Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹66,000Accepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹70,000+₹4,000 (6.06%)Rejected-Finance VILL MOHAMMADPUR DULHIPUR MUGHALSARAI MUGHALSARAI MUGHALSARAI CHANDAULI UTTAR PRADESH 232101 | CHANDAULI | UTTAR PRADESH | 232101 | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹75,120+₹9,120 (13.8%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹1.7 L
EMD Value
₹2,000
Closing Date
24 Mar 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
REPLACEMENT OF 132 KV CIRCUIT BREAKER AND ACDB
2021_UPTCL_545059_1
Short Term E-Tender no. 53/2020-21/ETC/VNS
Open Tender
Electrical Works
Item Rate
15 days
132 KV Substation Cantt
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹236
SE, ETC, Varanasi
₹2,000
19 Aug 2021
28 Jan 2021
25 Mar 2021
28 Jan 2021
24 Mar 2021
5 Feb 2021
180 days
Amount
Replacement of 145 KV Circuit Breaker at 132 KV Substation Cantt Varanasi
Manual shifting of 132 KV CGL/ABB make breaker from storage place up to loading point (Distance approx. 60 Mtr) at 132 KV substation Sarnath. Making arrangement for loading of 01 No healthy breaker with the help of derrick pole and rope . Loading of the same on private vehicle with taking proper care to avoid any damage.
Carriage of 132 KV CGL/ABB make Circuit Breaker from 132 KV Substation Sarnath to 132 KV substation Cantt (Distance approx. 12 KM). Unloading of the same with taking proper safety, shifting and stacking near 132 KV Transfer Bus Coupler bay site.
Making arrangement of De-hoisting of 132 KV CGL make damaged breaker with the help of derrick pole, pully and rope on 132 KV Transfer Bus coupler breaker foundation. Removal of glanding, ferulling and dis-connection of control cable, both side jumper conductor and earthing strip.
Dismantling of damaged 132 KV CGL make breaker (type-120-SFM-32 A) poles and mechanism from foundation and its structure and shifting up to the store (Distance approx. 60 Mtr) and stacking properly.
Sorting, counting, head loading and shifting of Galvanized MS angle of required size from store up to 132 KV Transfer Bus Coupler bay site. Fabrication of foundation base structure to suit already casted 132 KV CGL make pneumatic operated breaker foundation and proposed to erect 132 KV CGL/ABB make breaker by cutting, bending and welding of galvanised angle , drilling of hole of required dia for attaching pre casted foundation and 132 KV CGL/ABB make breaker including all cost of man and T&P with consumables except galvanised MS angle which shall be provided by department.
Erection of breaker base structure on132 KV Transfer Bus Coupler breaker modified base structure foundation. Hoisting of new 132 KV CGL/ABB make breaker mechanism and poles, fixing and tighting with base structure, glanding, ferulling and making connections of control cable, jumpering of both side conductor and checking for smooth operation. Modification of earthing strip by cutting, welding and making holes by drilling at desired place, tighting of earthing strip with breaker earthing terminal and removal of hoisting arrangement.
Replacement of ACDB
Manual shifting of ACDB panel at 220 KV Substation Bhelupur(including shifting on stairs) upto the loading point with all the cost of men, material and T&P required for the job.
Loading of ACDB with the help of Hydra crane on the private vehicle.
Carriage of above said ACDB from 220 KV Substation Bhelupur to 132 KV Substation Cantt Varanasi on private vehicle.(Approx-10 Kms)
Unloading of ACDB with the help of Hydra crane at 132 KV Substation Cantt Varanasi.
Manual shifting of ACDB panel(including shifting on stairs) at 132 KV Substation Cantt Varanasi up to the Control room with all the cost of men, material and T&P required for the job.
Dismantling of existing ACDB by the way of opening all the termination, earthing and putting PVC tape on opened terminations with all associated work required for the successful completion of job.
Manual shifting of dismantled ACDB panel(including shifting on stairs) at 132 KV Substation Cantt Varanasi up to the store room with all the cost of men, material and T&P required for the job.
Making a temporary arrangement for providing AC power to auxilaries, control room, colony, division office etc. With all the cost of men, material, T&P required for the successful completion of job.
Laying of power cable of size 3.5x95/70 sq. mm below the ground level including excavation of trench , laying of cable, putting 1st class bricks on its 75mm edge along with cable on both side, filling the same with Ganga sand and finally putting bricks on 115mm side over the trench.
Installation of existing ACDB by the way of connecting all the termination, earthing etc as per the drawing with all associated work required for the successful completion of job.
M/S P B ENTERPRISES
U K S ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .