| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91,592.76Accepted-Finance H NO 1135 VOLVOLEN TIVIM BARDEZ GOA 403502 | TIVIM | BARDEZ | GOA | 403502 | ₹91,592.76 | L1 | Accepted-Finance Being L1 accepted |
| 2 | L2₹1.0 L+₹10,660.44 (11.6%)Rejected-Finance PLOT NO S 122 PHASE III B VERNA INDUSTRIAL ESTATE VERNA GOA 403 722 | VERNA | SOUTH GOA | GOA | 403722 | ₹1.0 L+₹10,660.44 (11.6%) | L2 | Rejected-Finance Being L2 rejected |
Tender Value
₹1.1 L
EMD Value
₹2,176
Closing Date
29 Apr 2026, 3:00 pmClosed
Executive Engineer WD XXII
WD XXII PWD Fatorda
Annual Servicing of 11/0.44kV substation equipments at Industrial Training Institute, Farmagudi.
2026_PWD_28832_1
3/26-27/PWD/WDXXII/MnE/ ASW/TN-03/13 dtd.21.04.2026
Open Tender
Electrical Works
Percentage
180 days
Ponda
Please refer Tender Notice TN-03 dtd 21.04.2026
6 documents required · 6 mandatory
₹4,000
Yes
₹2,176
Yes
25 May 2026
21 Apr 2026
30 Apr 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 315 KVA, 11/0.440 KV,320 liters transformer oil filtration along with testing of the first oil sample and sample at the end of filtration, testing of transformer for IR value before filtration and after filtration aimed at restoring the dielectric strength, removing moisture, gases, and particulates, and improving transformer performance and longevity. The process is to be carried out using a high-vacuum oil filtration plant as per relevant standards (IS/IEC)The job should be complete as per site conditions and departmental requirements. Necessary provision of supply to carry the job should be made available. | - | Job | - | - |
| 2 | Supply and topping up of new transformer oil | - | Liters | - | - |
| 3 | Servicing of 11 kV , 400A GOAB switch, with proper cleaning , greasing and alignment. | - | Job | - | - |
| 4 | cleaning of insulators , tightening of loose contacts , identifying any hotspots or discolouration, Complete servicing of double pole 11 kV structure, as per site conditions. | - | Job | - | - |
| 5 | Replacing of Silica gel breather as per site requirements | - | Nos. | - | - |
| 6 | Inspecting and tightening of HV/LV terminations for 11/0.44kV , 315kVA transformer | - | Job | - | - |
| 7 | Buchholz gasket replacement 11/0.44kV transformer | - | Job | - | - |
| 8 | LT side Terminal box gasket replacement of 315, 11/0.44kV transformer | - | Job | - | - |
| 9 | Conservator glass level replacement for 315 kVA . 11/0.44kV transformer | - | Job | - | - |
| 10 | Servicing and overhauling of LT box and applying insulation coating of complete terminal box, cable and bus bar for 315 kVA , 11/0.44kV transformer | - | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 0.84 MB
Tendernotice_3.pdf
PDF • 0.46 MB
Tendernotice_4.pdf
PDF • 0.21 MB
BOQ_29269.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .