Aug 2026
3 Sept 2026
13 Aug 2026
2 Sept 2026
13 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | जंगल की सफाई, भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। | 77,030 | Sqm. | 3.6 | ₹2,77,308 |
| 2 | डागबेलिंग करना 5 सेमी. से 7.5 सेमी. गहराई तक | 30,546 | Rmt | 1.71 | ₹52,233.66 |
| 3 | Benching base and disposal of the excavated material including dressing etc. complete within initial lead upto 50m and lift upto 1.5m | 7,556 | Cum. | 87.3 | ₹6,59,638.8 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth with in initial lead of 50m and lift up to1.5m including dressing of excavated area and dewatering wherever required complete in all respect (a) In Hard Soil | - | Cum. | 83.7 | - |
| 5 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) | 1,07,422.3 | Cum. | 65.25 | ₹70,09,305.08 |
| 6 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) | - | Cum. | 22.5 | - |
| 7 | Watering of earth including cost of carriage of water when source of water is up to 5 Km | - | Cum. | 29.34 | - |
| 8 | Earth work in execavation including loading unloading,disposaland dressing of execavated earth within initial lead of 50M and lift upto1.5m in dry or moist including dressing of execavated area with cost of dewatering wherever required and all applicable taxes and levies etc.complete in all respect.Soft soil | - | Cum. | 82.8 | - |
| 9 | Extra lead over item no 3 of excavated material.or lead beyond 250m & upto 750m (TOTAL LEAD upto 1.25 KM.) | 3,015 | Cum | 16.42 | ₹49,506.3 |
| 10 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। | - | Cum. | 3,899.97 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
NIT01-PackageNo01BlockTijara.pdf
Tender Documents • 7.08 MB
BOQ_1041697.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].