Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.5 LAccepted-AOC | ₹59.5 L | L1 | Accepted-AOC Sri Ramadash Hansdah B class Diploma Engineering Contractor winner of the Lottery |
| 2 | L1₹59.5 LRejected-AOC | ₹59.5 L | L1 | Rejected-AOC Sri Ramadash Hansdah B class Diploma Engineering Contractor winner of the Lottery |
| 3 | L1₹59.5 LRejected-AOC | ₹59.5 L | L1 | Rejected-AOC Sri Ramadash Hansdah B class Diploma Engineering Contractor winner of the Lottery |
| 4 | L1₹59.5 LRejected-AOC | ₹59.5 L | L1 | Rejected-AOC Sri Ramadash Hansdah B class Diploma Engineering Contractor winner of the Lottery |
| 5 | L1₹59.5 LRejected-AOC | ₹59.5 L | L1 | Rejected-AOC Sri Ramadash Hansdah B class Diploma Engineering Contractor winner of the Lottery |
Tender Value
₹60.1 L
EMD Value
₹60,200
Closing Date
24 Jul 2026, 5:30 pmClosed
O/O SE,DHWD,Karanjia
O/O SE,Deo Head Works Division, Karanjia
Construction of boundary wall for Thakurani salo of Hatibari RR colony I of DIP.
2026_CCEDI_134927_1
02/SEDHWD/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Hatibari
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
₹60,200
Yes
10 Sept 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
10 Jul 2026 - 22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area etc complete but excluding GST as directed by the Engineer-in-charge. | 7,880 | Sqm | 2.8 | ₹22,064 |
| 2 | Earth work in excavation of foundation in hard soil or gravelly soil with all lead & lift including dressing & levelling the bed of the foundation to the required width & depth & stacking the excavated materials away from the working areas etc.complete but excluding GST as per the direction of the Engineer-in-Charge. | 362.81 | Cum | 230.7 | ₹83,700.27 |
| 3 | Providing and filling clean dry sand of approved quality from approved quarry in foundation and plinth in 9" thick layer well watered and rammed incl. cost,conveyance, royalties and taxes of all materials etc.complete but excluding GST as per the direction of the Engineer-in-Charge. | 72.51 | Cum | 1,227.4 | ₹88,998.77 |
| 4 | Cement concrete M15 Grade with crushed granite coarse aggregarate 40mm down graded of approved quality mixed by concrete mixer and placing manually, compacting with vibrators including cost of all materials, labour charges with transportion of materials and placement within initial lead of 50m and initial lift of 1.50m for mixed concrete complete but excluding GST as directed by Engineer-in-charge. | 86.73 | Cum | 5,876.1 | ₹5,09,634.15 |
| 5 | Cement concrete M15 Grade with crushed granite coarse aggregarate 20mm down graded of approved quality mixed by concrete mixer and placing manually, compacting with vibrators including cost of all materials, labour charges with transportion of materials and placement within initial lead of 50m and initial lift of 1.50m for mixed concrete completebut excluding GST as directed by Engineer-in-charge. | 44.55 | Cum | 6,193.4 | ₹2,75,915.97 |
| 6 | R.C.C. work of M-20 grade with 20mm and down grade crushed granite coarse aggregarate 20mm down graded of approved quality mixed by concrete mixer and placing manually, compacting with vibrators including cost of all materials, labour charges with transportion of materials and placement within initial lead of 50m and initial lift of 1.50m for mixed concrete complete but excluding GST as directed by Engineer-in-charge. | 116.85 | Cum | 6,697.8 | ₹7,82,637.93 |
| 7 | Cutting, straightening, coiled or bent up T. S. rod for R.C.C. work incl. bending, binding & tying the grills and placing in proper position with cost, conveyance,taxes of binding wire 18 to 20 gauge and T.S. rod, cost of all labour & T&P etc complete but excluding GST as per the direction of the Engineer-in-Charge. | 105.17 | Qntl | 8,823.6 | ₹9,27,978.01 |
| 8.1 | Rigid and smooth centering and shuttering for RC.C. works including false works and dismentalling then after casting with cost, conveyance & taxes of all materials, cost of labour and T&P etc. all complete but excluding GST as per the direction of Engineer-in-charge. (A) For plinth band ,column footing mass concrete and pre cast slabs
A) R.C.C. foundation, plinth band and footings bases of columns mass concrete precast
slabs etc | 338.4 | Sqm | 248.7 | ₹84,160.08 |
| 8.2 | B) For beam and coloumn . | 623.52 | Sqm | 1,195.6 | ₹7,45,480.51 |
| 9 | Fly Ash Brick masonry in C.M. (1:6) using Fly Ash Brick of size 25cmx12cmx 8cm of crushing strength not less than 75kg/cm2 with dimentional tolerance plus minus 2% after immersing the bricks for six hours befour use incl.lowering, placing in position, watering and curing and cost, conveyance, royalties and taxes of all materials, cost of labour & T&P etc. complete but excluding GST as per the direction of the Engineer-in-Charge. (In foundation and plinth) | 113.47 | Cum | 5,869 | ₹6,65,955.43 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_600450.xls
BOQ • 0.30 MB
BidBWall.pdf
Tender Documents • 16.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .