Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee | Not Admitted-Fee Fee not received |
| 4 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.9 L
EMD Value
₹3,900
Closing Date
17 Feb 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Electricity Construction and Works Division, P.V.V.N.L., 33 KV Substation RDC, Ghaziabad
Increasing capacity of 33 KV Substation Phase-2, Noida
2021_PVVNL_661575_2
13/ECWD/GZB/2021-22
Open Tender
Electrical Works
Lump-sum
30 days
Ghaziabad
Please refer tender documents
3 documents required · 3 mandatory
₹1,180
Payable at E.E., ECWD, Ghaziabad
₹3,900
24 Feb 2022
3 Feb 2022
17 Feb 2022
3 Feb 2022
17 Feb 2022
3 Feb 2022
180 days
1. a). Disconnecting HT cable connection from 33KV side & 11KV side of 05 MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
b). Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismentling neutral earthing system to facilitate removal of Power transformer from plinth.
c). Disconnecting Earthing strip from body of 05 MVA Power transformer.
2. a) Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S Phase-2, Noida into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by department free of cost & shall be arranged by contractor from store to site under J.E, PVVNL
b). Safe removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
c). Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O
3. Renovation of Transformer Plinth
4. a). Safe Shifting of 10MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard.
b). Erection & Installation of 10MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, proper H.T/L.T connection, complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body.
5. Line isolator Structure a). Fabrication of structure, including cutting, straightening & drilling of holes in Channel/Angle
b). Excavation of earth 2x(1.10x0.60x1.00)
c). Supply & fixing of stone pad of size 300x300x75mm
d). Erection of Line / Bus isolator structure in proper alignment
e). Grouting of structure in C.C ratio 1:3:6 2x(1.10x0.60x1.00)
f). Making plinth by C.C ratio 1:3:6, in size 2x(1.10x0.60x0.30)
g). 12mm thick plastering on plinth in ratio 1:3 of size 2x(1.10x0.30)x2+2x(0.60x0.30)x2+2x(1.10x0.60)x1
6. L.A.'s & P.T structure:- a). Fabrication of structure, including cutting, straightening & drilling of holes in Channel/Angle
b). Excavation of earth 2x(0.90x0.90x1.00) x1+2x(0.45x0.45x1.00)x3
c). Supply & fixing of stone pad of size 300x300x75mm
d). Erection of L.A/P.T structure in proper alignment
e). Grouting of structure in C.C ratio 1:3:6 2x(0.90x0.90x1.00)x1+2x(0.45x0.45x1.00)x3
f). Making plinth by C.C ratio 1:3:6, in size 2x(0.90x0.90x0.30)x1+2x(0.45x0.45x0.30)x3
g). 12mm thick plastering on plinth in ratio 1:3 of size 2x(0.90x0.30)x2+2x(0.50x0.30)x2+2x(0.90x0.50)+2x(0.45x0.30)x3x2+2x(0.45x0.30)+2x(0.45x0.45)x3
7. Water level earthing by Boring and lowering of G.I. pipe of size 40 mm dia & thickness 2mm (ID-36mm, OD-40mm) into the ground at 50 Mtr (160feet) depth upto the water level. The lower end of pipe shall be provided with solid copper cone approx 225 mm long and 750 gm in weight and screwed in pipe and bringing out a continuous copper wire of 6 SWG from the cone up to the Power transformer neutral/ L.A where it will be bolted to the M.S. earth Strip for Transformer neutral connection. Welded to the G.I. pipe and neutral earthing support. No joint in copper wire is allowed,
8. Erection of dismantled neutral earthing L Type support structure made of M.S. Channel size 100x50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300x300x700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer with stone Pad of size (300x300x75mm).
9. Fabrication and grouting of M.S. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The M.S. frame shall be made of M.S. channel (100x50)mm in 'T' shape. Providing 2 Nos. support of M.S. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300x300x700) mm with stone Pad of size (300x300x75mm). The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminium binding wire in complete.
10. Supply & Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 10 MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
11. Painting of Structures Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect.
12. Installation of 11KV Switch Gear in control room i) Erection of 11KV Switchgears in proper alignment, in Control Room, including safe shifting, from Dump Place. Making 4No. Pockets for each and providing/fixing of Reg Bolt by CC in ratio 1:2:4, with tightening also, including safely mounting of 11KV P.T. on 11KV I/C Switchgear, filling of oil (if required), making all electrical connections. i) 11KV Outgoing VCB 200/100/5A, 350MVA
13. a) H.T. Power Cable Laying: Laying 11 KV, (3x300) mm2/(3x400) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.45 m wide, 0.90m depth for single cable. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the cable (minimum 18 Nos. of Ist class bricks are to be laid top and outer side along the cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal's, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
b). Laying and Dressing of 11KV 3x300mm² Power Cable in Air/Trench
c) Supply and filling of sand in cable trench in the Switch Gear Room.
14. Preparation of 11 KV Power Cable ends: a). Making of 11 KV XLPE Heat shrinkable Out door jointing kits after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs.
b). Making of 11 KV XLPE heat shrinkable indoor jointing kits in switch gears after carefully removing the insulation of cable, providing and crimping of proper size of lugs, plumbing and taping of cable with good quality available insulation tape with J/Kit boxes, Fixing and insulating of lugs on cable with switch gear complete in all respect.
15. Digging of Cable Trench of size 1050mmx750mm, for laying of 33KV, 3x300Sq.mm. Cable
16. Safe laying of 33KV, 3x300Sq.mm. XLPE Cable in Cable Trench to respective Double Pole.
17. Providing & Laying of Ist Class Bricks, along the length on both side of 33KV XLPE Cable in Cable Trench (minium 27No. Bricks/Mtr per Cable) and Stone Slab of size 450x600x50mm on top of the each Cable, including providing & filling River Sand inside the Bricks as per specification.
18. Back filling of excavated earth in the cable trench upto the ground level and ramming properly.
19. Making of 33KV Outdoor type cable end termination by heat shrinkable XLPE Cable Jointing Kits and crimping with proper size aluminium lugs. Work includes providing Aluminum lugs, insulating tapes etc as per specifications.
20. Laying of 33KV, 3x300Sq.mm XLPE Cable in the air and mounting and clamping 2No. 33KV XLPE Boxes on double pole structure and making connection with 33KV over head line at both ends.
21. Installation of 24V Battery and Battery Charger: Assembling and installation of the cabinet of 24V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charger with flexible copper lead of size 7/20 SWG shall be provided & done properly by the contractor. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect.
22. Laying of different size of (2x2.5)mm2/ (4x2.5)mm2/ (6x2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT's to CT's Junction Box, CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment.
23. Installation of 33 KV Lightning Arrestors: a). Installation of 33 KV Lightning Arrestors: Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.'s structure/terminal gentry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required.
b). Installation of 33 KV Post Insulators: Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
24. 33 KV Bus Bar Jumpering: a) Stringing of 33 KV bus bar by using and laying ACSR Dog conductor including fixing of P.G.Clamps to complete work with proper sagging of Bus Bar etc.
b). Jumpering, including clamping/binding with ACSR Dog conductor: i). 33KV Post insulator to 33KV line isolator structure.
ii). 33KV line isolator structure to 33KV PT
iii). 33KV PT structure to 33KV L.A
iv). 33 KV L.A. to 33/11 KV Power T/f
25. Construction of S.S.Os. Approach Road-1.2M wide in switch yard by laying dry brick-ballast in 15Cm layer, 115mm thick brick work 1:4 in both side of edge, providing 10Cm thick CC in ratio 1:2:4. the work includes proper plastering top & side of road and making groove, leveling & dressing of earth beneath the brick work on edge.
26. To provide required No. of technicians with proper testing equipments to work on power T/f, HT/LT panels during testing as assisting technical hands of test team during commissioning & energisation.
27. Loading, Safe carriage & unloading of following stock material from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively. a). Steel, Angle channel,
b). Line isolator
d). 200/100/5A 350MVA 11KV outgoing VCB
e). 33KV Post insulator
f). 11KV XLPE cable 3x300mm²
g). 11KV cable J/kit 3x185mm² / 3x300mm²
h). 33KV XLPE Cable 3x300mm²
i). 33KV cable J/kit 3x300mm²
j). Control cable
k). 24 Volt Battery charges with cabinet.
28. Supply & laying of chequred rubber sheet 2000x1000x20 mm of ISI Marked.
29. Dismantling & removal of old & damaged 11KV VCB
30. Safe carriage of old received back material from site to store including loading & unloading at both end.
31. Dismantling & removal of old & damaged 11KV VCB
VASUDEV ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .