| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Thiru. Nazar has been quoted lowest rate of 0.19 percentage below from the estimate rate and his rate has been approved. |
| 2 | L2₹4.3 L+₹23,428.10 (5.73%)Rejected-Finance | ₹4.3 L+₹23,428.10 (5.73%) | L2 | Rejected-Finance Thiru. K. Balachandran has been quoted lowest rate of 5.53 percentage above from the estimate rate. |
| Sl No | Description | Qty | Unit | K BALACHANDRAN | NAZAR |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 8 | m3 | 2,200 ₹2,596 | 2,160 ₹2,548.8 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 2.6 | m3 | 23,348 ₹27,550.64 | 23,306.4 ₹27,501.55 Lowest |
| 3.00 | Supplying, Fabricating and placing in position mild steel or deformed steel bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers. | 640 | Kg | 76,800 ₹90,624 | 67,840 ₹80,051.2 Lowest |
| 4.00Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete. | |||||
| 4.10 | Coloumn | 15 | m2 | 27,300 ₹32,214 | 26,370 ₹31,116.6 Lowest |
| 4.20 | Grade Beam | 10 | m2 | 7,600 ₹8,968 | 7,150 ₹8,437 Lowest |
| 4.30 | Slab | 33 | m2 | 49,170 ₹58,020.6 | 48,345 ₹57,047.1 Lowest |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 8 | m3 | 1,01,600 ₹1,19,888 | 1,01,368 ₹1,19,614.24 Lowest |
| 6.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 3.5 | m3 | 37,100 ₹43,778 | 36,900.5 ₹43,542.59 Lowest |
| 7.00 | Plastering with cement mortar 1:3 ( One cement and three sand)10 mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification | 33 | m2 | 16,500 ₹19,470 | 15,147 ₹17,873.46 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
26 Aug 2025, 3:00 pmClosed
Executive Officer
Devarshola Town Panchayat Office, Devarshola Post, The Nilgiris - 643207
MLA CDS - 2025-2026 - Construction of Shed at Muslim Burial Ground in Ward No.8
2025_DTP_592814_1
321/2025/A1-4
Open Tender
Civil Works
Works
120 days
Devarshola Town Panchayat Office
MLA CDS - 2025-2026 - Construction of Shed at Muslim Burial Ground in Ward No.8
2 documents required · 2 mandatory
₹0
₹5,000
Yes
11 Sept 2025
14 Aug 2025
26 Aug 2025
14 Aug 2025
26 Aug 2025
14 Aug 2025
14 Aug 2025 - 26 Aug 2025
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supplying, Fabricating and placing in position mild steel or deformed steel bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.
Coloumn
Grade Beam
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Plastering with cement mortar 1:3 ( One cement and three sand)10 mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification
Plastering with cement mortar 1: 5 mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification
Painting two coats of newly plastered wall surface with ready mixed Cement paint of first quality and of approved colour over a priming coat including preparing the surface, clean removal of dirt and including necessary plaster of paris putty wherever required etc., complete complying with standard specification.
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .