| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC VILLAGE P O BARIN MANDIR TEHSIL TOUNI DEVI DISTT HAMIRPUR H P | L1 | Accepted-AOC l1 | |
| 2 | L2₹1.5 L+₹9,327.16 (6.42%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.6 L+₹14,383 (9.90%)Rejected-AOC VILLAGE RASWALA P O DEOTHI TEHSIL DISTT SOLAN | SOLAN | SOLAN | HIMACHAL PRADESH | L3 | Rejected-AOC L3 | |
| 4 | l4₹1.6 L+₹15,211 (10.5%)Rejected-AOC | l4 | Rejected-AOC L4 | |
| 5 | l5₹1.6 L+₹15,568 (10.7%)Rejected-AOC | l5 | Rejected-AOC L5 |
Tender Value
₹1.3 L
EMD Value
₹3,250
Closing Date
6 Feb 2020, 5:00 pmClosed
Executive Officer MC Solan
Executive Officer MC Solan
Construction of Pucca Nallah from Sharma Bhawan to Bal Chand, MadanRawat and other in ward no.11 Solan Deposit work.
2020_UDDHP_34424_1
TEN(5)20/2019-415-17,23/01/20
Open Tender
Civil Works
Item Rate
60 days
MC Solan
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Officer MC Solan
₹3,250
4 May 2021
30 Jan 2020
7 Feb 2020
30 Jan 2020
6 Feb 2020
30 Jan 2020
Amount
Earth work in excavation for structures in all depths as per drawings and technical specification as per Clause 305.1(Three hundred Five point One) of MORD specifications 300 (three hundred) including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated Suitable materials.as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing and laying cement concrete 1:6:12 (1 cement:6 sand :12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in: Foundation and plinth. as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing form work with steel plates 3.15 (Three point One Five ) millimetres thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five ) millimetres, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies in all heights of propping and cantering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges in:i) Flat surfaces such as soffits of suspended floors, roofs, landings and the like.
Providing and laying cement concrete 1:2:4(1 cement:2 sand :4 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work in:Foundation and plinth.as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing and laying cement concrete 1:2:4 [ One cement isto Two sand isto Four graded hard stone aggregate 20(Twenty) millimetres nominal size] conforming mechanically mixed, vibrated and curing complete, excluding cost of form work and reinforcement for reinforced concrete work, as per H.P. PWD. Specification 1990 volume - I, including carriage of all labour, equipments and materials to various locations through all modes of transportation in all leads and lifts, including all incidental charges i) Suspended Floors, roofs and landing, shelves and their support in all floors up to all heights and levels.
Random rubble masonry/polygonal rubble masonry (uncoursed/brought to courses) with hard stones of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12(1 cement :6 sand : 12 gradedstone aggregate 20mm nominal size) at plinth level in Cement Mortar 1:6(1 cement:6 sand). as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position including cost of binding wire complete as per structural drawing in all floors up to all heights and levels, direction of Engineer-in-Charge and as per HP.PWD. Specification, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges.
Steel work welded in built up sections, trusses and framed work, including cutting, hoisting in all heights and levels, fixing in position and applying a priming coat of red lead paint completer in all respect as per structural design, drawing ,direction of the Engineer-in-Charge and as per HP.PWD. Specification 1990 volume-I, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges
BHUPENDER SINGH THAKUR
Virender Thakur
Brothers Traders
AP Associates
RAMESH CHAND
Parminder Dhiman
Vikram Thakur
Prashant Kashyap
Vinay SHarma
Bhupender Jaswal Contractor
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .