Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
15 Jun 2020, 2:30 pmClosed
SE/GEDC/GOBI
SE/GEDC, 132 D, CUTCHERRY STREET, GOBI
WCT FOR EREC,DISM, TRANS OF POLES, DT,HT/LT LINES AND OTHER EXTENSION WORKS IN ANTHIYUR SUB DIVISION
2020_EB_165702_1
ET.NO.05 DT.27.05.2020
Open Tender
Electrical Works
Works
365 days
SE/GEDC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
17 Jul 2020
30 May 2020
16 Jun 2020
30 May 2020
15 Jun 2020
30 May 2020
Amount
Excavation of pole pit upto 27" (8.0 m) Pole by using JCB or manual
Excavation of stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual
Excavation of RSJ pole pit above 36' by using JCB or manual
Excavation of pole/stay pit hard rock requires blasting
Excavation of poles /stay pit hard rock without blasting (where houses are located)
Erection of RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Dismantling of RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of RCC poles/Metal poles upto 9.14m.(30') by using JCB or maual
Dismantling of RCC poles/Metal poles upto 9.14m.(30') by using JCB or maual
Erection of RSJ joists, fabricated poles above 30'-0" (9.14 m) by using JCB or manual.
Dismantling of RSJ joists, fabricated poles above 30'-0" (9.14 m) by using JCB or manual.
Erection of RSJ joists, fabricated poles above 36'-0' by using JCB or maual
Dismantling of RSJ joists, fabricated poles above 36'-0' by using JCB or maual
Erection of stay set complete
Fixing of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Dismantling of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Fixing of LT 3 phase cross arms
Dismantling of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Dismantling of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Dismantling of HT/LT TI Fittings
Fixing of HT pin Insulators 22 KV
Dismantling of HT pin Insulators 22 KV
Fixing of HT 22 KV strain disc.
Dismantling of HT 22 KV strain disc.
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT shackle
Dismantling of LT shackle
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Fixing of Guarding Cross arm
Fixing of Tapping Channel Cross arm
Earthing of pole with pin including burying looping and binding.
Paving of conductor,stringing etc.. Complete with 7/4.09 mm ACSR conductor.
Dismantling of conductor,stringing etc.. Complete with 7/4.09 mm ACSR conductor.
Paving of conductor,stringing etc. complete with 7/3.35 mm ACSR 7/3.0 mm AAAC.
Dismantling of conductor,stringing etc. complete with 7/3.35 mm ACSR 7/3.0 mm AAAC.
Paving of conductor ,stringing etc.complete with 7/2.59 mm ACSR 7/2.11 mm ACSR
Dismantling of conductor ,stringing etc.complete with 7/2.59 mm ACSR 7/2.11 mm ACSR.
Mass concreting including materials (Cement 1/2 bag + river sand and Blue metals and watering).
Sleeve concreting including materials (Cement 1/2 bag + river sand and Blue metals and watering).
Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Transporting of Distribution Transformers/Meteringsets by using private vehicle other than bullock cart up to 30 Km.
Transporting of Distribution Transformers/Metering sets by using private vehicle other than bullock cart above 30 Km
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)below 8 Kms
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)above 8 KM for additional KM.
Loading of poles upto 27'-0"
Loading of poles upto 30'-0"/RSJ Pole
Un loading of poles upto 27'-0"
Un loading of poles upto 30'-0"/RSJ Pole
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading or unloading of Transformer upto 200 KVA for each
Erection of New Transformer upto 200 KVA
Dismanting of of New Transformer upto 200 KVA
Re-sagging (HT) 7/4.09mm
Re-sagging (HT)7/3.35mm
Re-sagging (HT) 7/2.59mm
Erection of street light including fixure fitting
Dismantling of street light including fixure fitting
Erection of street light service
Releasing of grills from RCC Poles
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Erection of D.P. structure with AB switch top channel, cross brancing, HG fuse set, earthing painting earthing painting, providing stay and pole concreting
Erection of New 10' Earth pipe replacing the carroded earth pipe and renewal of earthing including burying looping and binding.
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of flat
Cutting of channel
Cutting of Angle
Cutting of pipe
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .