Tender Value
₹2.0 L
EMD Value
₹21,000
Closing Date
22 Oct 2026, 12:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE CD1 PWD ORAI
EE CD1 PWD ORAI
In Year 2026-27 Construction of 1000 mm HP Culvert on Urgaon Sihari Padaiya to karanpura Road.
2026_CEJNS_1197585_4
1712/10A date 05.10.2026
Open Tender
Civil Works - Roads
Fixed-rate
60 days
ORAI
In Year 2026-27 Construction of 1000 mm HP Culvert on Urgaon Sihari Padaiya to karanpura Road.
3 documents required · 3 mandatory
₹950
₹21,000
Yes
EE CD1 PWD ORAI
16 Oct 2026
16 Oct 2026
22 Oct 2026
16 Oct 2026
22 Oct 2026
16 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures / Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. / Rate as per item No.11.1 of Chapter 11 / Rate as applicable for the type of soil/rock are to be taken | 16.48 | Cum | 403 | ₹6,641.44 |
| 2 | Bedding for Pipe / (ii) Type B (First Class) Bedding / Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) / Rate as per Item No.11.2 of Chapter 11 | 2.81 | Cum | 2,976 | ₹8,362.56 |
| 3 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / (B) 1000 mm dia | 7.5 | Metre | 4,198 | ₹31,485 |
| 4 | Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 / Rate as per item No.11.4 of Chapter 11 | 2.81 | Cum | 6,110 | ₹17,169.1 |
| 5 | Brick Masonry Work in cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 / (A) Brick Masonry in 1:4 cement mortar / Rate as per item No.11.5 (ii) Chapter 11 | 12.18 | Cum | 6,480 | ₹78,926.4 |
| 6 | Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification / Rate as per item No.12.3 of Chapter 12 | 32.05 | sqm | 254 | ₹8,140.7 |
| 7 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 59.4 | Cum | 106 | ₹6,296.4 |
| 8 | Construction of Subgrade and Earthen Shoulders - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 7.2 | Cum | 95.5 | ₹687.6 |
| 9 | Cement Treated Subbase / Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for subbase. | 3.95 | Cum | 3,448 | ₹13,619.6 |
| 10 | Cement Treated Base / Providing, laying, spreading on a prepared sub base, cement@4% by weight to the spread material manully mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. / Quantity of cement assumed as 4 percent of Quantity by weight for base course. | 5.25 | Cum | 3,851 | ₹20,217.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
T1.pdf
Tender Documents • 0.93 MB
BOQ_2262483.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .