Loading…
Loading…
Tender Value
Refer Docs
Closing Date
23 Dec 2025, 11:00 amClosed
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
81
2 conditions · 2 needing a document upload
1.Past Performance The firm must submit documentary evidence of past performance, demonstrating supply of at least 30% of the NIT quantity in a single Purchase Order (PO) of the tendered item, to Indian Railways within the last 3 years 2. Required Documents The documentary evidence must include: Copies of Receipts Note/Receipted challans/CRN/CRAC (in case of Gem Case)/IC issued by TPI,performance Certificate from Consignee. 3. Rejection Criteria Failure to provide the required documentary evidence will result in the summarily rejection of the offer. 4. Important Note Submission of only a purchase order copy without the required supporting documents will not be considered as proof of past performance. These documents must be submitted along with their offer. Failure to provide this documentary evidence of successful supply will result in summary rejection of the offer. Please note that submission of only a purchase order copy will not be considered as proof of past performance.
Authorization:- 1. Only OEMs or their authorized dealers are eligible. 2. Dealers must submit a Tender-Specific Authorization (TSA) from the OEM, mentioning the tender number and opening date. 3. Non-compliance will result in summary rejection of the offers submitted by dealers without any further reference.
19 conditions · 2 needing a document upload
LIQUIDATED DAMAGE (LD) ON DELAYED SUPPLY: For delayed supplies, Recovery of Liquidated Damage (LD) shall be levied @1/2% (half percent) of the price of the store per week or part of the week during which delivery is accepted and the upper limit for recovery of LD in supply contracts is 10%(ten percent) of the value of contract irrespective of delays, unless otherwise provided, specifically in the contract
PACKING : The tendered materials are to be packed firmly secured and for safe transit to ensure the receipt on supply in good condition at destination
Firm to note that single use plastic should not be used in packing, if material to be supplied otherwise it will be rejected. Collection of non- bio degradables old waste after successful delivery of the product/material from consignee place will be arranged by the supplier.
Collection of Bio Waste _Collect back scheme for packing waste under SWM: Collection of non - biodegradable solid waste after successful delivery of the product / material from consignee place will be arranged by the supplier.
The bidder confirms that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance, and such terms quoted anywhere else should be ignored. (Denial of this condition not (recommended).
In case of MRP In case item is supplied in standard pkg or otherwise with MRP printed, the consignee shall ensure that PO rates shall not be more than MRP printed on the pkg or otherwise. In case, PO rate is more than MRP rates, then consignee should immediately inform PO issuing authority, bringing out the details of MRP and PO rates so that suitable amendment in rate can be issued by PO issuing authority. Only after receipt of amendment, bill should be forwarded. The despatch/delivery details against this purchase order should be advised to the undersigned invariably.
Inspection by TPI Agency
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Collection of Bio Waste _Collect back scheme for packing waste under SWM: Collection of non - biodegradable solid waste after successful delivery of the product / material from consignee place will be arranged by the supplier.
1 location across Maharashtra · 536 Numbers total
Earthing Cable complete for LHB coaches
81256431~WR
81256431
Open - Indigenous
Goods
Maharashtra
₹0
Exempted
23 Dec 2025
23 Nov 2025
1 item · 536 Numbers total
Earthing Cable complete for LHB coaches to RCF drawing no LW71249, Alt c, material and sp ecification as per drawing, confirming RCF Spec no EDTS-101 Rev C, Amndt-2, Corr. 7, annex 1 or latest. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE ( C & W ) BANDRA TERMINUS, WR | Maharashtra | 536.00 Numbers |
| Total | 536 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EDTS-101Rev-CCorr-12345678Am-123RcfAnnex-1.pdf
ATTACHMENT
LW71249DRAWING.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .