Loading…
Loading…
Tender Value
₹7.7 L
EMD Value
₹7,710
Closing Date
4 Jun 2026, 5:00 pmClosed
Executive Engineer Irr Div no 2 Hanumakonda
O/o IRRIGATION DIVISION NO.02, NAKKALAGUTTA, HANUMAKONDA
O and M 2025- Repairs to breach portion of Feeder Channel from konaichalam to Konareddy Cheruvu near Bandouthapur (V), Wardhannapet(M) Of Warangal (Dist) (2nd call) (Invited under earmarked works- Waddera/Sagara belonging to such communities as the case may be are only eligible to participate)
704901
02/2026-27 (O&M)
OPEN
Civil Works
WARANGAL RURAL
8 documents required · 8 mandatory
₹273
₹7,710
30 May 2026
30 May 2026
1 Jun 2026
Excavation for Structures- Mechanical Means ( Data adopted from MORTH)Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ( depth upto 3 meters)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender booklet -Bandouthapur.docx
TENDER_DOCUMENT • 0.47 MB
BOQ-Bandouthapur.xls
TENDER_DOCUMENT • 0.64 MB
NIT -Bandouthapur.docx
TENDER_DOCUMENT • 0.12 MB
Schedule A -Bandouthapur.xls
TENDER_DOCUMENT • 0.87 MB
Download all tender documents and submit your bid