Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹83,000
Closing Date
17 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Director/ Project Director
DRDA, SALEM
SCPAR -2020-21 Package No.12/2020-21 P.N.Palayam Block in Salem District No of Works -01
2021_RDTN_192382_55
Roc.No.08/2021/A6
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per tender schedule
3 documents required · 3 mandatory
₹0
₹83,000
DRDA, SALEM
22 Feb 2021
10 Feb 2021
17 Feb 2021
10 Feb 2021
17 Feb 2021
10 Feb 2021
12 Feb 2021
90 days
Amount
1.) Pattyvalavu Arangathai Kovil Road Km 0/0-0/700
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-0/700
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B Km 0/0-0/700
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Km 0/0-0/700
Providing Gravel soling to 100 mm thick including cost and conveyance of gravel from approved sources to work site and stacking on road side to departmental metric gauge for pre measurements as directed including labour for spreading and compacting ete.., Km 0/0- 0/700
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401 Grading III Km 0/0-0/700
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/700
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. Km 0/0- 0/700
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. Km 0/0- 0/700
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete Km 0/0- 0/700
Hectametre Stone
Sign board
1.A) 5x3.00m Span RCC Culvert @ Km 0/680
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. (Culvert)
Cement Concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Cement Concrete 1:3:6 (one cement three sand and six hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes Below Sill Level
Deck Slab
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinfored cement concrete works as per the design given including cost of steel and binding wire in all floor etc..,
Plain cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete foe bed blocks
Reinforced Cement Concrete 1:1.5:3 mix using 20 mm HBG metal for foundation including wateriung wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete (Deck slab)
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Construction of un-reinforced,dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2. M30 ( grade) coarse and fine aggregate confirming to ISS .383 maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer including all other incidential charges etc., complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen Pad
Provision for Weep holes 4 " Pvc pipe
1.B) Protection wall Km 0/0-1/0
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B
Cement Concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Cement Concrete 1:3:6 (one cement three sand and six hard broken stone) using 40 mm ISS HBG stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with standard specification and as directed by the departmental Officers etc ., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes Below Sill Level
Provision for Weep holes 4 " Pvc pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A R P AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .