Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.0 LRejected-Finance 123 KUMARDIHI KUMARDIHI KUMARDIHI BARDHAMAN WEST BENGAL 713363 | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | ₹3.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 LRejected-Finance 21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | ₹3.1 L | L3 | Rejected-Finance L3 |
Tender Value
₹2.9 L
EMD Value
₹5,900
Closing Date
10 Feb 2026, 10:30 amClosed
EEC, BR-VII
9/1A, AJC BOSE ROAD, KOL-17
PAINTING OF OFFICE BUILDING, PRAYER SHED AND OTHER ANCILLARY CIVIL WORK AT GOBRA BURIAL GROUND - I, II, AND III UNDER BOROUGH - VII
2026_KMC_997248_14
KMC/EEC/VII/25-26/1
Open Tender
CIVIL WORKS
21 days
BOROUGH VII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,900
4 Apr 2026
2 Feb 2026
12 Feb 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof.
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25%
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 15. Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials.
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (a) Tack weld
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor. ( 3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface : With other than hi-gloss of approved quality-(iv) Two coats (with any shade except white)
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(4)Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty(to be done under specific instruction of Superintending Engineer) :(Two coats) i) Standard Quality
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 9 Dry Distemparing to interior walls or ceiling including cleaning, washing, smoothening surface (b) Two coat
ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36..Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(b) Above 30 mm & upto 37 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL (10th Corrigenda & addenda dated 22.01.2020)
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
TFGMBG15.pdf
Tender Documents • 0.55 MB
BOQ_2441989.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid