Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4,998.63Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹10,048.01+₹5,049.38 (101.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹10,148.49+₹5,149.86 (103.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹10,149.50+₹5,150.87 (103.0%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
10 Aug 2026, 4:00 pmClosed
Executive Engineer RNB Division Chadoora
CHADOORA
Supply, installation/Arrangement of various Construction, Supply, installation, of various components/ items viz, Pedestal Inauguration/ foundation, Shamiyana, Seating arrangement, etc. stone for inauguration/ foundation stone laying ceremony of var
2026_PWDJK_319383_1
NIT NO 33
Open Tender
Civil Works
Percentage
150 days
CHADOORA
AS PER NIT
4 documents required · 4 mandatory
₹200
Yes
Executive Engineer RNB Division Chadoora
₹1,000
Yes
13 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of 9" thick Pedestal of standard design and pattern including fixing of foundation stone of standard size(to be paid seperately) in brickwork 1:6 cement mortar including plastering with cement plaster 1:4 mix, tile work of standard quality on fron and sides only , supported on cement concrete foundation (9" depth) of appropriate size resting on 6" thick stone soling including excavation, finishing, curing, carriage of materials, all leads and lifts. complete job as per directions of Engineer-in-charge. | - | Sft | - | - |
| 2Construction /Manufacturing and supply of wooden pedestal made of Russian wood frame work of 2"x5" of appropriate design, pattern and stability with proper foot rests as per directions of Engineer-in-Charge finished with teak laminated sheet over 12mm thick ply board including necessary beading and nailis, etc for fixng of foundation stone ((to be paid seperately). Incl. carriage back to Departmental store. | |||||
| 3Supply and Fixing charges for fixing of foundation stone in wooden pedestal | |||||
| 4Supply of Granite stone (16mm thk) of appropriate size, colour and of standard quality with necessary engraving and lettering including finishing, all carriage invovled complete job. | |||||
| 5Supply of artifical compsit marbal/ granite board (16mm thk) as foundation stone of appropriate size, colour and of standard quality with necessary engraving and lettering including fixing in wooden pedestal, finishing, etc. Complete job | |||||
| 6Supply of curtain of approved quality, pattern, size, colour and design including all fixtures for foundation/inauguration stone as per directions of Engineer-in-Charge Incl. carriage to departmental store with installation of same. | |||||
| 7Hire and labours charges for errection of kanth for side pavelion of superior quality/ size of superior colour to be errecting prior to function as per requirement on the designated site all complete upto required height upto 8 Ft errected with bamoo posts and tied with ropes including General watch and ward all leads lifts and carriages both sides complete job. including removal of the same after concluding of function. | |||||
| 8Hire and labours charges fort errecting of Shamiyana including providing of Crewal on walls and ceiling of required quality with Kanth for VIP stage and fixing with ceiling and pillers including General watch and ward and removal of same after clebration incl. supporting members of bemboo/ pipes tied with ropes and other tools required with hire and labour charge of carpets of superior quality and all carriages to and for all leads and lifts complete required size. | |||||
| 9Hire and labours charges fort errecting of water proof Shamiyanal with bamboo/ pipe posts and tied with ropes and other tools required including lining for sides/ ceiling including with kanath and finished with dragget sheets including general watch and removal of same complete as directed by Engineer at site. | |||||
| 10Hire charges for sofa including tables etc for VIP to be supplied before 24 hours of parade at required including all carriages complete as directed by Engineer I/C complete job | |||||
stage.html
html • 0.02 MB
finance_1057752.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1057752.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .