Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-Finance | ₹13.7 L | L1 | Accepted-Finance ACCEPT |
| 2 | L2₹13.7 L+₹275.11 (0.02%)Rejected-Finance | ₹13.7 L+₹275.11 (0.02%) | L2 | Rejected-Finance REJECT |
Tender Value
₹13.8 L
EMD Value
₹28,000
Closing Date
6 Jun 2026, 5:00 pmClosed
EE RED FATEHPUR
VIKAS BHAWAN FATEHPUR
Block bahua Ke Gram Pamrauli Me (Paswano Ki Taraf) Utsav Bhawan Ka Nirman.
2026_REDUP_1155682_3
165/RED/E-Tender/2026-27 Date 05-05-2026
Open Tender
Civil Works
Percentage
90 days
FATEHPUR
PREFIRED NIT
3 documents required · 3 mandatory
₹765
₹28,000
VIKAS BHAWAN FATEHPUR
18 Sept 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30cm. Measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50m. outside the periphery of area cleared as per DSR.No. 2.31 (Page No. 95) | 900 | Sqm | 12.53 | ₹11,277.45 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per DSR.No. 2.8.1 | 58.99 | Cum | 185.44 | ₹10,939.28 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources :8 graded stone aggregate 40 mm nominal size derived from natural sources) As per DSR no. 4.1.8 | 13.95 | Cum | 4,853.07 | ₹67,720.28 |
| 4 | Brick work with common burnt clay (non modular) bricks of class -150 infoundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) as per DSR No- 6.1.2 | 26.42 | Cum | 5,081.22 | ₹1,34,225.67 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Under Floor) as per DSR.No. 2.25 (a) | 101.61 | Cum | 499.05 | ₹50,709.57 |
| 6 | Brick work with common burnt clay bricks of M-150 Class in superstructure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:6 ( 1 cement : 6 coarse sand ) as per DSR no 6.4.2 | 27.61 | Cum | 6,487.34 | ₹1,79,103.34 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Above Plinth Lvl as DSR No-5.2.2 | 12.05 | Cum | 7,731.96 | ₹93,192.36 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). Above Plinth Lvl as SI No-5.3 | 9.73 | Cum | 8,196.85 | ₹79,734.18 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). Above Plinth Lvl as SI No-5.3 | 1.15 | Cum | 8,196.85 | ₹9,404.98 |
| 10 | Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-MechanicallyTreated bars of grade Fe-500D or more. As per DSR. No.- 5.22 B.1 | 16.2 | Qtl | 7,099.35 | ₹1,14,998.23 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_2165032.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .