Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | ₹1.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.2 LRejected-Finance | ₹2.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.4 LRejected-Finance | ₹2.4 L | L3 | Rejected-Finance L3 |
| 4 | L4₹2.4 LRejected-Finance DINAULI TUNDLA FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | ₹2.4 L | L4 | Rejected-Finance L4 |
| 5 | L5₹2.5 LRejected-Finance | ₹2.5 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAMA YADAV L1 | M/S TANVI CONTRACTOR L6 | MOTI LAL CONSTRUCTION L2 | M/S M. S INFRACON L7 | UDAY RAM L5 | M/s DHARMVIR SINGH L4 | Jagannath prasad L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site. | 2,219 | M2 | 22.57 ₹50,082.83 | 28 ₹62,132 | 24.5 ₹54,365.50 | 15 ₹33,285 | 27.3 ₹60,578.70 | 5 ₹11,095 | 25.9 ₹57,472.10 |
| 2.00 | Cleaning thick bushes and thorny jungle without uprooting. | 8,875 | M2 | 2.83 ₹25,116.25 | 4.25 ₹37,718.75 | 3.08 ₹27,335 | 6 ₹53,250 | 3.43 ₹30,441.25 | 5 ₹44,375 | 3.25 ₹28,843.75 |
| 3.00 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 4,820 | M3 | 24.5 ₹1.2 L | 35.05 ₹1.7 L | 29.4 ₹1.4 L | 43.5 ₹2.1 L | 32.71 ₹1.6 L | 38 ₹1.8 L | 31.08 ₹1.5 L |
Tender Value
₹3.8 L
EMD Value
₹8,000
Closing Date
25 May 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal Clearance Work of Mahavan Drain Between Km 0.000 to Km. 5.600
2026_UPIDC_1148556_10
01EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
10 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹8,000
2 Jun 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site. | 2,219 | M2 | - | - |
| 2 | Cleaning thick bushes and thorny jungle without uprooting. | 8,875 | M2 | - | - |
| 3 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 4,820 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2150027.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid