Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Fee/PreQual/Technical/Finance | -26.77% | ₹10.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.2 L+₹26,212.25 (2.40%)Admitted-Fee/PreQual/Technical/Finance | -25.01% | ₹11.2 L+₹26,212.25 (2.40%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.3 L+₹38,424.78 (3.52%)Admitted-Fee/PreQual/Technical/Finance BEDKAR 3RD CROSS STREET ANNA SALAI ANNA SALAI 1ST CROSS INIT 41 ZONE 14 | CHENNAI | TAMIL NADU | 600001 | -24.19% | ₹11.3 L+₹38,424.78 (3.52%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.9 L
EMD Value
₹14,900
Closing Date
10 Sept 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E1/5014/2026 Attending Road Cut Restoration Work (CMWSSB) at Sai Ganesh Nagar 30th Cross Street in Dn. 191, Unit-43, Zone-14.
2026_CoC_700996_1
Z.O.XIV.C.NO.E1/5014/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹14,900
11 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation And Deposting on Bank With In...mall Size Boulders And Hard Gravelly Soil (SS 20A) | 210 | CUM | 156.4 | ₹32,844 |
| 2 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 144 | CUM | 2,709.1 | ₹3,90,110.4 |
| 3 | Cold Milling of Existing Asphalt Pavement to a Required Depth And The Milled Surface To Be Cleaned. | 22 | CUM | 3,277.09 | ₹72,095.98 |
| 4 | Providing And Laying. In Position, Standardised Co...The Department For The Excess Usage of Materials). | 58 | CUM | 9,539.34 | ₹5,53,281.72 |
| 5 | Providing And Laying Tackcoat Over The Existing Co...plete As Per Clause 503 of Mort &H Specifications. | 1,005 | SQM | 21.53 | ₹21,637.65 |
| 6 | Providing and laying Bituminous Concrete to 30 mm ...ation using CMP as per clause 507 of MORTH Rev-5 | 1,005 | SQM | 369.63 | ₹3,71,478.15 |
| 7 | Carting | 232 | CUM | 206.4 | ₹47,884.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
5014.pdf
Tender Documents • 1.69 MB
BOQ_842557.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .