Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.3 CrAdmitted-Finance 20 SC BOSE COLONY GALL NO 2 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹17.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹18.4 Cr+₹1.1 Cr (6.45%)Admitted-Finance PLOT NO 13 THIRD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | ₹18.4 Cr+₹1.1 Cr (6.45%) | L2 | Admitted-Finance |
| 3 | L3₹21.7 Cr+₹4.5 Cr (25.8%)Admitted-Finance | ₹21.7 Cr+₹4.5 Cr (25.8%) | L3 | Admitted-Finance |
| 4 | L4₹22.3 Cr+₹5.0 Cr (28.9%)Admitted-Finance 3RD FLOOR B K ENCLAVE MOTILAL NEHRU ROAD PAN BAZAR GUWAHATI KAMRUP METROPOLITAN KAMRUP METRO ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | ₹22.3 Cr+₹5.0 Cr (28.9%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical M 11 22 BADLI IND ESTATE DELHI 110042 | DELHI | NORTH DELHI | DELHI | 110042 | - | - | Rejected-Technical Three works secured by bidder but not got enlisted/registered in MES till date as per Para 8 (v) of NIT. |
| Sl No | Description | Qty | Unit | M K ENGINEERS CO. L1 | Satnam Global Infraprojects Ltd. L3 | Purbanchal Synergies Pvt. Ltd L4 | M/S RADIUS SYNERGIES INTERNATIONAL PVT LTD L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Design, installation supply, testing, commissioning, Integrate and maintain the Advance Metering Infrastructure (AMI) for 17592 Nos for HQ CWE Amritsar, HQ CWE Jalandhar and HQ CWE Ferozepur AoR, comprising of following:-
(a) Supply, installation, testing, commissioning of Smart Meters Single phase, 10-60 Amps, 2 wire, 230 Volts of different makes (not more than 33% of particular make to ensure interchangeability at a later date as per BIS 16444 with communication technology including GPRS/ RF/Hybrid (RF + GPRS)/ Any other advanced technology as per CEA/TRAI regulations in meter box with current range 10-60A Amp, 240 V, accuracy class 1.0 UC1 category and above along with in-built load control switch, containing provision for TOD & RTC, capable to define multiple tariff slabs complete all as specified and directed. Meter should support the following data:-
(i) 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand.
(ii) Meter should have connect/disconnect functionality operable for MDM/billing software and prepaid features would be operable for MDM/Billing end as per IS: 15959 Part-2.
(iii) Meter should support communication protocol through RF/5G/4G/NB IOT with the software all as required at site and directed (cost of 5G/4G/NB IOT sim with two year recharge facilities, mapping, vending portal charges etc deemed to included in rate quoted for meter). In case of RF Mesh Network Communication, if repeaters are technically required in between meters and DCU, the cost there of irrespective of their numbers are deemed to be included in the quoted rate for meters.
(iv) The meter should support open communication protocol DLMS with the software.
(b) Supply,Survey,Planning,Setup,Tuning of RF communication infrastructure including Network Management (NMS) & Head End System (HES) for the project area. AMI software and associated equipments like (vending station monitor including PC) in each GE/AGE (I) under HQ CWE Amritsar, HQ CWE Jalandhar and HQ CWE Ferozepur should be capable of handling at least 10000 Number of Meters of different makes as per BIS 16444 with 25% expansion without any additional infratructure and cost implication to MES.
(c) Supply and set-up of Meter Data Management (MDM) system.
(d) Integration of different devices of different makes/equipment/softwares covered in scope of this project with each other as per functional requirements, including water charges, furniture and license fee.
(e) Integration/interface of the AMI system with application systems like metering/billing/collection. Interface has to be provided in the proposed solution to upload and process meter data from these systems.
(f) Hosting the systems to Government community cloud in place of server for hosting and management of supplied software application with standby server.
