The Block Development Officer
Munchirai Panchayat Union Office
Providing Cement Concrete at vattapazhanji Edithudan Road in Nadaikavu Village Panchayat in munchirai union
2026_RDTN_660724_1
A10/360/2026
Open Tender
Civil Works
Nadaikkavu
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹23,000
Yes
18 Feb 2026
18 Feb 2026
23 Feb 2026
18 Feb 2026
23 Feb 2026
18 Feb 2026
Providing Cement Concrete at vattapazhanji Edithudan Road in Nadaikavu Village Panchayat in munchirai union.
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools laying spreading, new metal, hand packing to camber, gravel blinding, watering with all leads of good water, rolling and compacting by power roller and finishing to the total thickness with lines grades and cross section as specified in the departmental specification including all charges for all T&P employed and cost of free and other running charges and all other incidental charges etc. complete
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Supplying and erecting for sides and soffits including supports and strutting for plane surfaces in all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffered welded with mild angles of size 25x25x3mm for boarding laid over silver oak joists of size 10cmx65cm dia spaced at 75cm centre to centre etc, complete complying with standard specification and as directed for the following items, R.C.C. floor slab, bench slab all RCC works.
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tendernotice.pdf
Tender Documents • 1.08 MB
Technical.pdf
Additional Documents • 0.67 MB
BOQ_792763.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid