Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.4 L+₹55,296.22 (2.32%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹24.4 L
EMD Value
₹49,000
Closing Date
3 Mar 2023, 3:00 pmClosed
Executive Engineer
Office E.E. S .D.K.1 Gonda
Retender of Constructing box culvert at km. 0.970 of Churra Murra Tal Drain Lot 10
2023_UPIDC_771717_16
03/EE/2023-23
Open Tender
Civil Works
Item Rate
90 days
Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹49,000
Yes
23 Jun 2023
25 Feb 2023
3 Mar 2023
25 Feb 2023
3 Mar 2023
25 Feb 2023
Amount
Earth work in making road diversion including all lead & lift, manual compaction and dressing to profile.
BOE soling on road diversion including preparation of subgradeand filling joint with local earth.
Earth work in making drain diversion /remodeling of drains above up to 1 Cumecs discharge including hard clay, charri bajri upto 5% lead upto 30 Meters, lift upto 1.5 Meters excluding\Mechanical compaction but inclusive of manual compaction and dressing to profiles.
P/Laying & fixing in alignment of 1000 mm dia NP-3 Hume pipe in diversion
P/Laying & fixing of 1000 mm dia coller
Earth work in excavation of foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.
Centering and Shuttering P.C.C. Work 1:2:4 (A40 M-15 ) in foundation including cost of all material, Labour and T&P etc. required for proper completion of the work.
Laying P. C.C. 1:2:4 (A40 M-15 ) in foundation with 20-40 mm size Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Centering and Shuttering for R.C.C. 1:1.50:3 (A20 M20) in raft,wing wall, barrel wall, slab & parapet ,wearing coat etc. including cost of all material, Labour and T&P etc. required for proper completion of the work.
Laying R.C.C. 1:1.50:3 (A20M20) in raft,wing wall, barrel wall, slab & parapet etc. with 4.75 to 20 mm size Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Laying R.C.C. in 1:1.50:3 (A-10-M-20) in wearing coat with 4.75 to 10 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour,T&P etc. required for proper completion of the work.
S/F 75 mm Dia spout pipe
Providing & fixing of wheel guard stone
Fabrication and supply sign board on angle iron frame 40 x 40 x5 mm, 25x5 mm flat iron sand 18 SWG MS sheet with one coat of red oxide primer including cost of all material, labour T&P etc. required for proper completion of work.
Earth work in making ramp in all type of soil including all lead & lify , manual compaction and dressing to profiles.
ASHFIQUE AHMAD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .