| 1 | L1₹25.9 CrFinancial bid opened Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | ₹25.9 Cr | L1 | Financial bid opened |
| 2 | L2₹26.2 CrFinancial bid opened Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | ₹26.2 Cr | L2 | Financial bid opened |
| 3 | L3₹26.4 Cr Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | ₹26.4 Cr | L3 | - |
| 4 | L4₹26.5 CrFinancial bid opened Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | ₹26.5 Cr | L4 | Financial bid opened |
| 5 | L5₹27.1 Cr Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis. | ₹27.1 Cr | L5 | - |
| Sl No | Description | Qty | Unit | BUILTECH ENGINEERING SOLUTIONS L5 | J N CONSTRUCTION COMPANY, BANGALORE L6 | M/S. NAIDU CONSTRUCTION CO L1 | Sukhdevraj Sharma Engineers and Contractors Pvt Ltd L10 | N J R Construcions Pvt Ltd L4 | Rachisu Constructions L3 | S A Infra Projects (India) Pvt Ltd L7 | Ravindranath Constructions Private Limited L2 | M/S GADHIRAJU CONSTRUCTIONS PRIVATE LIMITED L9 | V C BIRADAR, Pune L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil component | - | - | -23.67 ₹21.7 Cr | -23.56 ₹21.7 Cr | -29.22 ₹20.1 Cr | -15.45 ₹24.0 Cr | -25.2 ₹21.2 Cr | -25.65 ₹21.1 Cr | -20.25 ₹22.6 Cr | -21.96 ₹22.2 Cr | -18 ₹23.3 Cr | -19.03 ₹23.0 Cr |
| 2 | Electrical component | - | - | -23.67 ₹5.4 Cr | -11.23 ₹6.3 Cr | -18 ₹5.8 Cr | -15.45 ₹6.0 Cr | -25.2 ₹5.3 Cr | -25.65 ₹5.2 Cr | -20.25 ₹5.6 Cr | -43.02 ₹4.0 Cr | -18.18 ₹5.8 Cr | -18.09 ₹5.8 Cr |
Tender Value
₹35.4 Cr
EMD Value
₹45.4 L
Closing Date
31 Jul 2025, 12:30 pmClosed
EE- Hubli
RAMASWAMY NATARAJAN MANJUNATH
9880616795
Hubli Division, CPWD, Hubli
Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis.
119855
33/Hubli/SE/EE/e-Tender/2025-26
OPEN
Civil Works - Buildings
450 days
Kalaburagi, Karnataka
12 documents required · 12 mandatory
₹45.4 L
Office of Superintending Engineer, CPWD, Mysore
16 Jul 2025
16 Jul 2025
31 Jul 2025
31 Jul 2025
21 Jul 2025
21 Jul 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Part+2+PG+1-77.pdf
document • 2.59 MB
Part+2+PG+78-113.pdf
document • 0.59 MB
Part+3+PG+114-239.pdf
document • 1.09 MB
Part+4+PG+240-472.pdf
document • 2.00 MB
Part+5+PG+473-633.pdf
document • 2.13 MB
Part+6+PG+634-669.pdf
document • 0.66 MB
PART+E+Drawing++-670-683.pdf
document • 13.59 MB
PART+E+GIRLS+SOIL+REPORT+-684-701.pdf
document • 0.76 MB
Download all tender documents and submit your bid