Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 LAccepted-AOC 11 82 GROUND FLOOR BLOCK 11 KALYANPURI EAST DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹46.0 L+₹2.8 L (6.38%)Rejected-Finance | L2 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Bharat Sales Corporation L1 | JASPREET SINGH COOLING CORP. L2 |
|---|---|---|---|---|---|
| 1.00Repair of special power supply system of following specification & capacity (Sl item No 1 to 25) through OEM of System (i.e Protech). Before commencement of repair work contractor shall submit details of rep of OEM for approval of GE. (i) 30 KW, 27V - 11 No's (ii) 12 KVA, 115V , single phase, 400 Hz - 2 No's (iii) 7.5 KVA, 36 VAC, three phase , 400 Hz - 5 No's (iv) 5 KVA, 115 VAC, three phase, 400 Hz - 1 No (v) 28V, DCPS, 150 Amp - 1 No (vi) 10 KVA, 115 AC, single phase, 400 Hz - 3 No's (vii) 2 KVA , 36 VAC, three phase, 400 Hz - 1 No (viii) 4 KVA, 115VAC, 1 Phase , 400 Hz, - 7 No's | |||||
| 2.00 | Supply and fixing in repair of DC Control PCB –
DC voltage of the AC-DC converter is regulated by sensing DC output voltage through a chain of program resistors and current control loop in the Converter control PCB2 (EE-27M3). In case mains input varies or current drawn by Inverter varies, the command voltage of the control loop varies such that output voltage of AC – DC converter is kept constant. The firing PCB1 (EE-28), provides the required drive & firing pulses to the six SCRs, so as to achieve voltage control. The power supply is generated from transformer of part No T17 of OEM complete all as directed by Engineer in Charge. | 15 | Each | 10,000 ₹1,50,000 Lowest | 13,000 ₹1,95,000 |
| 3.00 | Supply and fixing in repair of DC Firing Control PCB
This circuit generates six gate drive pulses to control firing of SCRs of AC Voltage Regulator. This circuit is part of Charger Control PCB1 (EE-28). The DC power supply required for firing and control circuit is derived from mains sensing and power supply transformer (T2A, T2B, and T2C). These transformers sense mains zero voltage instant. The firing instant of SCRs is advanced or retarded by DC voltage command signal given to the firing circuit. This circuit acts as an interface between full controlled Rectifier and control circuits complete all as directed by Engineer in Charge. | 17 | Each | 10,000 ₹1,70,000 Lowest | 18,000 ₹3,06,000 |
| 4.00 | Supply and fixing in repair of Primary Control Power Semiconductor Semi-Pak
These Semi Packs are used to keep the output voltage within 2% regulation band against Load Variation and Line supply variation. There are three Semi Packs in each DC Power supply. They are connected to the primary winding of output transformer complete all as directed by Engineer in Charge. | 28 | Each | 3,350 ₹93,800 Lowest | 3,500 ₹98,000 |
| 5.00 | Supply and fixing in repair of Sycn Transformer of part No 17 of OEM complete all as directed by Engineer in Charge. | 19 | Each | 1,700 ₹32,300 | 1,500 ₹28,500 Lowest |
| 6.00 | Supply and fixing in repair of Inverter Control PCB
PWM INVERTER CONTROL CARD (PCB –9A, 9B, 9C) (EE- 09 BM2)
The main function of PWM Inverter Control card (EE-09A, EE-09B, EE-09C) is to generate PWM pulses for IGBT Inverter Bridge of each phase, control the output voltage within acceptable limits, protect SFC from output over load, output over voltage, output under voltage, output short circuit and over temperature of power IGBTs.
The output voltage of the Inverter is sensed from each output phase by Inverter feedback transformers (T12A, T12B, T12C) and fed to output voltage control loop. In case DC input voltage to the Inverter or load on the Inverter varies, this voltage loop controls modulation such that Inverter output voltage remains constant. Non-linear load or introduction of dead band between the two PWM waveforms may introduce some distortion at the output voltage of the Inverter. This distortion is corrected by a waveform correction circuit in the control card. (EE-09B)
The output current is sensed by output current feedback transformers CT2A, CT2B, CT2C. | 20 | Each | 19,000 ₹3,80,000 | 15,000 ₹3,00,000 Lowest |
| 7.00 | Supply and fixing in repair of Control Transformer of part No 22 of OEM
The electronic power supply required for DC Firing Control PCB is generated from this transformer T22. The synchronizing signal required for firing instance for Semi pack is also generated by these transformer complete all as directed by Engineer in Charge. | 28 | Each | 2,700 ₹75,600 | 1,500 ₹42,000 Lowest |
| 8.00 | Supply and fixing in repair of Driver PCB
IGBT DRIVER AND TRIP CIRCUIT (PCB – 8A1, 8A2, 8B1, 8B2, 8C1, 8C2) (EE-08M1)
The PWM waveforms generated by control circuit are fed to two driver PCBs (EE-08M1) for driving IGBT bridge of each phase (Driver PCB 8A1, 8A2, 8B1, 8B2, 8C1, 8C2). Each driver circuit drives half bridge and ensures that IGBT are in saturation when turned ON and fully turned OFF by reverse biasing when control drive is off. If any transistor tends to go out of saturation due to excessive overload or inadequate base drive, it cuts off base drive from the IGBT and trips the Inverter through Inverter trip circuits EE-08M1 complete all as directed by Engineer in Charge. | 25 | Each | 5,700 ₹1,42,500 | 4,000 ₹1,00,000 Lowest |
| 9.00 | Supply and fixing in repair of Power IGBT
This is the main power component used for conversion of DC voltage, generated by AC to DC converter, to 400 Hz AC supply of desired voltage. This is most important component in this SFC. There are Six IGBT modules in each SFC for 3 phase SFC and two IGBT modules for single phase SFC. Each IGBT module consists of two IGBTs connected in series and connected across the controlled DC voltage. The IGBTs are switched ON and OFF through IGBT Driver PCBs. IGBTs are selected as per power rating of the SFC complete all as directed by Engineer in Charge. | 25 | Each | 5,050 ₹1,26,250 | 4,000 ₹1,00,000 Lowest |
| 10.00 | Supply and fixing in repair of DC to DC PCB
The DC to DC power supply PCB is provided to generate +/- 12 V DC power supply for Inverter Control PCB. It also generates 8 V AC supplies for IGBT Driver PCB. The DC to DC PCB gets its input supply of 400 V DC from AC to DC converter output. It starts working only when the AC to DC converter reaches 400 V DC complete all as directed by Engineer in Charge. | 22 | Each | 4,800 ₹1,05,600 | 4,000 ₹88,000 Lowest |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
16 Feb 2026, 6:00 pmClosed
GE(AF)EM Chakeri Kanpur
GE(AF)EM Chakeri Kanpur
REPAIR AND MAINTENANCE OF SPECIAL POWER SYSTEMS AND REPAIR/ MAINT OF BPI INSTALLATION AND CONNECTED SYSTEM OF ETH AT AFS KANPUR
2026_MES_749967_1
8803/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Area under GE(AF)EM Chakeri Kanpur
As per tender documents
9 documents required · 9 mandatory
₹500
GE(AF)EM Chakeri
₹1 L
Yes
4 May 2026
24 Jan 2026
21 Feb 2026
25 Jan 2026
16 Feb 2026
9 Feb 2026
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.22 MB
8803E8_CreditSchdule_1.pdf
Additional Documents • 0.21 MB
8803E8_Tender_1.pdf
Tender Documents • 0.75 MB
Workdetails.pdf
Additional Documents • 0.09 MB
Tender_Acceptance_Letter.pdf
Additional Documents • 0.08 MB
BOQ_839931.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .