Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹914.50Admitted-Finance | ₹914.50 | L1 | Admitted-Finance |
| 2 | L2₹975.86+₹61.36 (6.71%)Admitted-Finance | ₹975.86+₹61.36 (6.71%) | L2 | Admitted-Finance |
| 3 | L3₹1,017.16+₹102.66 (11.2%)Admitted-Finance | ₹1,017.16+₹102.66 (11.2%) | L3 | Admitted-Finance |
| 4 | L4₹1,038.40+₹123.90 (13.5%)Admitted-Finance | ₹1,038.40+₹123.90 (13.5%) | L4 | Admitted-Finance |
| 5 | L5₹1,095.04+₹180.54 (19.7%)Admitted-Finance | ₹1,095.04+₹180.54 (19.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S N ENERGY L5 | YOGENDRA ELECTRICAL WORKS L6 | AMIT PRAKASH TRIPATHI L7 | TECHNOCRAT ENGINEERING WORKS L1 | RICHA ENTERPRISES L3 | SHRI PARAMHANS CONSTRUCTION L2 | NOVATION INDIA L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | 2" Railing and pipe lines surface area = 819.82 Sq M. | 999.95 | Sq. M. | 116 ₹136.88 | 151 ₹178.18 | 159 ₹187.62 | 95 ₹112.1 Lowest | 98 ₹115.64 | 145 ₹171.1 | 110 ₹129.8 |
| 2.00 | (2"+ 21/2''+3/4) Railing + 4'' pipe line +5'' pipe line + 6'' pipe line + 10'' pipe line | 3,065.5 | Sq. M. | 116 ₹136.88 | 151 ₹178.18 | 159 ₹187.62 | 95 ₹112.1 | 98 ₹115.64 | 87 ₹102.66 Lowest | 110 ₹129.8 |
| 3.00 | Painting of supporting flat angle (2 surface) surface area | 534.45 | Sq. M. | 116 ₹136.88 | 151 ₹178.18 | 159 ₹187.62 | 90 ₹106.2 Lowest | 98 ₹115.64 | 107 ₹126.26 | 110 ₹129.8 |
| 4.00 | Generator Transformer & 11 KV bus duct of Unit#3 | 273 | Sq. M. | 116 ₹136.88 | 151 ₹178.18 | 159 ₹187.62 | 105 ₹123.9 | 120 ₹141.6 | 98 ₹115.64 Lowest | 110 ₹129.8 |
| 5.00 | Fencing of GT transformer yard Unit#1,2,3 | 150 | Sq. M. | 116 ₹136.88 | 151 ₹178.18 | 159 ₹187.62 | 90 ₹106.2 Lowest | 98 ₹115.64 | 98 ₹115.64 | 110 ₹129.8 |
| 6.00 | 20 Ton Gantry crane | 208 | Sq. M. | 116 ₹136.88 | 151 ₹178.18 | 159 ₹187.62 | 120 ₹141.6 | 115 ₹135.7 | 85 ₹100.3 Lowest | 110 ₹129.8 |
| 7.00 | Railing of power house | 125 | Sq. M. | 116 ₹136.88 | 151 ₹178.18 | 159 ₹187.62 | 90 ₹106.2 | 120 ₹141.6 | 87 ₹102.66 Lowest | 110 ₹129.8 |
| 8.00 | All fire fighting pipe line of power house | 472.87 | Sq. M. | 116 ₹136.88 | 151 ₹183.18 | 159 ₹187.62 | 90 ₹106.2 Lowest | 115 ₹135.7 | 120 ₹141.6 | 110 ₹129.8 |
Tender Value
₹8.0 L
EMD Value
₹16,000
Closing Date
11 May 2026, 3:00 pmClosed
ACE THC Sirmour
O/o ACE THC Sirmour
Work contract for painting of railings and various pipelines at power houses of THC Sirmour
2026_MPPGC_480493_1
480493
Open Tender
Miscellaneous Works
Lump-sum
10 days
Sirmour
As per NIT
13 documents required · 13 mandatory
₹500
Yes
₹16,000
Yes
15 Jun 2026
16 Mar 2026
13 May 2026
16 Mar 2026
11 May 2026
16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2" Railing and pipe lines surface area = 819.82 Sq M. | 999.95 | Sq. M. | - | - |
| 2 | (2"+ 21/2''+3/4) Railing + 4'' pipe line +5'' pipe line + 6'' pipe line + 10'' pipe line | 3,065.5 | Sq. M. | - | - |
| 3 | Painting of supporting flat angle (2 surface) surface area | 534.45 | Sq. M. | - | - |
| 4 | Generator Transformer & 11 KV bus duct of Unit#3 | 273 | Sq. M. | - | - |
| 5 | Fencing of GT transformer yard Unit#1,2,3 | 150 | Sq. M. | - | - |
| 6 | 20 Ton Gantry crane | 208 | Sq. M. | - | - |
| 7 | Railing of power house | 125 | Sq. M. | - | - |
| 8 | All fire fighting pipe line of power house | 472.87 | Sq. M. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
TechnicalBID.xls
Tender Documents • 0.32 MB
SBDWORKANDAMEND.pdf
Tender Documents • 4.57 MB
BOQ_580680.xls
BOQ • 0.30 MB
191.pdf
PDF • 0.40 MB
127.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .