Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.9 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹18.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹19.4 L+₹48,601 (2.57%)Admitted-Fee/PreQual/Technical/Finance | -28.20% | ₹19.4 L+₹48,601 (2.57%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.7 L+₹81,001.67 (4.29%)Admitted-Fee/PreQual/Technical/Finance | -27.00% | ₹19.7 L+₹81,001.67 (4.29%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
Tender Value
₹27 L
EMD Value
₹54,000
Closing Date
18 Aug 2026, 4:00 pmClosed
EE Mahore
Mahore
BOQ
2026_PWDJK_317989_2
Short e-NIT No. 23 of 2026-27 Dated 27/07/2026
Open Tender
Civil Works
Percentage
90 days
Mahore
NIT
2 documents required · 2 mandatory
₹600
eepwd
₹54,000
27 Aug 2026
27 Jul 2026
19 Aug 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil. | 203.91 | cum | 576.45 | ₹1,17,543.92 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 22.43 | cum | 4,826.5 | ₹1,08,258.4 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% Boulders | 101.95 | cum | 4,223.52 | ₹4,30,587.86 |
| 4 | Dumping stone excluding cost of stone in Horizontal on level 30% qty of item no 3 | 30.59 | cum | 237.9 | ₹7,277.36 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 84.96 | cum | 7,571.55 | ₹6,43,278.89 |
| 6 | 12mm cement sand plaster in 1:6 in cement and fine sand | 371.75 | Sqm | 266.2 | ₹98,959.85 |
| 7 | 15 mm cement sand plaster in 1:6 in cement and fine sand on rough side | 371.75 | Sqm | 306.85 | ₹1,14,071.49 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundation and mass cocrete , etc. | 431.23 | Sqm | 286.55 | ₹1,23,568.96 |
| 9 | Finishing walls with water proofing cement paint of required shade onNew work (two or more coats applied @ 3.84 kg/10sqm) qty vide item no 6 & 7 | 743.49 | Sqm | 98.75 | ₹73,419.64 |
| 10 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 654.42 | Kg | 120.8 | ₹79,053.94 |
stage.html
html • 0.02 MB
finance_1045241.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_1045241.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .