Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC | ₹5.2 Cr Quoted ₹5.3 Cr | L1 | Accepted-AOC Accept due to lower rate in BOQ |
| 2 | L2₹5.4 Cr+₹6.9 L (1.30%)Rejected-Finance | ₹5.4 Cr+₹6.9 L (1.30%) | L2 | Rejected-Finance Reject Due to Higher Rate |
| 3 | Rejected-Technical FLAT NO 5 IIND FLOOR IIIRD B 2 NEHRU NAGAR GHAZIABAD UP 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | - | - | Rejected-Technical Rejected Due to SBD Evaluation |
| 4 | Rejected-Technical ANWALKHEDA MR | - | - | Rejected-Technical Rejected Due to SBD Evaluation |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected Due to SBD Evaluation |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
24 Mar 2020, 12:00 pmClosed
Superintending Engineer
BSR Circle, PWD, Gautambudhnagar
Widening and Strengthening work of Jhajhar Rabupura Mehndipur Bhole Ka Mandir Mehndipur Khadar (Chandigarh) ODR Ch. 12.000 to 14.220 for Inter state Connectivity in Gautambudhnagar.
2020_CEMRT_444201_1
2262/96M(IV)-BSR CIRCLE/2019-20 DATE 14-02-2020
Open Tender
Civil Works - Roads
Item Rate
270 days
Gautambudhnagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
Executive Engineer, PD, PWD, Gautambudhnagar
₹10.6 L
Yes
Bulandshahr
9 Jul 2020
6 Mar 2020
24 Mar 2020
6 Mar 2020
24 Mar 2020
6 Mar 2020
7 Mar 2020
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirments of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m including all cost of labour, T&P, Machinery material etc as per direction of E/I and MoRT&H Clause 301, including all type of taxes, cess etc but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Including all cost of labour, T&P, Machinery material etc as per direction of E/I and MoRT&H Clause 304, including all type of taxes, cess etc but excluding GST.
Construction of Embakment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 and MoRT&H Clause 305 . Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Construction granular sub-base (GSB) grade 1 by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibrator rollar to achieve desired density complete. as per MORTH 401, including cost of all material, labour, T &P including all taxes, royalty, labour cess but excluding GST
Providing, laying, spreading and compacting graded stone aggregate to Stablized (3.5% Emulsion & 1% OPC cement) wet mix macadam specifications including premixing the material with at OMC in machenical mix plant carriage of mix material by tipper to site laying in uniform layers of each 100mm thick with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH 403 . Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Providing and applying tack coat with Bitumen V.G.-10 using presure distributor at the rate of 0.25 kg per sqm on the prepared granular/Painted surfaces cleaned with Mechnical broom as per Technical Specification Clause 503. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Providing & laying bituminous concrete Grading-II with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregate of specified grading premixed with bitumenious (VG-30) binder @ 5.4% of mix and filler, transporting the hot mix to work site. Laying With a hydrostatic paver finisher with senser control to the required grade,level and alignment,rolling with smooth wheeled, vibratory and tandem rollar to achieve the desired compaction. As per MORTH Specification clause 509. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Cement concrete with 2cm gauge approved stone Grit, coarse sand & cement in the proportion of 4:2:1 Including supply of all materials, labour, T &P including all taxes, royalty, labour cess complete and as per direction of Engineer in charge.
M-150 Brick work including necessary cutting and moulding of brick as required in proportion of 1:3 ( 1cement and 3 Coarse sand) including supply of all material, labour, T&P etc required for completion of the work including cost of all material, labour, T &P including all taxes, royalty, labour cess complete and as per direction of Engineer in charge.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Providing Laying and Anchoring with U hook (12''x3''x12'') @ one per sqm. Of Geogreen Blanket (Coir Mat GECB 2.5.22.600) for stablilization of slopes on high embankments, praparation of Seed bed, fuminshing and placing of seed (0.100 Kg./Sqm), fertilizer (0.18 cum per 100 sqm) Including watering for 03 months all as per MORTH specification clause 307,308. Including all cost of labour, T&P, Machinery material etc as per direction of E/I, including all type of taxes, cess etc but excluding GST.
Jeet Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .