Tender Value
₹41.2 L
EMD Value
₹41,200
Closing Date
13 Oct 2026, 5:00 pm5d left
Executive Engineer
RURAL WORKS DIVISION, BHANJANAGAR
Construction of 1 No.D Type Quarter for AEE at R.W.Sub-Division, Sorada for the year 2025-26-Building
2026_CERWI_141697_1
Online Tender/09/RWDBNJ/2026-2027
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Ganjam
2 documents required · 2 mandatory
₹6,000
₹41,200
Yes
29 Sept 2026
29 Sept 2026
14 Oct 2026
29 Sept 2026
13 Oct 2026
29 Sept 2026
29 Sept 2026 - 12 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in ordinary soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. | 549.18 | cum | 210.52 | ₹1,15,613.37 |
| 2 | Filling Foundation and plinth with sand and well watered and rammed etc complete | 73.93 | cum | 521.37 | ₹38,544.88 |
| 3 | C.C. (1:3:6) using 40 mm size H.G. metal ( H.B. ) of approved quality with all cost, carriage, T&P, royalty etc of all materials complete. | 61.82 | cum | 5,888.28 | ₹3,64,013.47 |
| 4 | C.C. (1:4:8) using 40 mm size H.G. metal ( H.B. ) of approved quality with all cost, carriage, T&P, royalty etc of all materials complete. | 15.45 | cum | 5,477.78 | ₹84,631.7 |
| 5 | Fly ash brick masonry using fly ash bricks of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with cement after immersing the bricks for 6 (Six) hours in water before use in foundation including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | 61.64 | cum | 5,636.04 | ₹3,47,405.51 |
| 7 | In Super Structure | 61.08 | cum | 5,669.37 | ₹3,46,285.12 |
| 8 | Providing and laying in position ready mixed M-25 grade concrete having compressive strength at 28 days test not less than 300 kg/ sq.cm for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , including the cost of centering, shuttering finishing and excluding reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, and hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour,Labour cess and T&P required for the work improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Column Base | 20.99 | cum | 7,033.61 | ₹1,47,635.47 |
| 9 | Grade Beam | 6.27 | cum | 7,908.02 | ₹49,583.29 |
| 10 | Column | 8.33 | sqm | 18,855.86 | ₹1,57,069.31 |
| 11 | Chajja | 11.52 | sqm | 1,262.29 | ₹14,541.58 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 6.62 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_610864.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .