Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
12 Nov 2020, 11:00 amClosed
Chief Engineer
First Floor, ALPS Building, 56 Janpath, Connaught Place, New Delhi-110001
Drilling, Collection of Litholog, Geophysical logging interpretation, Slug Test, PYT, Pumping test, construction of plate form, installation of name board, installation of MS well cap, clamp and protection box, preparation of Basic Data Reports
2020_WAPCO_59362_2
WAP/GWRDM/BIHAR-JH/EXP/2020
Open Tender
Drilling Works
Works
90 days
Bihar and Jharkhand/ Drilling of Wells
As per Eligibility and Qualification Requirements under Chapter - 1
12 documents required · 12 mandatory
₹0
₹2.5 L
Yes
1st Floor ALPS Building New Delhi
30 Aug 2022
2 Nov 2020
13 Nov 2020
2 Nov 2020
12 Nov 2020
6 Nov 2020
6 Nov 2020
Amount
Drilling, Installation of Casing Pipe, Geophysical Logging, Pumping Tests, Slug tests & PYT in Exploratory Wells
Drilling of overburden by rock roller/ drag/ button bit to accommodate casing pipe including sample collection, preparation and submission of litholog
Supply and installation of ERW casing pipe 175 mm (7") Nominal Bore conforming to Table 3 of latest version of IS: 4270-2001 as given below
Drilling by DTH method using appropriate sizes of button bits so as to reach targetted depth with diameter of hole not less than 165 mm at 100 m depth and final diameter not less than 152 mm at hole bottom including measurement of discharge through V-notch at various stages (depth) of drilling, collection of water samples of each Aquifer formation/ fracture zone encountered, adopting standard procedure, formation sample collection at every 3 m intervals, preparation and submisison of litholog, discharge measurements etc., sample collection and preperation of litholog
Electrical Logging using 406 mm and 1626 mm (16" and 64") SP resistivity probe and preperation of coposite log
Caliper Logging, submission of logging graph, report
Pumping Test incuding prepumping for 8 hours and recuperation for 24 hours, SDT (4 steps), APT for 1000 minutes and 90% or full recovery) and collection of 4 nos. water sample adopting standard procedure for basic parameter and heavy metals in 1 litre good quality HDPE bottle
Preliminary yield test collection of 2 nos. water samples adopting standard procedure for basic parameter and heavy metals in 1 litre good quality HDPE bottle and submission of analysis report with data
Slug test and subission of report with data
Chemical analysis of water samples for 15 parameters Ph, EC, TH, TDS, Ca, Mg, Na, K, CO3, HCO3, SO4, NO3, Cl, F, & Fe, in NABL accredited labs and submission from NABL lab
Chemical analysis of water samples for Heavy metals Arsenic, Cadmium, Mercury, Lead, in NABL accredited labs and submission from NABL lab
Construction of cement concrete platform 0.70 x 0.70 x 0.60 m ( 0.30 m above ground level) using concrete mix of 1:2:4 around the housing pipe welded mnimu 6 nos. anchoring plate as per drawing
Supply and fitting of well cap as per drawing. A MS Plate 5mm thick should be welded on outer surface of casing pipe (0.5 mtrs. above ground level) with permanent marking by welding method as "CGWB EW" FOR Exploratory Wells & "CGWB OW" for Observation Wells.
Supply and installation of protection box made of GI sheet of 3.15mm thickness along with Brass lock (7 lever hardened) and three keys for each lock as per drawing
Supply and installation of display board as per drawing
Preparation and submission of basic data report includes EW and OW along data sheets, analysis sheet, logging graphs, etc. for each site. The BDR also should include photograph/ videos of activities i.e. drilling, assembly lowering, discharge, wate sample collection, v notch discharge at various depth of drilling, pump lowering, pumping test, protection box with display board, etc. The soft copy should also be submitted.
Drilling and Construction of Observation Wells
Drilling of overburden by rock roller/ drag/ button bit to accommodate casing pipe including sample collection, preparation and submission of litholog
Supply and installation of ERW casing pipe 175 mm (7") Nominal Bore conforming to Table 3 of latest version of IS: 4270-2001 as given below
Drilling by DTH method using appropriate sizes of button bits so as to reach targetted depth with diameter of hole not less than 165 mm at 100 m depth and final diameter not less than 152 mm at hole bottom including measurement of discharge through V-notch at various stages (depth) of drilling, collection of water samples of each Aquifer formation/ fracture zone encountered, adopting standard procedure, formation sample collection at every 3 m intervals, preparation and submisison of litholog, discharge measurements etc., sample collection and preperation of litholog
Caliper Logging, submission of logging graph, report
Chemical analysis of water samples for 15 parameters Ph, EC, TH, TDS, Ca, Mg, Na, K, CO3, HCO3, SO4, NO3, Cl, F, & Fe, in NABL accredited labs and submission from NABL lab
Chemical analysis of water samples for Heavy metals Arsenic, Cadmium, Mercury, Lead, in NABL accredited labs and submission from NABL lab
Construction of cement concrete platform 0.70 x 0.70 x 0.60 m ( 0.30 m above ground level) using concrete mix of 1:2:4 around the housing pipe welded mnimu 6 nos. anchoring plate as per drawing
Supply and fitting of well cap as per drawing. A MS Plate 5mm thick should be welded on outer surface of casing pipe (0.5 mtrs. above ground level) with permanent marking by welding method as "CGWB EW" FOR Exploratory Wells & "CGWB OW" for Observation Wells.
Supply and installation of protection box made of GI sheet of 3.15mm thickness along with Brass lock (7 lever hardened) and three keys for each lock as per drawing
Description of Work / Item(s)
Amount
Drilling, Reaming, Assembly Lowering & Geophysical Logging
Drilling of pilot hole for Exploratory Well not larger than 216 mm (81/2") by rock roller/ drag bit including sample collection at every 3 m and change in formation, preparation and submission of litholog.
Electrical logging using 406 mm and 1626 mm (16" and 64") SP resistivity probe and Natural gamma logging, and preperation of composite log, submission of report including zone wise water quality alongwith logging graphs, raw data analysis
Enlargement of hole by Using 508 mm (20”) RR Bit for 250 mm (10”) assembly pipe reaming in Exploratory well (EW) to accommodate well assembly of recommended size and gravel envelop of minimum 100 mm thickness
Enlargement of hole by Using 381 mm ( 15”) RR Bit for 150 mm (6”) assembly pipe reaming in Exploratory well (EW) to accommodate well assembly of recommended size and gravel envelop of minimum 100 mm thickness
Supply and installation of 250 mm (10”) Nominal Bore, thickness 7.1mm ERW casing pipe conforming to Table 3 of latest version of IS: 4270-2001
Supply and installation of 150 mm (6”) Nominal Bore, thickness 5.4mm conforming to Table 3 of latest version of IS: 4270-2001
Supply and installation of 150 mm (6”) LCG V-wire, thickness 8mm, Slot opening 1mm LCG V- wire screen conforming to latest version of IS: 8110-2000"
Supply and shrouding of Particle size range 2.00 mm to 3.35 mm for 1.0 mm and 0.75 mm slot opening pea gravel confirming to latest version of IS: 4097-1967 from the bottom of recommended depth
Supply and filling up borehole/ annular space between casing pipe and bore hole wall with local clay, if required
Development by air compressor of adequate capacity for minimum 10 hours, over pumping and by other means till discharge water is free of sand including collection of two water samples from EW adopting standard procedure for 1 litre HDPE bottle.
Pumping test (includes pre pumping for 8 hours and recuperation for 24 hrs. , SDT, APT and collection of 04 nos. of water samples using standard procedure for basic parametres per EW in 1 litre HDPE bottle) and submission of report with data, graph sheet, analysis, etc.
Chemical analysis of water samples for 15 parameters Ph, EC, TH, TDS, Ca, g, Na, K, CO3, HCO3, SO4, NO3, Cl, F, & Fe, in NABL accredited lab and submission of report with NABL lab
Chemical analysis of water samples for Heavy metals Arsenic, Cadium, Mercury, Lead in NABL accredited labs and submission of report with NABL lab certificate
Construction of cement concrete platform 0.70 x 0.70 x 0.60 m ( 0.30 m above ground level) using concrete mix of 1:2:4 around the housing pipe welded mnimu 6 nos. anchoring plate as per drawing
Supply and fitting of well cap with allen key as per drawing. MS Plate size 5 mm embossed & welded with permanent marking by welding method as "CGWB EW" for Exploratory Wells & "CGWB OW" for Observation Wells should be carved with welding on outer surface of casing pipe 0.5mtrs.
Supply and installation of protection along with Brass lock (7 lever hardened) and three keys for each lock as per drawing
Supply and installation of display board as per drawing
Preparation and submission of basic data report per site (includes EW and OW) in triplicate along with logging graphs, data sheets, analysis sheet, logging graphs, chemical analysis report from NABL lab, site location map and approchability with land marks, photographs/ videos of activities of drilling, assembly lowering, gravel measurement and gravel, well development using compressor and water well discharge, pump lowering, puping test (SDT, APT, PYT), water sample collection, well discharge with discharge measurement / orifice with manometer head, well site with display board well cap, protection box activity for each EW site, etc. The soft copy should be submitted.
R K DRILLING SERVICES
Fugro Geotech (India) Pvt. Ltd.
R K DRILLING SERVICES
Fugro Geotech (India) Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .