Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹5.4 L+₹57,113.67 (11.7%)Rejected-Finance | L2 | Rejected-Finance ok |
Tender Value
₹5.0 L
EMD Value
₹9,800
Closing Date
16 Nov 2023, 5:00 pmClosed
Vijay Dalal
EXECUTIVE ENGINEER PROV DIV NO 4 PWD B AND R PGIMS ROHTAK
Reinvited for Broken boundary wall in Pharmacy Boys Hostel in PGIMS Rohtak
2023_HRY_328045_1
PWD/P4/130
Open Tender
Civil Works
Works
60 days
PGIMS Rohtak
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹9,800
Yes
20 Dec 2023
10 Nov 2023
16 Nov 2023
10 Nov 2023
16 Nov 2023
10 Nov 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. (HSR 4.14.1)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level:1 : 1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm nominal size) (HSR 6.1.6)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level:1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size) (HSR 6.14.1)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size) (HSR 6.15.1)
Centering and shuttering including strutting, propping etc. and removal of form for,Foundations, footings, bases of columns, etc. for mass concrete (HSR 6.30.1)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.Thermo-Mechanically Treated bars of grade Fe-500D or more. (HSR 6.33.6)
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement: 6 coarse sand) (HSR 7.21.2)
Brick work with common burnt clay non-modular bricks of class designation 7 .5 in superstructure above plinth level up to floor IV level in all shapes and sizes in :Cement mortar 1:4 (1 cement: 4 coarse sand) (HSR 7.22.1)
12 mm cement plaster of mix :1 :4 (1 cement: 4 fine sand) (HSR 11.5.3)
15 mm cement plaster on the rough side of single or half brick wall of mix :1 :4 (1 cement: 4 fine sand) (HSR 11.6.1)
Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete (HSR 11.58)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)(HSR 11.96.1)
Sh. Anil Kumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .