Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.6 L+₹54,390.94 (7.76%)Admitted-Fee/PreQual/Technical/Finance CHOUTHAI KULHI SINDRI ROAD JHARIA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹8.4 L+₹1.4 L (20.1%)Admitted-Fee/PreQual/Technical/Finance A 32 RAMA LIFE CITY OPP JAIN INTERNATIONAL SCHOOL MUNGALI ROAD BILASPUR C G 495001 | BILASPUR | BILASPUR | CHHATTISGARH | 495001 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹14.5 L+₹7.5 L (106.8%)Admitted-Fee/PreQual/Technical/Finance KUNJ BHAVAN JARHI BHATGAON COLLIERY BHATGAON SURGUJA CHHATTISGARH 497235 | SURAJPUR | CHHATTISGARH | 497235 | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹23.5 L+₹16.5 L (234.7%)Admitted-Fee/PreQual/Technical/Finance A 49 10 VINDHIYA COLONY PINOURA NOWROZABAD DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.5 L
EMD Value
₹31,900
Closing Date
24 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER CIVIL, BHATGAON
OFFICE OF THE STAFF OFFICER CIVIL, BHATGAON
Desilting of the pond at Kotya village for the EC condition of Shiwani UG mine of Bhatgaon area (2nd Call).
2026_SECL_368742_1
GM/BHAT/CVL/e-Tender/26-27/55 DATE 12/11/2026
Open Tender
Civil Works - Others
Percentage
90 days
SECL, Bhatgaon Area.
Please refer Tender documents.
3 documents required · 3 mandatory
₹31,900
26 Nov 2026
13 Nov 2026
26 Nov 2026
13 Nov 2026
24 Nov 2026
14 Nov 2026
13 Nov 2026 - 17 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | By Mechanical Transport including loading,unloading and stacking Earth Lead - 5 km | 680.4 | cum | 220.3 | ₹1,49,892.12 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 4,410 | cum | 187.5 | ₹8,26,875 |
| 3 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | 1,890 | cum | 405.3 | ₹7,66,017 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 1,575 | cum | 122.95 | ₹1,93,646.25 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.5 | cum | 6,466.6 | ₹1,58,431.7 |
| 6 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.37 | cum | 5,019.65 | ₹47,034.12 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 59.4 | sqm | 277.35 | ₹16,474.59 |
| 8 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.02 MB
finance_381739.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.30 MB
Tendernotice_3.pdf
PDF • 1.79 MB
BOQ_381739.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .