Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.9 Cr+₹31.4 L (12.0%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2.9 Cr
EMD Value
₹16.6 L
Closing Date
30 Oct 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
se pwd saharanpur
se pwd saharanpur
Construction of TYPEIV 6 NOS RESIDENCE FOR EXECUTIVE ASSISTANT ENGINEERS IN Dist MUZAFFARNAGAR
2026_CESHP_1200462_2
5175/24MS-S/2026 Date 05-09-2026
Open Tender
Civil Works
Fixed-rate
muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹16.6 L
2 Nov 2026
24 Oct 2026
30 Oct 2026
24 Oct 2026
30 Oct 2026
24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil .As per DSR No 2.6.1 . But Excluding GST. | 1,137.09 | Cum. | 122 | ₹1,38,724.98 |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. .As per DSR No 16.1 . But Excluding GST. | 793 | Sqm. | 151 | ₹1,19,743 |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 . But Excluding GST. | 112.15 | Cum. | 2,380 | ₹2,66,917 |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil .As per DSR No 2.26.1 . But Excluding GST. | 35.2 | Cum. | 87 | ₹3,062.4 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete. .As per DSR No 2.25A . But Excluding GST. | 1,133.98 | Cum. | 484 | ₹5,48,846.32 |
| 6 | Sand filling in plinth including supply of necessary quantity of coarse sand to the site of work including watering, ramming, dressing etc. rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. Under floor Fine sand. .As per DSR No 2.27 . But Excluding GST. | 63.23 | Cum. | 1,468 | ₹92,821.64 |
| 7 | Providing and laying Cement concrete 1:4:8 (1cement :4 C. sand :8 graded stone ballast 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation. .As per DSR No 4.1.8 . But Excluding GST. | 136.27 | Cum. | 4,711 | ₹6,41,967.97 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum .As per DSR No 5.33.1.1 . But Excluding GST. | 147.57 | Cum. | 6,574 | ₹9,70,125.18 |
| 9 | Concrete of M25 grade with minimum cement content of 330 kg /cum .As per DSR No 5.33.2.1 . But Excluding GST. | 359.14 | Cum. | 6,820 | ₹24,49,334.8 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .As per DSR No 5.1.2 . But Excluding GST. | 29.08 | Cum. | 6,256 | ₹1,81,924.48 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_2271087.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .