| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.4 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹75.6 Cr+₹10.2 Cr (15.7%)Admitted-Finance PRA HOUSE NEHRU PARK ROAD SURAJPUR SURAJPUR CHHATTISGARH 497229 | SURAJPUR | CHHATTISGARH | 497229 | L2 | Admitted-Finance | |
| 3 | L3₹82.1 Cr+₹16.7 Cr (25.6%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹89.7 Cr+₹24.3 Cr (37.2%)Admitted-Finance BANK COLONY ROAD PISKA MORE PISKA PANDRA RANCHI | RANCHI | RANCHI | JHARKHAND | L4 | Admitted-Finance | |
| 5 | L5₹89.9 Cr+₹24.5 Cr (37.5%)Admitted-Finance 614 HARIOM TOWER COMMERCIAL COMPLEX CIRCULAR ROAD LALPUR RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Barbrik Project Limited L2 | MINI CONSTRUCTION L1 | M G Contractors Pvt Ltd L3 | RAJBIR CONSTRUCTION PVT. LTD. L5 | M/s Ganga Construction L4 | KAMAC ENGINEERS PRIVATE LTD L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
In area of light jungle | 37.5 | Hect. | 20,000 ₹7,50,000 | 15,000 ₹5,62,500 Lowest | 22,400 ₹8,40,000 | 20,866.32 ₹7,82,487 | 20,809.15 ₹7,80,343.13 | 20,923.49 ₹7,84,630.88 |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 300 mm to 600 mm | 148 | Each | 25 ₹3,700 Lowest | 175 ₹25,900 | 250 ₹37,000 | 258.42 ₹38,246.16 | 100 ₹14,800 | 259.13 ₹38,351.24 |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 600 mm to 900 mm | 153 | Each | 35 ₹5,355 Lowest | 290 ₹44,370 | 300 ₹45,900 | 423.77 ₹64,836.81 | 100 ₹15,300 | 424.93 ₹65,013.68 |
| 4.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the
Girth from 900 mm to 1800 mm | 92 | Each | 50 ₹4,600 Lowest | 595 ₹54,740 | 1,000 ₹92,000 | 881.48 ₹81,096.16 | 500 ₹46,000 | 883.89 ₹81,317.88 |
| 5.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth above 1800 mm | 106 | Each | 100 ₹10,600 Lowest | 1,160 ₹1,22,960 | 1,500 ₹1,59,000 | 1,719.15 ₹1,82,229.9 | 1,000 ₹1,06,000 | 1,723.86 ₹1,82,729.16 |
| 6.00 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.) | 80,127 | Sqm. | 5 ₹4,00,635 Lowest | 6 ₹4,80,762 | 50 ₹40,06,350 | 6.57 ₹5,26,434.39 | 6.55 ₹5,24,831.85 | 6.59 ₹5,28,036.93 |
| 7.00 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) | 690 | Cum. | 150 ₹1,03,500 Lowest | 150 ₹1,03,500 Lowest | 250 ₹1,72,500 | 284.7 ₹1,96,443 | 283.92 ₹1,95,904.8 | 285.48 ₹1,96,981.2 |
| 8.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
Dismantling Stone Masonry
Rubble stone masonry in cement mortar. | 583.68 | Cum. | 150 ₹87,552 Lowest | 150 ₹87,552 Lowest | 300 ₹1,75,104 | 284.7 ₹1,66,173.7 | 283.92 ₹1,65,718.43 | 285.48 ₹1,66,628.97 |
| 9.00 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
IIncluding Royalty @ Rs. 30.00 per cum but excluding the cost of watering, rolling & compaction. | 2,17,997 | Cum. | 75 ₹1,63,49,775 Lowest | 85 ₹1,85,29,745 | 100 ₹2,17,99,700 | 127.02 ₹2,76,89,978.94 | 150 ₹3,26,99,550 | 127.37 ₹2,77,66,277.89 |
| 10.00 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)
Rolling with vibratory roller | 2,08,517 | Cum. | 60 ₹1,25,11,020 | 45 ₹93,83,265 Lowest | 80 ₹1,66,81,360 | 55.85 ₹1,16,45,674.45 | 130 ₹2,71,07,210 | 56 ₹1,16,76,952 |
Tender Value
₹82.1 Cr
EMD Value
₹82.1 L
Closing Date
25 Aug 2021, 12:00 pmClosed
Executive Engineer RCD, Road Divison, Latehar
Executive Engineer, Road Construction Department Road Divisiion, Latehar
Re-Construction of Kuro More (On SH-09) to Banskarcha Road (On SH-09) Via Barahi , Parhatoli (Total Length - 29.35 Km) with bridge work for the Year of 2021-22
2021_CECOM_50915_1
RCD/LATEHAR-658/2021-22
Open Tender
Civil Works
Item Rate
730 days
Kuro More (On SH-09) to Banskarcha Road (On SH-09)
As per SBD
3 documents required · 3 mandatory
₹10,000
E.E. RCD ROAD DIVISION LATEHAR
₹82.1 L
Office of the Chief Engineer (Comm.) RCD, Ranchi
16 Sept 2021
4 Aug 2021
27 Aug 2021
4 Aug 2021
25 Aug 2021
4 Aug 2021
11 Aug 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
In area of light jungle | 37.5 | Hect. | - | - |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 300 mm to 600 mm | 148 | Each | - | - |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 600 mm to 900 mm | 153 | Each | - | - |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the
Girth from 900 mm to 1800 mm | 92 | Each | - | - |
| 5 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth above 1800 mm | 106 | Each | - | - |
| 6 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.) | 80,127 | Sqm. | - | - |
| 7 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) | 690 | Cum. | - | - |
| 8 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
Dismantling Stone Masonry
Rubble stone masonry in cement mortar. | 583.68 | Cum. | - | - |
| 9 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
IIncluding Royalty @ Rs. 30.00 per cum but excluding the cost of watering, rolling & compaction. | 2,17,997 | Cum. | - | - |
| 10 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)
Rolling with vibratory roller | 2,08,517 | Cum. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_67886.xls
BOQ • 0.33 MB
SBD.pdf
Additional Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .