Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.2 CrAccepted-AOC | ₹7.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹7.3 CrRejected-AOC | ₹7.3 Cr | 2 | Rejected-AOC L2 |
| 3 | 3₹7.5 CrRejected-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.5 Cr | 3 | Rejected-AOC L3 |
| 4 | 4₹7.5 CrRejected-AOC NAN | ₹7.5 Cr | 4 | Rejected-AOC L4 |
| 5 | 5₹8.1 CrRejected-AOC | ₹8.1 Cr | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L3 | M/S LODHI ENTERPRISES L1 | M/s Bajrang Construction & Suppliars L4 | M/s Kaiser Construction Engineers and Contractor L2 | ARUN CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 195m | 51,135.8 | Cum | 140 ₹71.6 L | 90 ₹46.0 L | 100 ₹51.1 L | 139.9 ₹71.5 L | 90 ₹46.0 L |
| 2.00 | Cutting heavy under growth trees upto 7.50cm dia, including removal of roots with collection and removal. | 2,30,995.2 | Sqm | 2 ₹4.6 L | 5 ₹11.5 L | 5 ₹11.5 L | 3 ₹6.9 L | 3 ₹6.9 L |
| 3.00 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. | 1,705.74 | Cum | 450 ₹7.7 L | 300 ₹5.1 L | 900 ₹15.4 L | 600 ₹10.2 L | 800 ₹13.6 L |
| 4.00 | Earth work in Mar kaber ranker mixed soil for excavation foundation i/c all cost of labour materials and T&Pf or proper completion of work as per direction of Engineer-in-Charge. | 12,858.89 | Cum | 100 ₹12.9 L | 40 ₹5.1 L | 80 ₹10.3 L | 70 ₹9.0 L | 90 ₹11.6 L |
| 5.00 | Laying & spreading of Local sand in foundationfor proper completion of work as per direction of Engineer-in-Charge. | 1,149.91 | Cum | 2,000 ₹23.0 L | 800 ₹9.2 L | 1,500 ₹17.2 L | 1,300 ₹14.9 L | 2,200 ₹25.3 L |
| 6.00 | Laying brick rora under the foundation of Apron with proper compaction including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 53.6 | Cum | 1,500 ₹80,400 | 4,800 ₹2.6 L | 1,500 ₹80,400 | 40 ₹2,144 | 1,768 ₹94,764.80 |
| 7.00 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 1,064.87 | Cum | 4,500 ₹47.9 L | 4,000 ₹42.6 L | 5,200 ₹55.4 L | 3,900 ₹41.5 L | 5,200 ₹55.4 L |
| 8.00 | C.C. 1 : 1.5 : 3 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 1,061.95 | Cum | 6,000 ₹63.7 L | 5,500 ₹58.4 L | 6,000 ₹63.7 L | 6,000 ₹63.7 L | 7,100 ₹75.4 L |
| 9.00 | C.C. 1 : 1 : 2 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 2.78 | Cum | 8,000 ₹22,240 | 6,100 ₹16,958 | 7,500 ₹20,850 | 6,800 ₹18,904 | 8,349 ₹23,210.22 |
| 10.00 | Laying cement concrete mix 1:2:4 with stone grit (20mm) i/c all cost of labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge. | 2,190.96 | Cum | 5,800 ₹1.3 Cr | 4,700 ₹1.0 Cr | 6,000 ₹1.3 Cr | 5,200 ₹1.1 Cr | 6,000 ₹1.3 Cr |
Tender Value
₹9.2 Cr
EMD Value
₹18.3 L
Closing Date
12 Mar 2026, 1:00 pmClosed
Superintending Engineer, Fourth Circle, Irrigation
Office of the Superintending Engineer, Fourth Circle, Irrigation Works, civil lines Jhansi
LOT-3 Restoration of Kalpi Distributary from Km 0.000 to Km 22.700 and demarcation of canal land under Betwa Canal Division I, District Jalaun.
2026_UPIDC_1121040_3
05/SE-IV/2025-26
Open Tender
Civil Works - Canal
540 days
Orai
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹18.3 L
6 Apr 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 195m
Cutting heavy under growth trees upto 7.50cm dia, including removal of roots with collection and removal.
Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge.
Earth work in Mar kaber ranker mixed soil for excavation foundation i/c all cost of labour materials and T&Pf or proper completion of work as per direction of Engineer-in-Charge.
Laying & spreading of Local sand in foundationfor proper completion of work as per direction of Engineer-in-Charge.
Laying brick rora under the foundation of Apron with proper compaction including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge.
Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge.
C.C. 1 : 1.5 : 3 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge.
C.C. 1 : 1 : 2 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge.
Laying cement concrete mix 1:2:4 with stone grit (20mm) i/c all cost of labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge.
Centering & Shuttering for C.C. & R.C.C.work with all lead & lift required for proper completion of work including cost of materials and scafolding labours, T&P, etc.
Reinforcement of steel with cutting bending and binding and palcingin position with i/c all cost of labour materials and T.&P.
Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Earth work in Mar,Kankar and Kankar mixed soil filling, raising & stg of bank i/c lead upto 30.00 m and lift 1.50 m with manual compaction and dressing etcfor proper completion of work as per direction of Engineer-in-Charge.
Cement Plaster of 12mm thick 1:3 cement mortar including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Struck pointing 1:2 cement mortar including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
P/Afor two coat of Exterior Emulsion including primer on new surface As per instruction of Engineer-in-Charge (Make Asian apex Ultima, Berger All weather Guard & equ.)
Fabrication and fixing of canal gate shutter including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge.
Supply and fixing of canal gate threaded shoft including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge.
Painting on old rusted steel surface of gates and appurtenances after preparation of surface properly by sand blasting process and applying two coat of Zinc Rich primer and two coat of solvent less epoxy paint including cost of all material, labour T&P and scaffolding required for proper completion of work.
Providing and Laying of LDPE Film on footing box including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-4984
Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 110 mm PE 100 pipe PN4, IS-4984
Painting canal gauges in three colours of enamel paints including figures with cost of labour and enamel paint. for proper completion of work as per direction of Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
05SEIVNIT2025-6.pdf
Tender Documents • 2.76 MB
BOQ_2086827.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid