| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance BARA BAZAR GWAL TOLI HAZARIBAG | HAZARIBAGH | JHARKHAND | 825301 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.9 L
EMD Value
₹50,000
Closing Date
29 May 2026, 5:00 pmClosed
Municipal Commissioner
Hazaribag Municipal Corporation
Construction of R.C.C Drain from Sardar Chowk to Bangali Colony and Laying of Paver Block from Jack and Jill School to Bengali Colony in Ward No. 15 Under Municipal Corporation, Hazaribag
2026_UDD_114357_3
UDD/HMC/HZB/06/2026-27
Open Tender
Civil Works
Percentage
120 days
Hazaribag Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹50,000
30 May 2026
22 May 2026
30 May 2026
22 May 2026
29 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15m.lead and disposal of unserviceable materials with all leads complete as per building specification and direction of E/I. | 1 | M3 | 541.67 | ₹541.13 |
| 2 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 1 | M3 | 955.89 | ₹954.93 |
| 3 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I.+ Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | - | M3 | 167.33 | - |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l. | - | M3 | 589.51 | - |
| 5 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | M2 | 330.34 | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | M3 | 4,961.73 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1 | M3 | 5,218 | ₹5,212.78 |
| 8 | Providing Tor steel reinforcement 8mm dia rods as per approved design and drawing excluding carriage of bars to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. | 1 | MT | 83,314.02 | ₹83,230.71 |
| 9 | Providing TMT steel reinforcement 10mm dia bars as per approved design and drawing excluding carriage of M.S bar to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I | - | MT | 82,096.54 | - |
| 10 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 1 | M3 | 55.28 | ₹55.22 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_154555.xls
BOQ • 0.29 MB
Tender_Document.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .