Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC | ₹2.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹2.6 LRejected-AOC 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹2.6 L | 2 | Rejected-AOC L2 |
| 3 | 3₹2.7 LRejected-AOC KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | ₹2.7 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | ROY ENTERPRISE L2 | NEW ELECTRICAL CONCERN L1 | KEKA ARMATURE REPAIRING SHOP L3 |
|---|---|---|---|---|---|---|
| 1.00Items Description | ||||||
| 2.00Repairing of Andrew-Yule make FLP ACB Star-Delta Starter (550V, 200kW) of Dhemomain Incline Colliery under Sodepur Area. | ||||||
| 2.01 | Dismantling of starter | 1 | Nos. | 450 ₹450 | 400 ₹400 | 500 ₹500 |
| 2.02 | Cost of main terminal | 12 | Nos. | 185 ₹2,220 | 180 ₹2,160 | 190 ₹2,280 |
| 2.03 | Cost of isolator | 1 | Nos. | 3,250 ₹3,250 | 3,000 ₹3,000 | 3,500 ₹3,500 |
| 2.04 | Cost of contactor unit (ML-12) | 3 | Nos. | 50,980 ₹1.5 L | 50,500 ₹1.5 L | 52,500 ₹1.6 L |
| 2.05 | Cost of CBCT(200-100/5) | 1 | Nos. | 1,980 ₹1,980 | 1,800 ₹1,800 | 2,050 ₹2,050 |
| 2.06 | Cost of CT (300:5) | 4 | Nos. | 825 ₹3,300 | 800 ₹3,200 | 850 ₹3,400 |
| 2.07 | Cost of heavy duty socket | 1 | Nos. | 350 ₹350 | 400 ₹400 | 400 ₹400 |
| 2.08 | Cost of isolator busbar | 3 | Nos. | 600 ₹1,800 | 700 ₹2,100 | 650 ₹1,950 |
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
26 Mar 2026, 11:00 amClosed
Area Engineer(EnM)
Area Engineer(EnM),Sodepur Area
Repairing of Andrew-Yule make FLP ACB Star-Delta Starter (550V, 200kW) of Dhemomain Incline Colliery under Sodepur Area.
2026_ECL_356862_1
ECL/SDPA/AE(EnM)/e/25-26/442 dt.16.03.2026
Open Tender
Miscellaneous Works
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,900
29 May 2026
17 Mar 2026
27 Mar 2026
17 Mar 2026
26 Mar 2026
17 Mar 2026
17 Mar 2026 - 20 Mar 2026
Items Description
Repairing of Andrew-Yule make FLP ACB Star-Delta Starter (550V, 200kW) of Dhemomain Incline Colliery under Sodepur Area.
Dismantling of starter
Cost of main terminal
Cost of isolator
Cost of contactor unit (ML-12)
Cost of CBCT(200-100/5)
Cost of CT (300:5)
Cost of heavy duty socket
Cost of isolator busbar
Cost of Overload relay assembly
Cost of carth leakage relay
Cost of PT (550V)
Cost of nut, bolts, washer
Complete auxiliary wiring
Cost of Ammeter and voltmeter
Cost of time relay set
Cost of 70mm copper flexible cable
Cost of 70mm sockets
Cost of GE power control fuse
Labour charges
Overhead & profit
Transportation charge
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_369719.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid