Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19,909.98Admitted-Finance | -78.10% | ₹19,909.98 | L1 | Admitted-Finance |
| 2 | L2₹22,028.26Admitted-Finance | -75.77% | ₹22,028.26 | L2 | Admitted-Finance |
| 3 | L3₹30,919.57Admitted-Finance | -65.99% | ₹30,919.57 | L3 | Admitted-Finance |
| 4 | L4₹42,247.35Admitted-Finance | -53.53% | ₹42,247.35 | L4 | Admitted-Finance |
| 5 | L5₹43,832.87Admitted-Finance | -51.79% | ₹43,832.87 | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
9 Apr 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_306573_11
e-NIT 100 of 2025-26
Open Tender
Civil Works
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹20,000
Yes
20 Apr 2026
20 Mar 2026
10 Apr 2026
20 Mar 2026
9 Apr 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Slip Clearance | - | - | - | - | |
| 0.0 | In ordinary soils | - | cum | - | - |
| 0.9 | In soils; mixed with moorum/Kankar/ shingle/ boulders; | - | cum | - | - |
| 0.0 | In soils; mixed with Decomposed Rocks; by blasting or any other means | - | cum | - | - |
| 0.9 | In medium hard rocks ; by blasting | - | cum | - | - |
| 0.0 | In hard rocks; by blasting | - | cum | - | - |
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms including getting out excavated earth and disposal of surplus excavated earth as directed, with in a lead of 50 metres. | - | - | - | - | |
| 0.0 | All kinds of soil | - | cum | - | - |
| 0.0 | Ordinary Rock | - | cum | - | - |
| 0.9 | Hard Rock (Requiring Blasting ) | - | cum | - | - |
stage.html
html • 0.04 MB
techsummary_995370.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_995370.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid