| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.1 LAdmitted-Finance AT PO KISHOREGANJ PATNA ANAND BAZAR TALCHER TOWN DIST ANGUL ODISHA 759107 | TALCHER TOWN | ANGUL | ODISHA | 759107 | -47.97% | ₹31.1 L | L1 | Admitted-Finance |
| 2 | L2₹32.6 L+₹1.4 L (4.61%)Admitted-Finance A PO JANDABAHAL DHARAMPUR TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | -45.57% | ₹32.6 L+₹1.4 L (4.61%) | L2 | Admitted-Finance |
| 3 | L3₹36.1 L+₹5.0 L (16.1%)Admitted-Finance AT PO REMUAN ARYAVIHAR HATATOTA TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | -39.61% | ₹36.1 L+₹5.0 L (16.1%) | L3 | Admitted-Finance |
| 4 | L4₹38.7 L+₹7.6 L (24.4%)Admitted-Finance | -35.30% | ₹38.7 L+₹7.6 L (24.4%) | L4 | Admitted-Finance |
| 5 | L5₹39.5 L+₹8.4 L (27.0%)Admitted-Finance | -33.90% | ₹39.5 L+₹8.4 L (27.0%) | L5 | Admitted-Finance |
Tender Value
₹70.5 L
EMD Value
₹88,100
Closing Date
17 Aug 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), LINGARAJ AREA
SO (CIVIL), OFFICE OF THE GM, LINGARAJ AREA TALCHER, ANGUL_759102, ODISHA, INDIA
Repairing and Renovation of Existing Boundary Wall Along the Coal Corridor Road Near the MGR Siding of Lingaraj OCP, Lingaraj Area
2026_MCL_362949_1
MCL/GM(LA)/e-Tender/ SO(C)/26-27/030 dt.01.08.2026
Open Tender
Civil Works - Others
Percentage
60 days
Lingaraj OCP
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹88,100
21 Sept 2026
2 Aug 2026
18 Aug 2026
2 Aug 2026
17 Aug 2026
2 Aug 2026
2 Aug 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | - | Cum | 1,422.45 | - |
| 1.02 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | 7,009.05 | - |
| 1.03 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | Cum | 8,464.45 | - |
| 1.04 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 101.4 | - |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm | 283.1 | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | 526.7 | - |
| 1.07 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | 5,457.4 | - |
| 1.08 | 12 mm cement plaster of mix:1:6(1 cement: 6 fine sand) | - | Sqm | 226.25 | - |
| 1.09 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm | - | Sqm | 158.15 | - |
| 1.1 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | Kg | 124 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 2.32 MB
BOQ_375864.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .