| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.0 LAccepted-AOC | ₹31.0 L | L1 | Accepted-AOC l1 |
| 2 | L2₹31.8 L+₹81,950.37 (2.64%)Rejected-Finance MU PO LONHIVAR TA BHOOM JI DHARASHIV | DHARASHIV | MAHARASHTRA | ₹31.8 L+₹81,950.37 (2.64%) | L2 | Rejected-Finance R |
| 3 | L3₹32.0 L+₹1.0 L (3.37%)Rejected-Finance AT POST HOUSE NO 26 1302 PRABHU KRUPA WARUDA ROAD KESHAV NAGAR SAMARTH NAGAR DHARASHIV 413501 | DHARASHIV | DHARASHIV | MAHARASHTRA | 413501 | ₹32.0 L+₹1.0 L (3.37%) | L3 | Rejected-Finance R |
| 4 | Not Admitted-Fee/PreQual/Technical 1551 SUBHASH NAGAR BARSHI TAL BARSHI DIST SOLAPUR | BARSHI | SOLAPUR | MAHARASHTRA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹31.0 L
EMD Value
₹30,984
Closing Date
14 Mar 2026, 6:30 pmClosed
EXECUTIVE ENGINEER WORKS ZILLA PARISHAD DHARASHIV
EXECUTIVE ENGINEER WORKS ZILLA PARISHAD DHARASHIV
Improvement to Odr to Domgaon No. 02 VR 59 Road Km 0/700 to 2/00 ( Actual Km 0/700 to 1/750 ) Tq. Paranda Dist Dharashiv
2026_OSMAN_1284396_5
24/2025-26
Open Tender
Civil Works - Roads
Percentage
100 days
Improvement to Odr to Domgaon No. 02 VR 59 Road Km
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
₹30,984
22 May 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
14 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing B.T. Surface (flexible Pavement) to a depth of 50 mm. manually including loading of dismantled material to transport vehicle at site excluding lead charges | 576 | Sq.M. | 28 | ₹16,128 |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as
directed all sorts of soils. | 96 | Cu.M. | 119 | ₹11,424 |
| 3 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders
/Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). | 438 | Cu.M. | 1,158.43 | ₹5,07,392.34 |
| 4 | Supplying soft murum at the road site, including conveying and stacking complete. | 109.5 | Cu.M. | 651.98 | ₹71,391.81 |
| 5 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 387.75 | Cu.M. | 654.98 | ₹2,53,968.5 |
| 6 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | 438 | Cu.M. | 85 | ₹37,230 |
| 7 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 497.25 | Cu.M. | 79 | ₹39,282.75 |
| 8 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial
watering complete. | 4,380 | Sq.M. | 25 | ₹1,09,500 |
| 9 | Compacting the hard murum side widths including laying in layers on each side with
vibratory roller including artificial watering etc. complete. | 2,585 | Sq.M. | 21 | ₹54,285 |
| 10 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 1.75 Kilogram/Square Metre, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) | 3,150 | Sq.M. | 246.18 | ₹7,75,467 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_2208824.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .