| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹5.3 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical 12 4 DELHI MATHURA ROAD NEAR SARAI METRO STATION FARIDABAD | FARIDABAD | - | - | Rejected-Technical Reject on ground PQR clasue 5b,5c,5e,5f and 5g |
| Sl No | Description | Qty | Unit | GE POWER INDIA LIMITED L1 |
|---|---|---|---|---|
| 1.00Supply Part | ||||
| 1.10 | Design, Engineering, Supply, of Pendent Re- heater coils from inlet leg to outlet leg (up to HRH outlet header connection) including all support arrangement & Header bend for Unit No.2 of 210 MW ABL Make Boiler at SGTPS Birsinghpur | 68 | Sets | 2,91,79,072 ₹3.4 Cr |
| 2.00Work Part | ||||
| 2.10 | Dismantling of existing Coils & Erection, Testing & Commissioning of new Pendent Re- heater coils from inlet leg to outlet leg (up to HRH outlet header connection) in Unit No. 2 of 210 MW ABL Make Boiler at SGTPS Birsinghpur | 1 | Job | 1,69,57,943 ₹2.0 Cr |
Tender Value
₹5.6 Cr
EMD Value
₹5.6 L
Closing Date
6 Jan 2024, 6:00 pmClosed
SE PnW o/o ED Gen Brs
SE PnW o/o ED Gen Brs
Design engg and supply of pendent Reheater coil from inlet leg to outlet leg including all support arrangements Header Bend and Work of replacement of existing coil and erection testing commissioning of complete set of new Pendent at SGTPS MPPGCL Brs
2023_MPPGC_316607_1
316607
Open Tender
Miscellaneous Goods
90 days
SE PnW o/o ED Gen Brs
As Per NIT
23 documents required · 23 mandatory
₹5,000
Yes
₹5.6 L
Yes
27 Jan 2026
9 Oct 2023
9 Jan 2024
9 Oct 2023
6 Jan 2024
16 Oct 2023
Supply Part
Design, Engineering, Supply, of Pendent Re- heater coils from inlet leg to outlet leg (up to HRH outlet header connection) including all support arrangement & Header bend for Unit No.2 of 210 MW ABL Make Boiler at SGTPS Birsinghpur
Work Part
Dismantling of existing Coils & Erection, Testing & Commissioning of new Pendent Re- heater coils from inlet leg to outlet leg (up to HRH outlet header connection) in Unit No. 2 of 210 MW ABL Make Boiler at SGTPS Birsinghpur
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid