Loading…
Loading…
Tender Value
₹1.5 L
Closing Date
30 Jul 2026, 6:00 pm4d left
EXEN REW Shopian
Mini Secretariat Arhama Shopian
C/o culverts on road from GH qadir mir to parvaiz ahmad lone at kaprin P/H kaprin Block Kaprin
2026_RDPR_316830_10
E-Nit No 053 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Shopian
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Rural Development and Panchayati Raj
Exempted
20 Jul 2026
20 Jul 2026
31 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:(All kinds of soil ) | - | Cum | - | - |
| 2 | P/L of dry Stone soling dully hand packed hand rammed incl stone chippings, all carriages complete | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm N. size) | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excl. the cost of centring and shuttering. all work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl. carriage all complete | - | Cum | - | - |
| 5 | Centering and shuttering incl. strutting propping etc including removal of formwork, all carriages complete (Foundations, footings, bases of columns etc. for mass concrete) | 1 | sqm | - | - |
| 6 | Centering and shuttering incl. strutting propping etc including removal of formwork, all carriages complete (Foundations, footings, bases of columns etc. for mass concrete) | - | sqm | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20 mm nominal size) incl carriage/head load | 1 | Cum | - | - |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | - | qtl | - | - |
| 9 | Add for sign board and Photographs incl. carriage of tiles,Head load of Meterial | - | No | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_1035465.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].