Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹82,566.13Accepted-Finance | 1 | Accepted-Finance ok | |
| 2 | 2₹92,356.12+₹9,789.98 (11.9%)Accepted-Finance | 2 | Accepted-Finance ok | |
| 3 | 3₹96,720.33+₹14,154.19 (17.1%)Accepted-Finance | 3 | Accepted-Finance ok | |
| 4 | 4₹1.1 L+₹29,487.91 (35.7%)Accepted-Finance HAMIRPUR TEHSIL MARHEEN DISTRICT KATHUA | HAMIRPUR | UTTAR PRADESH | 210301 | 4 | Accepted-Finance ok |
Tender Value
₹1.2 L
EMD Value
₹2,340
Closing Date
7 Sept 2026, 6:00 pmClosed
Divisional Forest Officer Ramnagar
Near Narsingh Ji Temple at Ramnagar
Fencing and Plantation in Co. No. 2/N and 9a/N Barmeen Block of North Range under CAMPA Addl. CA
2026_FD_321030_2
45 of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Barmeen Block of North Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Divisional Forest Officer Ramnagar
₹2,340
10 Sept 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings upto girth of 30 cms measured at a height of 1m above ground level and removal of rubbish uptoa distance of 50 m outside the periphery of area cleared (In Co. No. 2/N = 139.41 Cum and in Co. No. 9a/N = 83.64 Cum) | - | Sqm | - | - |
| 2 | Excavation work in excavation by manual means for foundation, drains, pipes, cables etc (not exceeding 1.5 m in width) and for shafts wells cesspits and the like not exceeding 10 Sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 m from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil (In Co. No. 2/N = 5.73 Cum and in Co. No. 9a/N = 2.87 Cum) | 1 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All works upto plinth level 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40 mm nominal size) Crushed (In Co. No. 2/N = 0.88 Cum and in Co. No. 9a/N = 0.44 Cum) | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All works upto plinth level 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) Crushed (In Co. No. 2/N = 1.99 Cum and in Co. No. 9a/N = 1.00 Cum) | - | Cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns etc for mass concrete (In Co. No. 2/N = 27.88 sqm and in Co. No. 9a/N = 13.94 Sqm) | - | Sqm | - | - |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m (In Co. No. 2/N = 1.99 Cum and in Co. No. 9a/N = 0.99 Cum) | - | Cum | - | - |
| 7 | Finishing walls with water proofing cement paint of required shade on new work (two or more coats applied @ 3.84 kg/10 Sqm) (In Co. No. 2/N = 26.61 Sqm and in Co. No. 9a/N = 13.31 Sqm) | - | Sqm | - | - |
| 8 | Supply of precast cemnet Conc. Poles of size 75 mm x 750 mm x 1800 mm (including carriage) (In Co. No. 2/N = 60 Nos and in Co. No. 9a/N = 30 Nos) | - | Each | - | - |
| 9 | Erecting C.conc. Poles in position (In Co. No. 2/N = 60 Nos and in Co. No. 9a/N = 30 Nos) | - | Each | - | - |
| 10 | Fencing with RCC post placed at required distance embedded in cemnet concrete blocks last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 7 Horizontal lines weighing 9.38 kg per 100 meters (minimum) between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bars nibs fixed while casting the post (cost of RCC posts, struts, earth work and concrete to be paid for seprately) payment to be made per meter cost of total length of barbed wire used with G.I barbed wire (In Co. No. 2/N = 1280.49 mtr and in Co. No. 9a/N = 640.24 mtr) | - | MTR | 1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_1080049.xls
BOQ • 0.30 MB
enit45.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .