Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹5.6 L (5.00%)Admitted-Finance NO 216 THONDAIMANVIDUTHI PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | 613301 | ₹1.2 Cr+₹5.6 L (5.00%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical NO 137 TRICHY MAIN ROAD PIDAGAM POST VILLUPURAM TK 605 401 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605401 | - | - | Rejected-Technical All Documents are not submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical All Documents are not submitted |
| 5 | Rejected-Technical 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | - | - | Rejected-Technical All Documents are not submitted |
| Sl No | Description | Qty | Unit | A RAJA L1 | CMS CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: Deepening , Construction of Bhathing Ghat, Inlet, lining wall to baby Pond , Retaining Wall (L-9m) to the Thoppa Oorani in 9A.Nathampannai Panchayat | |||||
| 1.01 | Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 4,020 | Sqm | 5.05 ₹20,301 Lowest | 5.3 ₹21,306 |
| 1.02 | Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete | 5,788.64 | Cum | 50 ₹2,89,432 Lowest | 52.5 ₹3,03,903.6 |
| 1.03 | Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation. | 5,788.64 | Cum | 12 ₹69,463.68 Lowest | 12.6 ₹72,936.86 |
| 1.04 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification. | 116.23 | Cum | 193.2 ₹22,455.64 Lowest | 202.86 ₹23,578.42 |
| 1.05 | Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications. | 19.73 | Cum | 1,381.28 ₹27,252.65 Lowest | 1,450.34 ₹28,615.21 |
| 1.06 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 30.69 | Cum | 4,444.36 ₹1,36,397.41 Lowest | 4,666.58 ₹1,43,217.34 |
| 1.07 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 27.15 | Cum | 5,778.22 ₹1,56,878.67 Lowest | 6,067.13 ₹1,64,722.58 |
| 1.08 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 119.79 | Cum | 4,768.07 ₹5,71,167.11 Lowest | 5,006.47 ₹5,99,725.04 |
| 1.09 | Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer. | 504.47 | Sqm | 418.5 ₹2,11,120.7 Lowest | 439.43 ₹2,21,679.25 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
29 Jul 2022, 3:00 pmClosed
Project Director,
DRDA, Pudukkottai
Deepening and Improvements to the Ooranies_13 nos. in AGAMT-II-2021-22 Village panchayats of Pudukkottai Block in Pudukkottai District in Package no.48
2022_RDTN_242357_1
PUDUKKOTTAI DISTRICT - AGAMT II - 2021-2022
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
26 Sept 2022
18 Jul 2022
29 Jul 2022
18 Jul 2022
29 Jul 2022
18 Jul 2022
Amount
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Laying and fixing charges RCC 900mm NP3 pipe
Provision for Sitting Bench arrangements on Bund
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond and Inlet to the Sithadartha Oorani at Perungapatty in Kavinadu West Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Laying and fixing charges RCC 900mm NP3 pipe
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond and Inlet to the Chokku Oorani in Kavinadu West Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Laying and fixing charges RCC 900mm NP3 pipe
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond to the Perumal Oorani in Kavinadu East Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond to the Perumal Kovil Oorani at Attankudi Kavinadu East Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond to the Vaadi Oorani at Pudurajapatty in Mullur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond to the Amma Oorani at Valiyampatty in Mullur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond to the Kothankuli Oorani in Perungalur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Laying and fixing charges RCC 900mm NP3 pipe
Provision for Sitting Bench arrangements on Bund
Deepening , Construction of Bhathing Ghat, lining wall to baby Pond to the Oorani (Kattupatty) in Perungalur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Laying and fixing charges RCC 900mm NP3 pipe
Provision for Sitting Bench arrangements on Bund
Deepening of Pillaiyar Oorani and Construction of Bathing ghat, Inlet, and Retaining wall @ Kandankarappatti in Vadavalam Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Retaining wall
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening of Chetti Oorani and Construction of Bathing ghat, Inlet, and Retaining wall @ Indranagar in Vadavalam Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Retaining wall
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening of Neppiyapatti Oorani and Construction of Bathing ghat @ Neppiyapatti in Vadavalam Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening of MinjiOorani and Construction of Bathing ghat, Inlet, and Retaining wall @ ChinnaiahChathiram in Vadavalam Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Retaining wall
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CMS CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
48_Tech.pdf
Tender Documents • 0.64 MB
BOQ_286515.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .