Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹55.2 LAccepted-AOC | ₹55.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹55.3 LRejected-AOC | ₹55.3 L | 2 | Rejected-AOC L2 |
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
26 Feb 2026, 3:00 pmClosed
DISTRICT ENGINEER, ZILA PARISHAD, BOKARO
ZILA PARISHAD BOKARO
CONSTRUCTION OF HEALTH SUB CENTER AT KUMIRDOBHA UNDER CHANDANKIYARI BLOCK IN BOKARO
2026_ZPBOK_110425_1
ZP/BOKARO/02/2025-26
Open Tender
Civil Works
Percentage
270 days
BOKARO
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
27 May 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | excavation in foundation trenches in ordinary soil ( vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design,
building specification and direction of E/I. | 65.04 | CUM | 151.82 | ₹9,874.37 |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil
item-B) | 65.04 | CUM | 15.51 | ₹1,008.77 |
| 3 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume)all complete as per approved design, building specification and direction of E/I. | 50.44 | CUM | 55.28 | ₹2,788.32 |
| 4 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume)all complete as per approved design, building specification and
direction of E/I. | 32.57 | CUM | 589.51 | ₹19,200.34 |
| 5 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 149.01 | SQM | 330.34 | ₹49,223.96 |
| 6 | Providing and laying in position cement concete of soecified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)all complete as per approved design, building specification and
direction of E/I. | 17.8 | CUM | 4,598.24 | ₹81,848.67 |
| 7 | Providing and laying in position specified grade of reinforced cement concerte, excluding the cost of centering, shutteing, finishing and reinforcement- All work up to pilnth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)all complete as per approved design, building specification and direction of E/I. | 15.81 | CUM | 5,218 | ₹82,496.58 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1 :1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) all complete as per approved design, building specification and direction of E/I. | 25.24 | CUM | 6,082.45 | ₹1,53,521.04 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15°
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and | 34.86 | CUM | 6,308.87 | ₹2,19,927.21 |
| 10 | Providing tor steel reinforcement as per approved design & drawingall complete as per approved design, building specification and direction of E/I. Providing Tor steel
reinforcement of 8mm,dia rods as per approved design and drawing -do- -do- TMT Fe 500 ( Only | 1.82 | MT | 83,314.02 | ₹1,51,631.52 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
kumirdobha.pdf
Tender Documents • 0.74 MB
BOQ_149299.xls
BOQ • 0.54 MB
kumirdobhacorr.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].