(g) Planning, deployment & tuning of communication system including cellular network (if required) to meet the preformance requirements. | 17,592 | Each Job | 5,583 ₹9,82,16,136 | 7,200 ₹12,66,62,400 | 5,955 ₹10,47,60,360 | 4,432.08 ₹7,79,69,151.36 Lowest |
| 1.01(h) Business intelligence, Analytics and Reporting. (j) The quoted rates are inclusive of taking down old Single/Three phase Energy Meter from any location and deposit to MES storeyard in respective GE/AGE (I) including making good to the disturbed surface of wall and meter reading record shall be submit before and after replacement duly signed by the contractor representative and MES representative complete all as specified and directed by Engineer-in-Charge/GE. (k) Training and knowledge transfer. (l) All expenditure including periodic charges of telecom operator from installation till completion. Note:- 1.The defect liability period will be 2 years from the date of completion. 2. Audit of software for Smart meters will be done by CERT- India empaneled firm/CERT Auditor of Armed Forces. The cost of the audit will be borne by the contractor. 3. Meter should support communication protocol through RF/5G/4G/NB IOT with the software all as required at site and directed (cost of RF/5G/4G/NB IOT sim with two year recharge facility, mapping, vending portal charges etc deemed to included rate quoted for meter). In case of RF Mesh Network Communication, DCU and repeaters if technically required as per the actual location clustor and permissible range, the cost there of irrespective of their numbers are deemed to be included in the quoted rate of meter. Note : The cost of metal box will be measured and paid separately in respect item No 5. Details of Single phase Meter as under:- HQ CWE Jalandhar Cantt:- (i) GE (E) JRC-881. (ii) GE (W) JRC-1225. (iii) GE KPT-2041. (iv) AGE (I) SNS-889. HQ CWE Amritsar:- (i) GE ASR-2012. (ii) GE GSP-2384. (iii) GE NAMS-3894. HQ CWE Ferozepur:- (i) GE (E) FZR-3528. (ii) GE LDH-738. | |||||||
| 2.00 | All as per item No 1 above but Three phase, 10-60 Amps, 4wire, 415 Volts. 940 numbers of meters.
Note:- The cost of metal box will be measured and paid separately in respect item no 5.
Details of Three phase Meter as under:-
HQ CWE Jalandhar Cantt:-
(i) GE (E) JRC-10. (ii) GE (W) JRC-126. (iii) GE KPT-135. (iv) AGE (I) SNS-60.
HQ CWE Amritsar:-
(i) GE ASR-242. (ii) GE GSP-16. (iii) GE NAMS-271.
HQ CWE Ferozepur:-
(i) GE LDH-80.
NOTES FOR SER ITEM NO. 1 & 2
(a) The OEM will be performing site survey and deciding the communication technology to ensure data availaibility/connectivity of all consumers.
(b) The meter should be capable to run in both prepaid and post-paid mode & must support online and offline recharging system.
(c) The manufacturer or their service provider shall furnish 10 (Ten) years replacement guarantee for smart prepaid meters installed under this contract. The cost of the same are deemed to be included in the rates quoted for the item.
(d) In case of Cellular communication such as 4G, NBIOT, 5G etc, the meter should be demonstrated working with more than one telecom service provider available in all the areas/stations covered under this contract.
(e) All RF meters shall be based on "MESH Technology".
(f) Meter should be integrable to third party software. Meter vender should provide all the necessary protocols and passwords including LLS key, HLS key, authentication passwords, encryption password.
(g) Meter shall be supplied with repeater battery backup of RTC.
(h) The rates quoted for this items are deemed to be inclusive of all other additional works including materials which is not mentioned here but need to be executed for proper and smooth functioning of smart meter system.
(j) The smart meter should also have provn to receive connect/disconnect command locally at optical port with use of CMRI or any other equivalent arrangment. | 940 | Each Job | 7,983 ₹75,04,020 | 11,000 ₹1,03,40,000 | 7,847 ₹73,76,180 | 7,193.28 ₹67,61,683.2 Lowest |
| 2.01(k) Contractor shall attend the complaint of meters logged by user with 24 hrs, otherwise Rs. 200.00 per day per meter penalty will be imposed till rectification. Following issues/problems related to the smart metering system will be considered as dysfunction of meters:- (i) No communication of smart meter with the gateway or server as per desired frequency. (ii) Error in calculation of live bill & balance w.r.t. the tariff structure. (iii) Failure of online recharge against and non updation of online recharge against respective user. (iv) Failure of reconnect/disconnect command given to the smart meter. (v) Disconnection of meter during peak hours & any other issue if causes inconvenience to the end user, or admin user & leads to any revenues losses. (vi) Disruption in electric supply of user end in case of any error/fault in the smart meter. (l) DCUs/Gateways and the arrangment of sim cards and internet (data pack) to enable reliable medium for two-way communication between smart meter & HES. The data acquisition (push/pull) frequency shall be configurable. It shall push events such as tamper, power off/on etc to HES immediately on occurence/receipt from meters. It shall have provision for the cellular, wifi and ethernet communication for the backhaul to HES. It shall be capable to handle data of minimum 200 Nos of any type of smart meter (1-Φ/3-Φ). it shall be able to communicate with the nearest meters at a distance of at least 500m, depending on topographical features. Communication of the nearest meters with other meters shall be established through appropriate mesh formation. RF Mesh shall support self -forming and self-healing features. The equipment shall be weather proof and dust proof (minimum rating: IP 54 for indoor and IP65 for outdoor installations). it shall have rechargeable lithium ion battery with backup for 1 (one) hour for normal meter reading, to push tamper event, carry out on demand reading, etc. NOTE for DCU: (i) DCU would be compatible to atleast three different makes of smart meter. Make:- Anchor/Panasonic/L&T/HPL secure. (ii) The rate of sim as well as data pack for 24 months from date of completion of work for connectivity is deemed to be included in quoted rate. NOTES FOR SER ITEM NO. 1 & 2 (PC/PRINTER) (i) Supply of vending station desktop/PC with configuration of i5, 8 GB RAM, 1 TB Hard Dish, 19 " monitor, Windows 10/11, MS office, wireless keyboard and mouse, CD ROM Read/Write, USB ports etc alongwith 1KVA capacity UPS all as specified. Note. Installation and provision of broad band connection alongwith telecom charges 01 No at Each GE/AGE(I) with high speed internet for 10 years deemed to be included in quoted rate. (ii) Provision of wireless Report Printer with 12 pages per minute capacity, 600 x 600 dpi with HP, Jet, 1200dpi effective output quality (600 x 600 x 2 dpi with Ret, with duty cycle 3,000 single sided pages per month for report printing 01 No at Each GE/AGE(I) complete as required. Make : HP Laser Jet 1020 or equivalent in canon, Epson and Samsung printer all as specified. | |||||||
| 3.00 | Supply and configuration installing, testing & commissioning of Cloud-Hosted multi-user web-based software including cloud hosting charge during 2- year defect liability period at HQ JRC AOR, HQ ASR AOR and HQ FZR AOR with following modules:
(i) Head End System (HES): The HES to acquire data from different end points and monitor them automatically and remotely. The HES should be suitable to support the collection and storage of 15-minute interval data from end points.
(ii) Meter Data Management Module: The meter data management module would be responsible for collecting the data from the contractor and make the data available to the billing system. The meter data management system would capture and provide the following data:-
(a) Real time energy monitoring with 30 mins instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency.
(b) Monthly and quarterly billing survey data for Cumulative energy and max demand.
(iii) Post-paid /Prepaid Billing Module: The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin & end users.The billing module would include functionalation for tarrif setup,bill format setup bill occupation billing vacation.It would allow postpaid and prepaid functioning as repaid. There should be provision for entry of change in the tariff structure by the MES staff as decided time to time.
(iv) Occupation and Vacation Module: The system would support occupation / vacation based on the unit categories like billing reports, including license fee, furniture charges, water charges in addition to electric charges.
(v) Web site: There would be a dedicated website for the GE/AGE & BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on mobile App (Android & iOS based) for admin use.
Details of Cloud -hosting for Single phase & Three phase Meter as under:-
HQ CWE Jalandhar Cantt:-
(i) GE (E) JRC-891. (ii) GE (W) JRC-1351. (iii) GE KPT-2176. (iv) AGE (I) SNS-949.
HQ CWE Amritsar:-
(i) GE ASR-2254. (ii) GE GSP-2400. (iii) GE NAMS-4165.
HQ CWE Ferozepur:-
(i) GE (E) FZR-3528. (ii) GE LDH-818. | 18,532 | Each Meter Per Month for 2 years | 571 ₹1,05,81,772 | 280 ₹51,88,960 Lowest | 944 ₹1,74,94,208 | 339.84 ₹62,97,914.88 |
| 3.01(vi) Customer Module: The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data and recharge facility. There shall be consumer App (Android & iOS based) also to log in and view their own energy/billing data and recharge facility. (vii) Communication Module: The system would provide communication of energy data and bills via print, e-mail and SMS methods. (viii) Meter Master Data: The system would support meter master data repository. The system would support meter replacement process. (ix) Excel Export: The system would support export of metering and billing data in excel & pdf format. (x) Energy Accounting Module: The system would include features of energy accounting, the system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. (xi) Customer Care Module: The software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xii) Meter installation Module: The software would inclode an app base meter instslation module where the meter instalation or changes can be captured on the app itself and the reading may be demostrated to the user required on the app it self. (xiii) Activites communication : The software support communication of the various acctivies such as occupation ,vacation , change, personal detail change etc the user as well as the department on email. (xiv) Pre-payment/Recharging Facility: The system should periodically monitor the energy consumption of prepaid consumers and decrease the available credit based on the consumption. The system should allow online/digital recharging through consumer App (Android & iOS based) and Web portal.The configuration and necessary arrangement for payment gateway and e-MRO facility shall be deemed to be included in the quoted rate. The system should send connect/disconnect command on the basis of available credit. Low credit alarm : The system will give an alarm over the consumer App and SMS to the registered mobile number in case the credit in the meter goes down below a predefined limit. Emergency credit : The meter will work even when the credit falls down to zero to prevent disconnection. This limit shall be configurable. The system should support happy hours in order to prevent disconnection in non-working hours and on holidays. The Happy hours should be configurable. (xv) The software shall be audited by CERT-costauditor of armed forces. Cost of audit shall be borne by the contractor. (xvi) The software would be hosted on MeitY (Ministry of Electronics and Information Technology) approved Cloud/GCC. All charges for taking cloud service shall deemed to be included in the quoted rate. | |||||||
| 3.02(xvii) Cyber security of software: The software provided for the smart meters shall be secure from cyber threats and shall be provided regular security patches and updates including firewall and latest feature updates. Make: As per the OEM of the meter developed in India. The software shoud be demonstrated to work in both RF and GPRS based system for future comptability. (xviii) Cyber security software:The AMISP/contractor will be responsible for making the entire the service provider immune to Cyber Attacks, while taking care of following guidelines:- (a) All the hardware, OS and application software shall be hardened. (b) Application, scanning and hardware scanning tools shall be provided to identify vulnerability & security threats. (c) Date shall be encrypted at system/device/technology level. (d) While procuring cyber security items testing must be done and the system must be secure by design. (e) Residual information risk shall be calculated by contractor and same shall be submitted for perusal cyber audit teams. (f) Penetration & vulnerability assessment test from certified auditors during Field Acceptance Test (FAT). Site Acceptance test (SAT) & operations and maintenance period. (g) Audit of software for smart meter will be done by cert India empanelled firm cert auditor of armed forces. The cost of audit will be borne by the contractor. (h) Cert Audit of smart metering system at the time of commissioning shall be carried out. Subsequent audit of the system shall be carried out after every three years cost of such audits and rectifications thereof shall be borne by contractor. (xix) Cloud Security: (a) The following basic security features should be ensured by any cloud service provider(CSP):- (i) Strong encryption capabilities for data in transit or at rest. (ii) Identity and Access Management (IAM). This controls users access to cloud services create and manage users and groups, and grant or deny access. | |||||||
| 3.03(iii) Managed Threat Detection : This service provides a more accurate and easy way to continuously monitor and protect cloud accounts and workloads. (iv) Managed DDoS Protection: This protection service that safeguards web applications running on cloud. (v) Web Application Firewall: It helps protects web applications from common web exploits that can affect application availability , compromise security or consume excessive resources. (vi) Key Management Service (KMS) : This service makes it easy to create and control the encryption keys used to encrypt data. (vii) Certificate Manager: This manange and deploys Secure Sockets Layer/ Transport Layer Security (SSL/TLS ) certificates. (viii) Cloud Hardware Security Module (HSM) : This meets regulatory compliance requirement for data security by using dedicated HSM appliances within the cloud. (b) CSPs also offers access to additional third- party security tools (e.g., IDS/intrusion Detection system (IDS), Intrusion prevention system (IPS), system information and event management (SIEM) to complement and enhance the consumers operation in the cloud. The third-party security tools complement existing cloud services to enable consumers to deploy comprehensive security architecture. These security tools on cloud are equivalent and identical to the existing controls in an on-premises environment. (c) The contractor needs to review and validate the security configurations, review the notifications and patches released by CSP and validate the same is being taken into consideration during operations, confirm that the audit trails (e.g., who is accessing the services, changes to the configurations etc.) are captured for supporting any downstream audits of the projects by the finance or audit organization such as Standard Testing & Quality certificate (STQC), MEity Govt of India. | |||||||
| 3.04NOTES:-(a) The software would be hosted on GCC Server for hosting and management of supplied software application with standby server. Firm whose GCC server is used shall be approved by GE before execution. (b) The software would contain two year defect liability including GPRS charges & hosting charges. GCC provider shall be from approved list of vendors from "MEITY". During defect liability period and eight year period thereafter, if firm is removed from approved list of MEITY, system shall be shifted to any other approved vendor without any cost to Deptt. (c) The payment gateway would be integrated with Bank Account details as provided by GE. (d) The software would enable the features of refund calculation in case of house vacation. (e) Three different makes of meters (RF /Cellular) shall be integrated with same software. Same shall be demonstrated to GE before execution. (f) The software would support other charges such as water charges, license fee, furniture charges and other allied charges. (g) The software would allow supporting both prepaid and post-paid billing plans. Separate groups can be created for the same. (h) One bank account detail will be provided by MES. The cost of integration of payment gateway with software and bank account deemed be included in the quoted rates. No extra charges will be paid by MES on account of integration of payment gateway with bank account and software. (j) The software would be scalable and expandable for meters and system of different make complying with IS-16444. (k) The software should strictly adhere to IS:15959 standard & must be compatible with all makes of smart meters and the software should be capable of handling at-least 10000 number of meters of different makes in each GE/AGE (I) under HQ CWE JRC, HQ CWE ASR & HQ CWE FZR as per BIS-16444 with 25% expansion without any additional infrastructure and cost implication to MES. (l) The software must be audited by CERT India empaneled firm/CERT auditor of Armed Forces and documentary proof of same must be produced at the time of commissioning. (m) An amount of 3.5% of the quoted rate of CA shall be kept reserve as a guarantee of meters upto 10 yrs and for which Contractor shall deposit FDR in the name of GE NAMS at the time of completion of work Phase-I, or else, the same shall be deducted in the final bill. | |||||||
| 4.00 | Supply and fixing of Transparent polycarbonate Meter Box of suitable size with IP-54 for above mentioned here in above item S No. 1, 1-Phase, 2- wire Smart Energy Meter. The Polycarbonate Meter box shall comply with IS 14772:2000 and IS 11000:1984. It shall be totally shock proof, safe weather proof, rust proof , dust proof , water proof, halogen free, silica free and having internally embedded gasket technology, transparent hinged lid and sealing provision including bakelite connector, complete all as specified and directed by Engineer-in-Charge. Make:- As per OEM
Details of Single phase Meter Box as under:-
HQ CWE Jalandhar Cantt :-
(i) GE (E) JRC-881. (ii) GE (W) JRC-1225. (iii) GE KPT-2041. (iv) AGE (I) SNS-889.
HQ CWE Amritsar:-
(i) GE ASR-2012. (ii) GE GSP-2384. (iii) GE NAMS-3894.
HQ CWE Ferozepur:-
(i) GE (E) FZR-3528. (ii) GE LDH-738. | 17,592 | Each | 213 ₹37,47,096 Lowest | 650 ₹1,14,34,800 | 265 ₹46,61,880 | 354 ₹62,27,568 |
Tender Value
₹24.7 Cr
EMD Value
₹15 L
Closing Date
29 May 2026, 6:00 pmClosed
Chief Engineer Jalandhar Zone Jalandhar Cantt
HQ Chief Engineer Jalandhar Zone Jalandhar Cantt
Provision of Smart Meter at Jalandhar Cantt
2026_MES_752138_1
81110/E8
Open Tender
Civil Works
Item Rate
365 days
Jalandhar Cantt
As per NIT Documents
9 documents required · 9 mandatory
₹3,000
GE (East) Jalandhar Cantt
₹15 L
Yes
21 Aug 2026
10 Feb 2026
5 Jun 2026
30 Mar 2026
29 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, installation supply, testing, commissioning, Integrate and maintain the Advance Metering Infrastructure (AMI) for 17592 Nos for HQ CWE Amritsar, HQ CWE Jalandhar,and HQ CWE Ferozepur AoR, comprising of following:-
(a) Supply, installation, testing, commissioning of Smart Meters Single phase, 10-60 Amps, 2 wire, 230 Volts of different makes (not more than 33% of particular make to ensure interchangeability at a later date as per BIS 16444 with communication technology including GPRS/RF/Hybrid (RF + GPRS)/ Any other advanced technology as per CEA/TRAI regulations.
(b) Supply,Survey,Planning,Setup,Tuning of RF communication infrastructure including Network Management (NMS) & Head End System (HES) for the project area. AMI software and associated equipments like (vending station monitor including PC) in each GE/AGE (I) under HQ CWE Amritsar, HQ CWE Jalandhar and HQ CWE Ferozepur should be capable of handing at least 17592 Number of Meters of different makes as per BIS 16444 with 25% expansion without any additional infratructure and cost implication to MES.
(c) Supply and set-up of Meter Data Management (MDM) system.
(d) Integration of different devices of different makes/equipment/softwares covered in scope of this project with each other as per functional requirements, including water charges, furniture and license fee.
(e) Integration/interface of the AMI system with application systems like metering/billing/collection. Interface has to be provided in the proposed solution to upload and process meter data from these systems.
(f) Hosting the systems to Government community cloud in place of server for hosting and management of supplied software application with standby server.
(g) Planning, deployment & tuning of communication system including cellular network (if required) to meet the preformance requirements.
(h) Business intelligence, Analytics and Reporting.
(j) The quoted rates are inclusive of Taking down old Single / Three phase Energy Meter from any location and deposit to MES storeyard in respective GE/AGE (I) including making good to the disturbed surface of wall and meter reading record shall be submit before and after replacement duly signed by the contractor representative and MES representative complete all as specified and directed by Engineer-in-Charge/GE.
(k) Training and knowledge transfer.
(l) All expenditure including periodic charges of telecom operator from installation till completion.
Note:- 1.The defect liability period will be 2 years from the date of completion.
2. Audit of software for Smart meters will be done by CERT - India empaneled firm / CERT Auditor of Armed Forces. The cost of the audit will be borne by the contractor. | 17,592 | Each Job | - | - |
| 2 | All as per item No 1 above but Three phase, 10-60 Amps, 4wire, 415 Volts. 940 numbers of meters.
Note:- The cost of metal box will be measured and paid separately in respect item no 5.
Details of Three phase Meter as under:-
HQ CWE Jalandhar Cantt:-
(i) GE (E) JRC-10. (ii) GE (W) JRC-126. (iii) GE KPT-135. (iv) AGE (I) SNS-60.
HQ CWE Amritsar:-
(i) GE ASR-242. (ii) GE GSP-16. (iii) GE NAMS-271.
HQ CWE Ferozepur:-
(i) GE LDH-80.
NOTES FOR SER ITEM NO. 1 & 2 (DCU)
(l) DCUs/Gateways and the arrangment of sim cards and internet (data pack) to enable reliable medium for two-way communication between smart meter & HES. The data acquisition (push/pull) frequency shall be configurable. It shall push events such as tamper, power off/on etc to HES immediately on occurence/receipt from meters. It shall have provision for the cellular, wifi and ethernet communication for the backhaul to HES. It shall be capable to handle to handle data of minimum 200 Nos of any type of smart meter (1-Φ/3-Φ). it shall be able to communicate with the nearest meters at a distance of at least 500m, depending on topographical features. Communication of the nearest meters with other meters shall be established through appropriate mesh formation. RF Mesh shall support self -forming and self-healing features. The equipment shall be weather proof and dust proof (minimum rating: IP 54 for indoor and IP65 for outdoor installations). it shall have rechargeable lithium ion battery with backup for 2(Two) hour for normal meter reading, to push tamper event, carry out on demand reading, etc.
Note for DCU:-
(i) DCU would be compatible to atleast three different makes of smart meter. Make:- Anchor/Panasonic/L&T/HPL secure.
(ii) The rate of sim as well as data pack for 24 months from date of completion of work for connectivity is deemed to be included in quoted rate.
NOTES FOR SER ITEM NO. 1 & 2 (PC/PRINTER)
(I)Supply of vending station desktop/PC with configuration of i5, 8 GB RAM, 1 TB Hard Dish, 19 " monitor, Windows 10/11, MS office, wireless keyboard and mouse, CD ROM Read/Write, USB ports etc alongwith 1KVA capacity UPS all as specified.
Note. Installation and provision of broad band connection alongwith telecom charges 01 No at AT Each GE/AGE(I) with high speed internet for 10 years deemed to be included in quoted rate.
(II) Provision of wireless Report Printer with 12 pages per minute capacity, 600 x 600 dpi with HP, Jet, 1200dpi effective output quality (600 x 600 x 2 dpi with Ret, with duty cycle 3,000 single sided pages per month for report printing 01 No at AT Each GE/AGE(I) complete as required. Make : HP Laser Jet 1020 or equivalent in canon, Epson and Samsung printer all as specified | 940 | Each Job | - | - |
| 3 | Supply and configuration installing, testing & commissioning of Cloud-Hosted multi-user web-based software including cloud hosting charge during 2- year defect liability period at Ferozepur as well as Amritsar Station with following modules:
(i) Head End System (HES): The HES to acquire data from different end points and monitor them automatically and remotely. The HES should be suitable to support the collection and storage of 15-minute interval data from end points.
(ii) Meter Data Management Module: The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data:- (a) Real time energy monitoring with15 mins instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency. (b) Monthly and quarterly billing survey data for Cumulative energy and max demand.
(iii) Post-paid /Prepaid Billing Module: The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin & end users.The billing module would include functionalation for tarrif setup,bill format setup bill occupation billing vacation.It would allow postpaid and prepaid functioning as repaid. There should be provision for entry of change in the tariff structure by the MES staff as decided time to time.
(iv) Occupation and Vacation Module: The system would support occupation / vacation based on the unit categories like billing reports, including license fee, furniture charges, water charges in addition to electric charges.
(v) Web site: There would be a dedicated website for the GE/AGE & BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on mobile App (Android & iOS based) for admin use.
(vi) Customer Module: The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data and recharge facility. There shall be consumer App (Android & iOS based) also to log in and view their own energy/billing data and recharge facility.
(vii) Communication Module: The system would provide communication of energy data and bills via print, e-mail and SMS methods. | 18,532 | Each Meter Per Month for 2 years | - | - |
| 3.01 | (viii) Meter Master Data: The system would support meter master data repository. The system would support meter replacement process.
(ix) Excel Export: The system would support export of metering and billing data in excel & pdf format.
(x) Energy Accounting Module: The system would include features of energy accounting, the system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available.
(xi) Customer Care Module: The software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution.
(xii) Meter installation Module: The software would inclode an app base meter instslation module where the meter instalation or changes can be captured on the app itself and the reading may be demostrated to the user required on the app it self.
(xiii) Activites communication : The software support communication of the various acctivies such as occupation ,vacation , change, personal detail change etc the user as well as the department on email.
(xiv) Pre-payment/Recharging Facility: The system should periodically monitor the energy consumption of prepaid consumers and decrease the available credit based on the consumption. The system should allow online/digital recharging through consumer App (Android & iOS based) and Web portal.The configuration and necessary arrangement for payment gateway and e-MRO facility shall be deemed to be included in the quoted rate. The system should send connect/disconnect command on the basis of available credit. Low credit alarm: The system will give an alarm over the consumer App and SMS to the registered mobile number in case the credit in the meter goes down below a predefined limit. Emergency credit: The meter will work even when the credit falls down to zero to prevent disconnection. This limit shall be configurable. The system should support happy hours in order to prevent disconnection in non-working hours and on holidays. The Happy hours should be configurable. | - | - | - | - |
| 3.02 | (xv) Automatic Over Shut Down- The system should shut down electricity automatically for certain period immediately on crossing auth load limit.
(xvi) The software shall be audited by CERT-cost auditor of armed forces Cost of audit shall be borne by the contractor.
(xvii) The software would be hosted on MeitY (Ministry of Electronics and Information Technology) approved Cloud/GCC. All charges for taking cloud service shall deemed to be included in the quoted rate.
(xviii) Cyber security of software: The software provided for the smart meters shall be secure from cyber threats and shall be provided regular security patches and updates including firewall and latest feature updates. Make: As per the OEM of the meter developed in India .The software shoud be demonstrated to work in both RF and GPRS based system for future comptability.
(xix) Cyber security software:The AMISP/contractor will be responsible for making the entire the service provider immune to Cyber Attacks, while taking care of following guidelines :(a) All the hardware, OS and application software shall be hardened.(b) Application, scanning and hardware scanning tools shall be provided to identify vulnerability & security threats.(c) Date shall be encrypted at ystem/device/technology level.(d) While procuring cyber security items testing must be done and the system must be secure by design.(e) Residual information risk shall be calculated by contractor and same shall be submitted for perusal cyber audit teams.(f) Penetration & vulnerability assessment test from certified auditors during Field Acceptance Test (FAT). Site Acceptance test (SAT) & operations and maintenance period. (g) Audit of software for smart meter will be done by cert India empanelled firm cert auditor of armed forces. The cost of audit will be borne by the contractor.(h) Cert Audit of smart metering system at the time of commissioning shall be carried out. Subsequent audit of the system shall be carried out after every three years cost of such audits and rectifications thereof shall be borne by contractor. | - | - | - | - |
| 3.03 | (xix) Cloud Security:
(a) The following basic security features should be ensured by any cloud service provider(CSP):-
(i) Strong encryption capabilities for data in transit or at rest.
(ii) Indentity and Access Management (IAM). This controls users access to cloud services create and manage users and groups, and grant or deny access.
(iii) Managed Threat Detection : This service provides a more accurate and easy way to continuously monitor and protect cloud accounts and workloads.
(iv) Managed DDoS Protection: This protection service that safeguards web applications running on cloud.
(v) Web Application Firewall: It helps protects web applications from common web exploits that can affect application availability , compromise security or consume excessive resources.
(vi) Key Management Service (KMS) : This service makes it easy to create and control the encryption keys used to encrypt data.
(vii) Certificate Manager: This manange and deploys Secure Sockets Layer/ Transport Layer Security (SSL/TLS ) certificates.
(viii) Cloud Hardware Security Module (HSM) : This meets regulatory compliance requirement for data security by using dedicated HSM appliances within the cloud.
(b) CSPs also offers access to additional third- party security tools (e.g., IDS/intrusion Detection system (IDS), Intrusion prevention system (IPS), system information and event management (SIEM) to complement and enhance the consumers operation in the cloud. The third-party security tools complement existing cloud services to enable consumers to deploy acomprehensive security architecture. These security tools on cloud are equivalent and identical to the existing controls in an on-premises environment. | - | - | - | - |
| 3.04 | (c) The contractor needs to review and validate the security configurations, review the notifications and patches released by CSP and validate the same is being taken into consideration during operations, confirm that the audit trails (e.g., who is accessing the services, changes to the configurations etc.) are captured for supporting any downstream audits of the projects by the finance or audit organization such as Standard Testing & Quality certificate (STQC), MEity Govt of India.
NOTES:-(a) The software would be hosted on GCC Server for hosting and management of supplied software application with standby server. Firm whose GCC server is used shall be approved by GE before execution.
(b) The software would contain two year defect liability including GPRS charges & hosting charges. GCC provider shall be from approved list of vendors from "MEITY". During defect liability period and eight year period thereafter, if firm is removed from approved list of MEITY, system shall be shifted to any other approved vendor without any cost to Deptt.
(c) The payment gateway would be integrated with Bank Account details as provided by GE.
(d) The software would enable the features of refund calculation in case of house vacation.
(e) Three different makes of meters (RF /Cellular) shall be integrated with same software. Same shall be demonstrated to GE before execution.
(f) The software would support other charges such as water charges, license fee, furniture charges and other allied charges.
(g) The software would allow supporting both prepaid and post-paid billing plans. Separate groups can be created for the same.
(h) One bank account detail will be provided by MES. The cost of integration of payment gateway with software and bank account deemed be included in the quoted rates. No extra charges will be paid by MES on account of integration of payment gateway with bank account and software.
(j) The software would be scalable and expandable for meters and system of different make complying with IS-16444.
(k) The software should strictly adhere to IS:15959 standard & must be compatible with all makes of smart meters and the software should be capable of handling at-least 10000 number of meters of different makes as per BIS-16444 with 25% expansion without any additional infrastructure and cost implication to MES.
(l) The software must be audited by CERT India empaneled firm/CERT auditor of Armed Forces and documentary proof of same must be produced at the time of commissioning.
(m) An amount of 3.5% of the quoted rate of CA shall be kept reserve as a guarantee of meters upto 10 yrs and for which Contractor shall deposit FDR in the name of GE (East) Jalandhar at the time of completion of work Phase-I, or else, the same shall be deducted in the final bill. | - | - | - | - |
| 4 | Supply and fixing of Transparent polycarbonate Meter Box of suitable size with IP-54 for above mentioned here in above item S No. 2, 1-Phase, 2- wire Smart Energy Meter. The Polycarbonate Meter box shall comply with IS 14772:2000 and IS 11000:1984. It shall be totally shock proof, safe weather proof, rust proof , dust proof , water proof, halogen free, silica free and having internally embedded gasket technology, transparent hinged lid and sealing provision including bakelite connector, complete all as specified and directed by Engineer-in-Charge. Make:- As per OEM
Details of Single phase Meter Box as under:-
HQ CWE Jalandhar Cantt :-
(i) GE (E) JRC-881. (ii) GE (W) JRC-1225. (iii) GE KPT-2041. (iv) AGE (I) SNS-889.
HQ CWE Amritsar:-
(i) GE ASR-2012. (ii) GE GSP-2384. (iii) GE NAMS-3894.
HQ CWE Ferozepur:-
(i) GE (E) FZR-3528. (ii) GE LDH-738. | 17,592 | Each | - | - |
| 5 | Supply and fixing of Transparent polycarbonate Meter Box of suitable size with IP-54 for above mentioned here in above item S No. 2, 3-Phase, 4- wire Smart Energy Meter. The Polycarbonate Meter box shall comply with IS 14772:2000 and IS 11000:1984. It shall be totally shock proof, safe weather proof, rust proof , dust proof , water proof, halogen free, silica free and having internally embedded gasket technology, transparent hinged lid and sealing provision including Bakelite connector, complete all as specified and directed by Engineer-in-Charge. Make:- Anchor/Panasonic, L&T, HPL, Secure.
Details of Three phase Meter Box as under:-
HQ CWE Jalandhar Cantt :-
(i) GE (E) JRC-10. (ii) GE (W) JRC-126. (iii) GE KPT-135. (iv) AGE (I) SNS-60.
HQ CWE Amritsar:-
(i) GE ASR-242. (ii) GE GSP-16. (iii) GE NAMS-271.
HQ CWE Ferozepur:-
(i) GE (E) FZR-3528. (i) GE LDH-738 RM. | 940 | Each | - | - |
| 6 | Supply and fixing sub main wiring with 4 runs of 6.0 sqmm single core, multi-stranded PVC insulated, FRLS unsheathed cable 1100 Volts grade with copper conductor drawn through and including concealed non metalic PVC conduit, medium grade, ISI marked, suitable size with conduit fittings and accessories concealed in wall/ceiling/floor including 1 run of 6.0 Sqmm multistranded PVC insulated FRLS, copper conductor cable as earth continuity conductor and connecting to common earth duly incl taking down old unsv one from site complete all as directed (For Offrs Md Accns)
NOTE: Four runs of 6.0 sqmm copper cable and one run of 6.0 sqmm copper cable alongwith non metallic PVC conduit/conduit accessories will be measured as one unit length.
Details of Three phase Sumain wiring as under:-
HQ CWE Jalandhar Cantt :-
(i) GE (E) JRC-40 RM. (ii) GE (W) JRC-126 RM. (iii) GE KPT-270 RM. (iv) AGE (I) SNS-900 RM.
HQ CWE Amritsar:-
(i) GE ASR-2930 RM. (ii) GE GSP-50 RM. (iii) GE NAMS-271 RM.
HQ CWE Ferozepur:-
(i) GE LDH-259 RM. | 4,846 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TenderDocuments_81110.pdf
Tender Documents • 0.95 MB
BOQ_842419.xls
BOQ • 0.35 MB
CorrigendumNo11dt25May2026.pdf
PDF • 0.11 MB
CorrigendumNo10dated20May2026.pdf
PDF • 0.01 MB
CorrigendumNo09dated15May2026.pdf
PDF • 0.01 MB
CorrigendumNo07dated04May2026.pdf
PDF • 0.21 MB
CorrigendumNo06dated30Apr2026.pdf
PDF • 0.01 MB
CorrigendumNo4dated21Apr2026.pdf
PDF • 0.01 MB
CorrigendumNo3dated06Apr2026.pdf
PDF • 0.01 MB
CorrigendumNo2dated23Mar2026.pdf
PDF • 0.09 MB
CorrigendumNo1dated09Mar2026.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .