Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC LER |
| 2 | L2₹5.4 LRejected-Finance S O ASSIAN NO 5 396 DURAISAMY PURAM PICHAMPALAYAMPUDHUR TIRUPUR 641 603 | TIRUPUR | TIRUPUR | TAMIL NADU | 641603 | ₹5.4 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | BABU L2 | ARUMUGAM CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Part I : Construction of Cycles Stand for Govt High School in Meppathurai Panchayat (20.00m*4.00m) | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 27.65 | Cu.m | 224 ₹6,193.60 | 224 ₹6,193.60 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 13.86 | Cu.m | 5,084 ₹70,464.24 | 5,084 ₹70,464.24 |
| 1.03 | Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly | 104 | Cu.m | 123 ₹12,792 | 123 ₹12,792 |
| 1.04 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 0.42 | MT | 83,037 ₹34,875.54 | 83,037 ₹34,875.54 |
| 1.05 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 3.2 | Cu.m | 8,722 ₹27,910.40 | 8,722 ₹27,910.40 |
| 1.06 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 4.42 | Sq.m | 476 ₹2,103.92 | 476 ₹2,103.92 |
| 1.07 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 1.44 | Cu.m | 5,783 ₹8,327.52 | 5,783 ₹8,327.52 |
| 1.08 | Plastering walls with CM 1:5 12mm thick etc., complete | 14.87 | Sq.m | 250 ₹3,717.50 | 250 ₹3,717.50 |
| 1.09 | Supplying,fabricating and fixing of Iron purline made with 40 x 40x3.20 mm M.STube and necessary holes,clit plates are provided on the M.S Tube at an appropriate places as directed . And including cost of bolt,nut,washrsetc,.Complete The iron members are painted with one coat of red oxide primer and two coat of enamel paint. The rate is including cost of welding,drilling and fixing the purline with correct alignment in position and including cost ofLoading, unloading,Transportation charge and any other I.C etc., complete as directed by the departmental officers. corrosive | 204 | RM | 629 ₹1.3 L | 629 ₹1.3 L |
Tender Value
₹5.5 L
EMD Value
₹5,500
Closing Date
5 Aug 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (V.PT) THURINJAPURAM
BLOCK DEVELOPMENT OFFICE THURINJAPURAM
Providing Infrastructure Development works to AGAMT 2023-24 Village Panchayat at Meppathurai Panchayat of 05.08.2023 Thurinjapuram Block in Package No. TPRM/2023-24/10 Tiruvannamalai District.
2023_RDTN_345504_2
Roc.No. 2845/2023/A13-1 DT22.06.2023_10
Open Tender
Civil Works
180 days
THURINJAPURAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,500
5 Mar 2026
31 Jul 2023
5 Aug 2023
31 Jul 2023
5 Aug 2023
31 Jul 2023
Amount
Part I : Construction of Cycles Stand for Govt High School in Meppathurai Panchayat (20.00m*4.00m)
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly
Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete.
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
Plastering walls with CM 1:5 12mm thick etc., complete
Supplying,fabricating and fixing of Iron purline made with 40 x 40x3.20 mm M.STube and necessary holes,clit plates are provided on the M.S Tube at an appropriate places as directed . And including cost of bolt,nut,washrsetc,.Complete The iron members are painted with one coat of red oxide primer and two coat of enamel paint. The rate is including cost of welding,drilling and fixing the purline with correct alignment in position and including cost ofLoading, unloading,Transportation charge and any other I.C etc., complete as directed by the departmental officers. corrosive
Supplying and fixing in position of Special type colour Galvanised sheet of 0.50mm thick of approved quality and best varitey with necessary ridge sheet and rate including cost of necessary bolt,nut,washers etc., complete and ercting the Galvanished Sheet in correct alignment in position used with hydraulic power crane or necessary scoffolding etc., and the rate is including cost of Loading, unloading,Transportation charge and any other I.C etc., complete as directed by the departmental officers.
Supplying,fabricating and fixing of Iron purline made with 75x 75 mm M.S Tube and necessary holes,clit plates are provided on the M.S Tube at an appropriate places as directed . And including cost of bolt,nut,washrs etc,. Complete The iron members are painted with one coat of red oxide primer and two coat of enamel paint. The rate is including cost of welding, drilling and fixing the purline with correct alignment in position and including cost of Loading, unloading,Transportation charge and any other I.C etc., complete as directed by the departmental officers.
Providing name board including lettering
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid