Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.2 CrAccepted-AOC | ₹7.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹7.3 Cr+₹9.3 L (1.30%)Rejected-AOC | ₹7.3 Cr+₹9.3 L (1.30%) | 2 | Rejected-AOC L2 |
| 3 | 3₹7.5 Cr+₹31.4 L (4.38%)Rejected-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.5 Cr+₹31.4 L (4.38%) | 3 | Rejected-AOC L3 |
| 4 | 4₹7.5 Cr+₹36.2 L (5.05%)Rejected-AOC NAN | ₹7.5 Cr+₹36.2 L (5.05%) | 4 | Rejected-AOC L4 |
| 5 | 5₹8.1 Cr+₹92.4 L (12.9%)Rejected-AOC | ₹8.1 Cr+₹92.4 L (12.9%) | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L3 | M/S LODHI ENTERPRISES L1 | M/s Bajrang Construction & Suppliars L4 | M/s Kaiser Construction Engineers and Contractor L2 | ARUN CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 195m | 51,135.8 | Cum | 140 ₹71,59,012 | 90 ₹46,02,222 Lowest | 100 ₹51,13,580 | 139.9 ₹71,53,898.42 | 90 ₹46,02,222 Lowest |
| 2.00 | Cutting heavy under growth trees upto 7.50cm dia, including removal of roots with collection and removal. | 2,30,995.2 | Sqm | 2 ₹4,61,990.4 Lowest | 5 ₹11,54,976 | 5 ₹11,54,976 | 3 ₹6,92,985.6 | 3 ₹6,92,985.6 |
| 3.00 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. | 1,705.74 | Cum | 450 ₹7,67,583 | 300 ₹5,11,722 Lowest | 900 ₹15,35,166 | 600 ₹10,23,444 | 800 ₹13,64,592 |
| 4.00 | Earth work in Mar kaber ranker mixed soil for excavation foundation i/c all cost of labour materials and T&Pf or proper completion of work as per direction of Engineer-in-Charge. | 12,858.89 | Cum | 100 ₹12,85,889 | 40 ₹5,14,355.6 Lowest | 80 ₹10,28,711.2 | 70 ₹9,00,122.3 | 90 ₹11,57,300.1 |
| 5.00 | Laying & spreading of Local sand in foundationfor proper completion of work as per direction of Engineer-in-Charge. | 1,149.91 | Cum | 2,000 ₹22,99,820 | 800 ₹9,19,928 Lowest | 1,500 ₹17,24,865 | 1,300 ₹14,94,883 | 2,200 ₹25,29,802 |
| 6.00 | Laying brick rora under the foundation of Apron with proper compaction including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 53.6 | Cum | 1,500 ₹80,400 | 4,800 ₹2,57,280 | 1,500 ₹80,400 | 40 ₹2,144 Lowest | 1,768 ₹94,764.8 |
| 7.00 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 1,064.87 | Cum | 4,500 ₹47,91,915 | 4,000 ₹42,59,480 | 5,200 ₹55,37,324 | 3,900 ₹41,52,993 Lowest | 5,200 ₹55,37,324 |
| 8.00 | C.C. 1 : 1.5 : 3 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 1,061.95 | Cum | 6,000 ₹63,71,700 | 5,500 ₹58,40,725 Lowest | 6,000 ₹63,71,700 | 6,000 ₹63,71,700 | 7,100 ₹75,39,845 |
| 9.00 | C.C. 1 : 1 : 2 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 2.78 | Cum | 8,000 ₹22,240 | 6,100 ₹16,958 Lowest | 7,500 ₹20,850 | 6,800 ₹18,904 | 8,349 ₹23,210.22 |
| 10.00 | Laying cement concrete mix 1:2:4 with stone grit (20mm) i/c all cost of labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge. | 2,190.96 | Cum | 5,800 ₹1,27,07,568 | 4,700 ₹1,02,97,512 Lowest | 6,000 ₹1,31,45,760 | 5,200 ₹1,13,92,992 | 6,000 ₹1,31,45,760 |
Tender Value
₹9.2 Cr
EMD Value
₹18.3 L
Closing Date
12 Mar 2026, 1:00 pmClosed
Superintending Engineer, Fourth Circle, Irrigation
Office of the Superintending Engineer, Fourth Circle, Irrigation Works, civil lines Jhansi
LOT-3 Restoration of Kalpi Distributary from Km 0.000 to Km 22.700 and demarcation of canal land under Betwa Canal Division I, District Jalaun.
2026_UPIDC_1121040_3
05/SE-IV/2025-26
Open Tender
Civil Works - Canal
Item Rate
540 days
Orai
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹18.3 L
6 Apr 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 195m | - | Cum | 191.66 | - |
| 2 | Cutting heavy under growth trees upto 7.50cm dia, including removal of roots with collection and removal. | 0.29 | Sqm | 5.5 | ₹1.6 |
| 3 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. | - | Cum | 977.5 | - |
| 4 | Earth work in Mar kaber ranker mixed soil for excavation foundation i/c all cost of labour materials and T&Pf or proper completion of work as per direction of Engineer-in-Charge. | 1 | Cum | 108.2 | ₹108.09 |
| 5 | Laying & spreading of Local sand in foundationfor proper completion of work as per direction of Engineer-in-Charge. | - | Cum | 2,348.08 | - |
| 6 | Laying brick rora under the foundation of Apron with proper compaction including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | - | Cum | 1,768.31 | - |
| 7 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 1 | Cum | 5,404.21 | ₹5,398.81 |
| 8 | C.C. 1 : 1.5 : 3 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | - | Cum | 7,320.65 | - |
| 9 | C.C. 1 : 1 : 2 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 1 | Cum | 8,349.48 | ₹8,341.13 |
| 10 | Laying cement concrete mix 1:2:4 with stone grit (20mm) i/c all cost of labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge. | - | Cum | 6,713.6 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
05SEIVNIT2025-6.pdf
Tender Documents • 2.76 MB
BOQ_2086827.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .