Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹49.6 LAWARDED | AWARDED |
Tender Value
₹47.4 L
EMD Value
₹94,800
Closing Date
15 Mar 2025, 10:00 pmClosed
Public Works Department
Package-2 (1)Annual Maintenance to NH-4-Hulikatti Kotabagi-Kalabhavi -SH-140 Road from Km 9.25 to 9.57 and Km 9.755 to 10.075 in Kittur Taluka (2) Annual Maintenance to Kittur Tigadolli Road from Km 0.00 to 7.50 (3) Annual Maintenance to Kittur Honnapur Kulavalli Cross Road from Km 2.20 to 2.50 and Km 5.375 to 6.50 (4) Annual Maintenance to Avaradi-Shivanur-Nichanaki NH4 Road from Km 3.80 to 5.70 (5) Annual Maintenance to Khodanpur Khanapur Via Kadasagatti Road from Km 0.00 to 2.00 (6) Annual Maintenance to Machi Kulavalli Ganganhatti Sagara Kattaridaddi Road from Km 0.00 to 2.30 Km 2.40 to 9.15 (7) Annual Maintenance to Jamalur Hire Nandihalli Kalabhavi Kadatanhal Road from Km 0.00 to 7.40 (8) Annual Maintenance to Kittur-Khodanpur Via Mallapur Awaradi Road from Km 2.50 to 3.40, Km 6.30 to 7.20, Km 7.90 to 11.334 (9)Annual Maintenance to NH4-M.K.Hubli-Veerapur-Amarapur-M.K.Hubli Road from Km 1.20 to 1.30, Km 1.30 to 1.40 and Km 1.40 to 5.40 in Kittur Taluka (10)Annual Maintenance to NH4 Devarashigihalli Ambadagatti Bachanakeri Road from Km 0.00 to 5.50 & Km 6.30 to 6.58 and Km 11.12 to 11.66 in Kittur Taluka (11)Annual Maintenance to Ugarkhod Dematti-Chikkanandihalli to join Alnavar Betageri SH140 Road from Km 0.00 to 0.265, Km 3.08 to 5.53, Km 5.53 to 5.74, Km 5.74 to 5.96, Km 5.96 to 6.01, Km 6.01 to 7.20 and Km 7.425 to 7.75 in Kittur Taluka (12)Annual Maintenance to Alnavar-Betageri SH-140-Avaradi Turakara shigihalli Road from Km 1.265 to 1.465, Km 3.565 to 6.10 and Km 6.10 to 6.30 (13) Annual Maintenance to Ningapur Katridaddi Galaginamada Dharwad border Road from Km 0.00 to 1.54 & Km 4.487 to 5.64 (14) Annual Maintenance to NH4 Dombarakoppa via GOVT.Hospital Mallapur KA Chikkanandihalli Road from Km 3.02 to 4.40 & Km 5.10 to 5.40 in Kittur Taluka (CALL-3)
PWD/2024-25/RD/WORK_INDENT19910
PWD/2024-25/RD/WORK_INDENT19910
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Belagavi
₹1,190
₹94,800
1 Mar 2025
1 Mar 2025
17 Mar 2025
13 Mar 2025
Package-2 Annual Maintenance to NH-4-Hulikatti-Kotabagi-Kalabhavi SH-140 Road, Kittur Tigadolli Road, Kittur-Honnapur Road, Avaradi-Shivanur Road, Khodanpur Khanapur Road, Machi Kulavalli Road, Jamalur HireNandihalli Road, Kittur Khodanpur Road, NH4-M.K.Hubli-Veerapur-Amarapur-M.K.Hubli Road, NH4-Devarashigihalli Ambadagatti Bachanakeri Road, Ugarkhod Dematti Road, SH-140-Avaradi-Turakarashigihalli Road, Ningapur Katridaddi Road, NH4 Dombarakoppa Road in Kittur Taluka under 3054 MDR Maintenance
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Water Bound Macadam: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Water Bound Macadam: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting [I.No.-8.18 / Page- 67 of PWD SR (Vol...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Water Bound Macadam: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading...
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting [I.No.-8.18 / Page- 67 of PWD SR (Vol...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.[I.No.-16...
Maintenance of Earth Shoulder (stripping excess soil): Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor [I.No.-10.3 / Page- 91 of PWD S...
Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate e...
Patching of Shallow Potholes using SDBC Gr II 25 mm thick: Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing th...
Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereeni...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km ...
White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specific...
Maintenance of Culverts: Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification C...
Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading...
Employing Mazdoor for Maintenance and Supervision of Road Zone II ( IV Un-Skilled Sl. No. 5)
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .