Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC QUALIFIED FOR AOC |
Tender Value
₹4.3 L
EMD Value
₹8,700
Closing Date
22 Mar 2019, 5:30 pmClosed
CMC
UMC BUILDING CHATRAPATI SHIVAJI BHAVAN, AGAR ROAD UJJAIN
MINI HIGH MAST MAY LED WORK IN WARD 09
2019_UAD_23936_1
UMC/Light/2019
Open Tender
Electrical Works
Item Rate
15 days
UMC BUILDING CHATRAPATI SHIVAJI BHAVAN, AGAR ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
CMC
₹8,700
4 Sept 2020
8 Mar 2019
25 Mar 2019
8 Mar 2019
22 Mar 2019
8 Mar 2019
Amount
Supply, installation testing & commissioning of LED Flood light Luminaires of Wattage 140-150W, with IP 66 rating. The fixture should be made of pressure die cast Aluminium / Aluminium Extrusion and clear flat glass , integral control gear, IK 07 or above. The fixture should have lumen maintenance of at least 70percent at 50000 burning hours at ambient temp of 35 degree C. The driving current for LED should be Max 1A +10 percent . The efficacy of fixture should be at least 90 lumens/watt (+3percent).The power factor of driver should be ) 0.9 and the THD ( 20percent & surge . Protection 10Kv. CRI ) 70percent. The Fixture should be complete with Lamp , control gear and all other accessories. vendor should provide LM 79 and LM 80 Test report. Luminaire. and 3 years gugarantee certificate from manufacturer 150 watt. (Non SOR)
Supply, installation testing & commissioning of LED Flood light Luminaires of Wattage 90 W, with IP 66 rating. The fixture should be made of pressure die cast Aluminium / Aluminium Extrusion and clear flat glass , integral control gear, IK 07 or above. The fixture should have lumen maintenance of at least 70 percent at 50000 burning hours at ambient temp of 35 degree C. The driving current for LED should be Max 1A +10 percent . The efficacy of fixture should be at least 100 lumens/watt (+3 percent). The power factor of driver should be &/bkt1 0.9 and the THD &bkt1 20percent & surge . Protection 10Kv. CRI &/bkt1 70percent. The Fixture should be complete with Lamp , control gear and all other accessories. vendor should provide LM 79 and LM 80 Test report. Manufacturer manadatory i/c 50mm.dia G.I. Pipe bracket upto 2 mtr. long in required angle/shape, connection lead, testing etc to complete the job. 3 Yrs Guarantee certificate from manufacturer.90 watt (Non SOR )
Bidder Name
Amount
PATEL BROTHERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .