Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.5 LAdmitted-Finance MIRZAPUR UTTAR PRADESH UP | -4.67% | ₹23.5 L | L1 | Admitted-Finance |
| 2 | L2₹24.1 L+₹58,486.73 (2.49%)Admitted-Finance | -2.30% | ₹24.1 L+₹58,486.73 (2.49%) | L2 | Admitted-Finance |
| 3 | L3₹24.4 L+₹90,568.06 (3.85%)Admitted-Finance UTTAR PRADESH UTTAR PRADESH | -1.00% | ₹24.4 L+₹90,568.06 (3.85%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical AS PER DOCS |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical AS PER DOCS |
Tender Value
₹24.7 L
EMD Value
₹49,356
Closing Date
12 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-01 Ward-44 Chakiya me Manoj Kumar Advocate se P D Dixit tak, aur Karbala Masjid se Rajendra Kumar Khare tak bitumin sadak, patri aur nali sudhar karya.
2026_NNAMC_1155465_2
12.06.2026 work no 22
Open Tender
Civil Works
Percentage
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
AS PER DOCS
₹49,356
29 Jul 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 38.2 | cum | 87.3 | ₹3,334.86 |
| 2 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 22.4 | cum | 160 | ₹3,584 |
| 3 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 3.2 | Cum | 3,500 | ₹11,200 |
| 4 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 29.74 | cum | 5,300 | ₹1,57,622 |
| 5 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 230 | sqm | 197 | ₹45,310 |
| 6 | Cement concrete with cement, sand & 20mm gauge stone grit with the proportion of (1:2:4) including all complete the work. | 1.84 | Cum | 7,700 | ₹14,168 |
| 7 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 107.93 | cum | 1,654.8 | ₹1,78,602.56 |
| 8 | Cement Concrete work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work | 71 | Cum | 8,200 | ₹5,82,200 |
| 9 | Providing&Applying of tack coat at the rate of 0.25kg/sqm includig material laboured all complition of work | 4,310 | cum | 15.3 | ₹65,943 |
| 10 | Providing & Laying D.G.B.M.-50mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumen VG-30 grade bluk @3.40% of weight of mix and including all completion of work as per MORT 7 Hspecification-504 | 38.88 | cum | 11,335.1 | ₹4,40,708.69 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.17 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_2164775.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .