| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC VILLAGE LAXMAN NAGAR DISTRICT SHRAVASTI | SHRAVASTI | UTTAR PRADESH | 271201 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹17.4 L+₹2.5 L (16.8%)Rejected-Finance | L2 | Rejected-Finance HIGH RATE BIDDER |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
8 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE SNK 4 BAHRAICH
OFFICE OF THE EE SNK 4 BAHRAICH
Construction of Head Regulator cum fall at Km. 2.900 and V.R.B. at Km. 7.900 of Bahadurpur Dy. in District-Shrawasti.
2021_UPIDC_550605_2
03/EE/SNK-4/2020-21
Open Tender
Civil Works
Item Rate
90 days
BHINGA SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,354
₹36,000
17 Apr 2021
3 Feb 2021
8 Feb 2021
3 Feb 2021
8 Feb 2021
3 Feb 2021
90 days
Amount
E/W in digging foundation in all type of soil including all lead, lift and back filling and disposal of surplus earth for proper completion of work.
Laying plain cement concrete in 1:3:6 in foundation with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc. With manual compaction required for proper completion of work.
1st Class brick work in 1:4 C.M. with hamirpur coarse sand of F.M not less than 2.0 including all taxes, cost of all material, labour and T&P. required for proper completion of work.
Centering & shuttering for R.C.C. work up to 10m span including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.
Centering & shuttering for C.C. work & enclosed filter including cost of all material, labour and T&P etc. required for proper completion of work.
Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes,binding wire, steel labour and T&P etc. required for proper completion of work.
Laying RCC in 1:1.5:3 using 4.75 mm to 20 mm size crushed kabrai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc. except steel with mechanical compaction required for proper compaction of work.
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.
Dry Sand filling below foundation including all taxes, cost of all material, labour and T&P, required for proper completion of work.
Double flat brick linning with Ist class brick work in 1:3 CM. with 8mm thick sandwitched plaster with hamirpur coarse sand having F.M not less than 2.0 including all taxes,prepration of subgrade, filling joints with CM cost of all material, labour & T & P etc. required for proper compaction of work.
Two coats of bitumen paintings with two layers of tarfelt again followed by two coats of bitumen painting before laying RCC slab including all taxes, cost of all material, labour and T&P etc., required for proper completion of work.
S/F 20 mm thick joint filler board in construction joint including all taxes, cost of material, labour and T&P etc., required for proper completion of work.
Cement pointing (Struck deep) in 1:2 CM with hamirpur fine sand including all taxes, cost of all material, labour & T & P etc. required for proper compaction of work.
Fixing 100 mm dia GI pipe in crest of Fall and Tail fall including all taxes, cost of all material, labour and T&P etc. required for proper complection of work.
Supplying and laying Ahirora Stone boulder of 40-60 Kg. including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
E/W embankment ramp in making road diversion in all type of soil including all leads, lifts, royalty with proper dressing & mechanical compaction for proper complection of work.
S/F wheel guard stone including cost of all material, labour and T&P, by manufacturing at site including all taxes, cost of all material, labour and T&P etc., required for proper completion of work.
SOB Brick on edge soling on diversion/ramp including prepration of surface and filling joints with local sand including all taxes, cost of all material, labour & T & P etc. required for proper compaction of work.
Pucca road cutting including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
Supply and Laying graded filter including all taxes, cost of all material, labour and T&P etc.required for proper completion of work. coarse sand
Pea gravel/Stone Grit
20 to 40mm natural single/Stone ballast
M/S JANARDAN CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .